X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-29668"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-29668
 
| Well ID: 37-053-29668
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.577364, -79.291953 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.577364, -79.291953 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: FLYNN FARM 1203
 
| Farm/Lease Name: FLYNN FARM 1203
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 02/23/2010
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/3/2009
+
| Permit Date: 2009-12-03
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.577364
 
| Latitude: 41.577364
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-12-03
 +
| New Permit Application
 +
|-
 +
| 2010-02-23
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-24
 +
| Drilling Completion
 +
|-
 +
| 2010-04-14
 +
| Perforation
 +
|-
 +
| 2010-08-03
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 133:
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 76: Line 142:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 130: Line 196:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 43.21
 
| style="text-align: right;" | 43.21
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,040.25
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 52.58
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 4,299.05
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 142: Line 217:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 147: Line 223:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 14.48 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0102784
 +
|-
 +
| 2010
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 4.17 Bbl
 
| style="text-align: right;" | 4.17 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 14.48 Bbl
+
| Drilling Fluid Waste
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
|-
 
| 2011-0
 
| Drilling Fluid Waste (in Barrels)
 
 
| style="text-align: right;" | 4.17 Bbl
 
| style="text-align: right;" | 4.17 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 9.96 Bbl
 
| style="text-align: right;" | 9.96 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 3.48 Bbl
 
| style="text-align: right;" | 3.48 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 0.45 Bbl
 
| style="text-align: right;" | 0.45 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2017-0
+
| 2014
| Waste comment only
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | Comment
+
| Produced Fluid
|  
+
| style="text-align: right;" | 0.45 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1.98 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 18.80 Bbl
 
| style="text-align: right;" | 18.80 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4.55 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 6.36 Bbl
 
| style="text-align: right;" | 6.36 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
| 34-155-24079
 
|-
 
|-
| 2018-0
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 4.55 Bbl
+
| Produced Fluid
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00 Bbl
| PAS2D215BWAR
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 
|-
 
|-
 
|}
 
|}
Line 226: Line 326:
 
| 1849218
 
| 1849218
 
| Primary Facility
 
| Primary Facility
| 12/09/2009
+
| 2009-12-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 233: Line 333:
 
| 2271948
 
| 2271948
 
| Primary Facility
 
| Primary Facility
| 05/20/2014
+
| 2014-05-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 252: Line 352:
 
| 577624
 
| 577624
 
| 12/09/2009
 
| 12/09/2009
| 04/06/2010
+
| 2009-12-09
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 274: Line 374:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/28/2010
+
| 2010-12-28
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 285: Line 385:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 08:26, 14 May 2020

Well Details

Well ID: 37-053-29668
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Kingsley Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: FLYNN FARM 1203
License Status:
Spud Date:
Permit Date: 2009-12-03
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.577364
Longitude: -79.291953

For data sources see[1][2][3]

Well History

Date Event
2009-12-03 New Permit Application
2010-02-23 Performed Spud Operation
2010-02-24 Drilling Completion
2010-04-14 Perforation
2010-08-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CATALYST ENERGY INC 1,863.22 275 560.35 275 0.00 0
2011 CATALYST ENERGY INC 241.35 365 687.83 365 0.00 0
2012 CATALYST ENERGY INC 3,424.22 366 452.43 366 3.48 366
2014 CATALYST ENERGY INC 2,025.70 365 281.74 365 82.88 365
2015 CATALYST ENERGY INC 1,672.03 304 111.35 304 105.23 304
2016 CATALYST ENERGY INC 1,110.93 304 97.62 304 77.84 304
2017 CATALYST ENERGY INC 566.10 365 82.66 365 41.69 365
2018 CATALYST ENERGY INC 1,552.78 365 97.64 365 43.21 365
2019 CATALYST ENERGY INC 1,040.25 365 52.58 365 4,299.05 365

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 14.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 CATALYST ENERGY INC Produced Fluid 4.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CATALYST ENERGY INC Drilling Fluid Waste 4.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 9.96 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 3.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 0.45 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 0.45 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 1.98 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 CATALYST ENERGY INC Produced Fluid 18.80 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 4.55 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 6.36 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 0.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1849218 Primary Facility 2009-12-09 Routine/Complete Inspection Violation(s) Noted
2271948 Primary Facility 2014-05-20 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1849218 577624 12/09/2009 2009-12-09 102.4INADPLN - E&S Plan not adequate Administrative plan not adequate

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
577624 253415 NOV - Notice of Violation Comply/Closed 2010-12-28

For data sources see[7]

References