X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "31-013-18603"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 31-013-18603
 
| Well ID: 31-013-18603
| style="height=100%; align=center" rowspan="15" | {{#display_map: 42.26158, -79.25598 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 42.261580000, -79.25597999 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Chautauqua County, New York|Chautauqua]]
+
| Well Name: Strata Unit1
 
|-
 
|-
| Municipality:  
+
| Country: United States
 
|-
 
|-
| Operator Name: [[Shelex Drilling, Inc.]]
+
| State: New York
 
|-
 
|-
| Well Pad ID:  
+
| County: [[Chautauqua_County,_New_York|Chautauqua]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Municipality: [[Charlotte,_Chautauqua_County,_New_York|Charlotte]]
 
|-
 
|-
| First Permit Date: 1983-10-11
+
| Operator Name:  
 
|-
 
|-
| Last Permit Date: 1983-10-11
+
| Well Status: Active
 
|-
 
|-
 
| Spud Date: 1983-10-20
 
| Spud Date: 1983-10-20
 
|-
 
|-
| Unconventional: No
+
| Permit Date: 1983-10-11
 +
|-
 +
| Well Completion Date: 1983-11-10
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Active
+
| Measured Well Depth (ft): 3582
 +
|-
 +
| Latitude: 42.261580000
 +
|-
 +
| Longitude: -79.25597999
 +
|}
 +
For data sources see<ref name="well">{{cite web
 +
| title = Public Wells Data
 +
|publisher = New York State Department of Environmental Conservation
 +
| date = 2019-08-09
 +
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-08-09 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Fluid Type
 +
!scope="col" | Fluid Quantity
 +
!scope="col" | Fluid Production Time
 +
|-
 +
| 1986
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 6459 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1987
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 5163 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1988
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1550 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1989
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 4211 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1990
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 6692 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1991
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 3380 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1992
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1003 Mcf
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 1993
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1619 Mcf
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 1994
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2070 Mcf
 +
| style="text-align: right;" | 9 Months
 +
|-
 +
| 1995
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 350 Mcf
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 1996
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2757 Mcf
 +
| style="text-align: right;" | 7 Months
 +
|-
 +
| 1997
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2862 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1998
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 237 Mcf
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1999
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2441 Mcf
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 2000
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1268 Mcf
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1501 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 654 Mcf
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2003
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 710 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2004
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1101 Mcf
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2005
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 450 Mcf
 +
| style="text-align: right;" | 1 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2027 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2007
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 991 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2008
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 0 Mcf
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 2008
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1214 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 869 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 804 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 771 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 521 Mcf
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 504 Mcf
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 428 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 497 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 731 Mcf
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 541 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
|}
 +
For data sources see<ref name = "prod">{{cite web
 +
| title =New York Natural Gas and Oil Production
 +
|publisher = New York State Department of Environmental Conservation
 +
| date = 2019-07-01
 +
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-08-07 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Time Produced
 +
|-
 +
| 1986
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1987
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1988
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 150 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1989
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1990
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 103 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1991
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 107 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1992
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 1993
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 1994
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 9 Months
 +
|-
 +
| 1995
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 1996
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 7 Months
 +
|-
 +
| 1997
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1998
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1999
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 25 Bbl
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2005
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 1 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2007
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2008
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 50 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 20 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
| Violations: 0
+
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
| Latitude: 42.26158
+
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 10 Months
 
|-
 
|-
| Longitude: -79.25598
+
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref name="prod" />
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Event Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event Description
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
|  
+
| 1983-10-11
| style="text-align:right;" | 521.0
+
| New Permit Issued.
|
 
|  
 
|
 
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name="well" />
| title = New York State Department of Environmental Conservation
+
==References==
| publisher = [http://www.dec.ny.gov/cfmx/extapps/GasOil/search/production/index.cfm]
+
<references/>
| date = 2015-07-07
 
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-07-07 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:New York Wells]]

Revision as of 19:37, 4 September 2019

Well Details

Well ID: 31-013-18603
Loading map...
Well Name: Strata Unit1
Country: United States
State: New York
County: Chautauqua
Municipality: Charlotte
Operator Name:
Well Status: Active
Spud Date: 1983-10-20
Permit Date: 1983-10-11
Well Completion Date: 1983-11-10
Configuration: Vertical
Measured Well Depth (ft): 3582
Latitude: 42.261580000
Longitude: -79.25597999

For data sources see[1]

Production Data

Period Operator Name Fluid Type Fluid Quantity Fluid Production Time
1986 Shelex Drilling Inc. GAS 6459 Mcf 12 Months
1987 Shelex Drilling Inc. GAS 5163 Mcf 12 Months
1988 Shelex Drilling Inc. GAS 1550 Mcf 12 Months
1989 Shelex Drilling Inc. GAS 4211 Mcf 12 Months
1990 Shelex Drilling Inc. GAS 6692 Mcf 12 Months
1991 Shelex Drilling Inc. GAS 3380 Mcf 12 Months
1992 Shelex Drilling Inc. GAS 1003 Mcf 8 Months
1993 Shelex Drilling Inc. GAS 1619 Mcf 4 Months
1994 Shelex Drilling Inc. GAS 2070 Mcf 9 Months
1995 Shelex Drilling Inc. GAS 350 Mcf 6 Months
1996 Shelex Drilling Inc. GAS 2757 Mcf 7 Months
1997 Shelex Drilling Inc. GAS 2862 Mcf 12 Months
1998 Shelex Drilling Inc. GAS 237 Mcf 2 Months
1999 Shelex Drilling Inc. GAS 2441 Mcf 6 Months
2000 Shelex Drilling Inc. GAS 1268 Mcf 6 Months
2001 Shelex Drilling Inc. GAS 1501 Mcf 12 Months
2001 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2002 Shelex Drilling Inc. GAS 654 Mcf 4 Months
2002 Shelex Drilling Inc. OIL 0 Bbl 4 Months
2003 Shelex Drilling Inc. GAS 710 Mcf 12 Months
2004 Shelex Drilling Inc. GAS 1101 Mcf 4 Months
2005 Shelex Drilling Inc. GAS 450 Mcf 1 Months
2006 Shelex Drilling Inc. GAS 2027 Mcf 11 Months
2006 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2007 Shelex Drilling Inc. GAS 991 Mcf 11 Months
2008 Shelex Drilling Inc. GAS 0 Mcf 0 Months
2008 Shelex Drilling Inc. OIL 0 Bbl 0 Months
2009 Shelex Drilling Inc. GAS 1214 Mcf 11 Months
2009 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2010 Shelex Drilling Inc. GAS 869 Mcf 11 Months
2010 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2011 Shelex Drilling Inc. GAS 804 Mcf 11 Months
2011 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2012 Shelex Drilling Inc. GAS 771 Mcf 11 Months
2012 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2013 Shelex Drilling Inc. GAS 521 Mcf 10 Months
2013 Shelex Drilling Inc. OIL 0 Bbl 10 Months
2014 Shelex Drilling Inc. GAS 504 Mcf 8 Months
2014 Shelex Drilling Inc. OIL 0 Bbl 8 Months
2015 Shelex Drilling Inc. GAS 428 Mcf 12 Months
2015 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2016 Shelex Drilling Inc. GAS 497 Mcf 12 Months
2016 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2017 Shelex Drilling Inc. GAS 731 Mcf 10 Months
2017 Shelex Drilling Inc. OIL 0 Bbl 10 Months
2018 Shelex Drilling Inc. GAS 541 Mcf 12 Months
2018 Shelex Drilling Inc. OIL 0 Bbl 12 Months

For data sources see[2]

Waste Data

Period Operator Waste Type Quantity Time Produced
1986 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1987 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1988 Shelex Drilling Inc. WATER 150 Bbl 12 Months
1989 Shelex Drilling Inc. WATER 5 Bbl 12 Months
1990 Shelex Drilling Inc. WATER 103 Bbl 12 Months
1991 Shelex Drilling Inc. WATER 107 Bbl 12 Months
1992 Shelex Drilling Inc. WATER 0 Bbl 8 Months
1993 Shelex Drilling Inc. WATER 0 Bbl 4 Months
1994 Shelex Drilling Inc. WATER 0 Bbl 9 Months
1995 Shelex Drilling Inc. WATER 0 Bbl 6 Months
1996 Shelex Drilling Inc. WATER 0 Bbl 7 Months
1997 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1998 Shelex Drilling Inc. WATER 0 Bbl 2 Months
1999 Shelex Drilling Inc. WATER 25 Bbl 6 Months
2001 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2002 Shelex Drilling Inc. WATER 0 Bbl 4 Months
2005 Shelex Drilling Inc. WATER 0 Bbl 1 Months
2006 Shelex Drilling Inc. WATER 0 Bbl 11 Months
2007 Shelex Drilling Inc. WATER 0 Bbl 11 Months
2008 Shelex Drilling Inc. WATER 0 Bbl 0 Months
2009 Shelex Drilling Inc. WATER 50 Bbl 11 Months
2010 Shelex Drilling Inc. WATER 0 Bbl 11 Months
2011 Shelex Drilling Inc. WATER 0 Bbl 11 Months
2012 Shelex Drilling Inc. WATER 20 Bbl 11 Months
2013 Shelex Drilling Inc. WATER 5 Bbl 10 Months
2014 Shelex Drilling Inc. WATER 5 Bbl 8 Months
2015 Shelex Drilling Inc. WATER 5 Bbl 12 Months
2016 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2017 Shelex Drilling Inc. WATER 0 Bbl 10 Months
2018 Shelex Drilling Inc. WATER 0 Bbl 12 Months

For data sources see[2]

Well History

Event Date Event Description
1983-10-11 New Permit Issued.

For data sources see[1]

References

  1. 1.0 1.1 "Public Wells Data". New York State Department of Environmental Conservation. 2019-08-09. Retrieved 2019-08-09. 
  2. 2.0 2.1 "New York Natural Gas and Oil Production". New York State Department of Environmental Conservation. 2019-07-01. Retrieved 2019-08-07.