If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-053-29668 | | Well ID: 37-053-29668 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.577364, -79.291953 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: FLYNN FARM 1203 | | Farm/Lease Name: FLYNN FARM 1203 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: 12 | + | | Permit Date: 2009-12-03 |
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.577364 | | Latitude: 41.577364 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2009-12-03 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-02-23 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-02-24 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2010-04-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2010-08-03 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 67: | Line 133: | ||
| style="text-align: right;" | 275 | | style="text-align: right;" | 275 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
Line 76: | Line 142: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 130: | Line 196: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 43.21 | | style="text-align: right;" | 43.21 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,040.25 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 52.58 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 4,299.05 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
|- | |- | ||
Line 142: | Line 217: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 147: | Line 223: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010- | + | | 2010 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 14.48 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 4.17 Bbl | | style="text-align: right;" | 4.17 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | | + | | 2011 |
− | + | | [[CATALYST ENERGY INC]] | |
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | | | ||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 4.17 Bbl | | style="text-align: right;" | 4.17 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 9.96 Bbl | | style="text-align: right;" | 9.96 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 3.48 Bbl | | style="text-align: right;" | 3.48 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 0.45 Bbl | | style="text-align: right;" | 0.45 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 0.45 Bbl |
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1.98 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
| | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 18.80 Bbl | | style="text-align: right;" | 18.80 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2018- | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4.55 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | PAS2D215BWAR | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 6.36 Bbl | | style="text-align: right;" | 6.36 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-24079 | | 34-155-24079 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 0.00 Bbl |
− | | | + | | CENT WASTE TRT FAC NPDES DISCHARGE |
+ | | PA0101508 | ||
|- | |- | ||
|} | |} | ||
Line 226: | Line 326: | ||
| 1849218 | | 1849218 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2009-12-09 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 233: | Line 333: | ||
| 2271948 | | 2271948 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2014-05-20 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 252: | Line 352: | ||
| 577624 | | 577624 | ||
| 12/09/2009 | | 12/09/2009 | ||
− | | | + | | 2009-12-09 |
| 102.4INADPLN - E&S Plan not adequate | | 102.4INADPLN - E&S Plan not adequate | ||
| Administrative | | Administrative | ||
Line 274: | Line 374: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 12 | + | | 2010-12-28 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 285: | Line 385: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-053-29668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.577364,"lon":-79.291953,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Forest | |
Municipality: Kingsley Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: FLYNN FARM 1203 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-12-03 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.577364 | |
Longitude: -79.291953 |
Date | Event |
---|---|
2009-12-03 | New Permit Application |
2010-02-23 | Performed Spud Operation |
2010-02-24 | Drilling Completion |
2010-04-14 | Perforation |
2010-08-03 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CATALYST ENERGY INC | 1,863.22 | 275 | 560.35 | 275 | 0.00 | 0 |
2011 | CATALYST ENERGY INC | 241.35 | 365 | 687.83 | 365 | 0.00 | 0 |
2012 | CATALYST ENERGY INC | 3,424.22 | 366 | 452.43 | 366 | 3.48 | 366 |
2014 | CATALYST ENERGY INC | 2,025.70 | 365 | 281.74 | 365 | 82.88 | 365 |
2015 | CATALYST ENERGY INC | 1,672.03 | 304 | 111.35 | 304 | 105.23 | 304 |
2016 | CATALYST ENERGY INC | 1,110.93 | 304 | 97.62 | 304 | 77.84 | 304 |
2017 | CATALYST ENERGY INC | 566.10 | 365 | 82.66 | 365 | 41.69 | 365 |
2018 | CATALYST ENERGY INC | 1,552.78 | 365 | 97.64 | 365 | 43.21 | 365 |
2019 | CATALYST ENERGY INC | 1,040.25 | 365 | 52.58 | 365 | 4,299.05 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CATALYST ENERGY INC | Produced Fluid | 14.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2010 | CATALYST ENERGY INC | Produced Fluid | 4.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CATALYST ENERGY INC | Drilling Fluid Waste | 4.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | CATALYST ENERGY INC | Produced Fluid | 9.96 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | CATALYST ENERGY INC | Produced Fluid | 3.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 0.45 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 0.45 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 1.98 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | CATALYST ENERGY INC | Produced Fluid | 18.80 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 4.55 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 6.36 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 0.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1849218 | Primary Facility | 2009-12-09 | Routine/Complete Inspection | Violation(s) Noted | |
2271948 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1849218 | 577624 | 12/09/2009 | 2009-12-09 | 102.4INADPLN - E&S Plan not adequate | Administrative | plan not adequate |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
577624 | 253415 | NOV - Notice of Violation | Comply/Closed | 2010-12-28 |
For data sources see[7]