If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: 035-21227 | + | | Well ID: 37-035-21227 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.369308, -77.559458 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Clinton_County,_Pennsylvania|Clinton]] |
+ | |- | ||
+ | | Municipality: [[Grugan Township,_Clinton_County,_Pennsylvania|Grugan Township]] | ||
+ | |- | ||
+ | | Operator Name: [[ARD OPR LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: [[148052]] | ||
|- | |- | ||
| Farm/Lease Name: COP TRACT 285 B1004H | | Farm/Lease Name: COP TRACT 285 B1004H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2010-11-18 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
| Latitude: 41.369308 | | Latitude: 41.369308 | ||
|- | |- | ||
| Longitude: -77.559458 | | Longitude: -77.559458 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-09-10 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-11-18 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-12-30 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2011-04-01 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2012-04-19 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 644,146.00 | ||
+ | | style="text-align: right;" | 237 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 520,438.00 | ||
+ | | style="text-align: right;" | 351 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 426,908.00 | ||
+ | | style="text-align: right;" | 329 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 329,530.00 | ||
+ | | style="text-align: right;" | 338 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 225,550.00 | ||
+ | | style="text-align: right;" | 231 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | style="text-align: right;" | 242,698.00 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | style="text-align: right;" | 191,459.18 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | style="text-align: right;" | 166,050.55 | ||
+ | | style="text-align: right;" | 360 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | style="text-align: right;" | 153,261.61 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,636.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,766.60 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,940.47 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 821.35 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 161.67 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 66.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 9.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 10.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 164.57 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 270.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 65.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 38.00 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 26.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 10.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR119 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 126.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 23.32 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ANADARKO E&P ONSHORE LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 59.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NC010 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 85.30 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[ARD OPR LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 230.80 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == | + | | title =Oil and Gas Waste Reports |
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1933657 | | 1933657 | ||
+ | | Primary Facility | ||
| 2010-12-08 | | 2010-12-08 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Precision 528 drilling a 12 1/4" hole @ 1240' | | Precision 528 drilling a 12 1/4" hole @ 1240' | ||
− | |||
− | |||
|- | |- | ||
| 1934553 | | 1934553 | ||
+ | | Primary Facility | ||
| 2010-12-10 | | 2010-12-10 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1939664 | | 1939664 | ||
+ | | Primary Facility | ||
| 2010-12-28 | | 2010-12-28 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Drilled to TD of 13151' Tripping out of hole and preparing to run casing. | | Drilled to TD of 13151' Tripping out of hole and preparing to run casing. | ||
− | |||
− | |||
|- | |- | ||
| 1939844 | | 1939844 | ||
+ | | Primary Facility | ||
| 2010-12-30 | | 2010-12-30 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1942754 | | 1942754 | ||
+ | | Primary Facility | ||
| 2011-01-06 | | 2011-01-06 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Well drilled to TD, production casing cemented. | | Well drilled to TD, production casing cemented. | ||
− | |||
− | |||
|- | |- | ||
| 1944097 | | 1944097 | ||
+ | | Primary Facility | ||
| 2011-01-20 | | 2011-01-20 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1955814 | | 1955814 | ||
+ | | Primary Facility | ||
| 2011-03-08 | | 2011-03-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1957114 | | 1957114 | ||
+ | | Primary Facility | ||
| 2011-03-14 | | 2011-03-14 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1962234 | | 1962234 | ||
+ | | Primary Facility | ||
| 2011-03-31 | | 2011-03-31 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1966221 | | 1966221 | ||
+ | | Primary Facility | ||
| 2011-04-13 | | 2011-04-13 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1970591 | | 1970591 | ||
+ | | Primary Facility | ||
| 2011-04-29 | | 2011-04-29 | ||
+ | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 1972033 | | 1972033 | ||
+ | | Primary Facility | ||
| 2011-05-09 | | 2011-05-09 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2027927 | | 2027927 | ||
+ | | Primary Facility | ||
| 2011-12-06 | | 2011-12-06 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2039263 | | 2039263 | ||
+ | | Primary Facility | ||
| 2012-01-03 | | 2012-01-03 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2062132 | | 2062132 | ||
+ | | Primary Facility | ||
| 2012-03-15 | | 2012-03-15 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2105080 | | 2105080 | ||
+ | | Primary Facility | ||
| 2012-09-19 | | 2012-09-19 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2190409 | ||
+ | | Primary Facility | ||
+ | | 2013-08-08 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
− | | | + | | 2553223 |
− | + | | Primary Facility | |
− | + | | 2017-01-09 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2695846 |
− | | | + | | Primary Facility |
− | | | + | | 2018-02-13 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285B Pad, Well #1004H, on February 13, 2018. | |
− | + | There are 6 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading -230 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 146 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. | |
+ | DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. | ||
|- | |- | ||
+ | | 2760259 | ||
+ | | Primary Facility | ||
+ | | 2018-07-25 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On July 25, 2018, Department representative Sue Herzing conducted a routine site inspection at COP TRACT 285 PAD B. The site sign, emergency response plan, monthly tank maintenance log, ESCGP, weekly E&S inspection log, and drilling permits were onsite for review. No E&S issues were observed during the time of my inspection. A PCSM infiltration berm consisting of a 24" seeded compost sock has been installed according to PCSM plans. This compost infiltration berm is well vegetated and appears to be functioning as design. The pad remains the original footprint size of 400' x 400'. According to the operators PCSM plans, this the smallest "in production" workable footprint size. The following remain in place along the access road and appear to be functioning as design: rock lined roadside ditches and ditch relief culverts with rip-rap aprons. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover. | ||
+ | |||
+ | There are a total of 6 producing wells located on this well pad. All wel | ||
|- | |- | ||
− | | | + | | 2845172 |
− | | | + | | Primary Facility |
− | | | + | | 2019-02-26 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | Inspection was in response to a deficient tank notification from ARD received on 2/25/19. A hole was discovered above the water level, and the tank was taken out of service and pumped down. I immediately noted several rust streaks on the #1 tank, and also noted that the #3 tank had similar rust streaks; I recommend that the #3 tank be monitored carefully for integrity. 3-4" of ice was present in the production tank containment; although the capacity of the containment did not appear to be significantly reduced, I recommend that when conditions warrant that this containment be vacced out. The GPU containment was full to the top of the berm with ice; I recommend that this be vacced as soon as reasonably possible. | |
− | |||
|- | |- | ||
− | | | + | | 2855411 |
− | | | + | | Primary Facility |
− | | | + | | 2019-03-18 |
− | + | | Routine/Complete Inspection | |
− | | | + | | No Violations Noted |
− | | | + | | Weather was 20 degrees and sunny. There were no Alta representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment. Well had 133 PSI on the production tubing and 173 PSI on the production casing. Well had 2 visible annulus vents plumbed to surface. 1' annulus vent had a 0 to 600 PSI analog pressure gauge reading approximately 0 PSI. 2' annulus vent had a 0 to 3K PSI analog pressure gauge reading approximately 1750 PSI. 0% combustible gas was detected around the well. No violations at time of inspection. |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | + | !scope="col" | Violation Date | |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | + | !scope="col" | Violation Type | |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | !scope="col" | | ||
− | !scope="col" | | ||
|- | |- | ||
− | | | + | |}--> |
− | + | <!--==== Penalties Applied ==== | |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" | Violation ID |
− | | | + | !scope="col" | Penalty ID |
− | | | + | !scope="col" | Penalty Code |
− | | | + | !scope="col" | Penalty Status |
− | | | + | !scope="col" | Penalty Date |
− | | | + | !scope="col" | Enforcement Date |
− | | | + | !scope="col" | Penalty Amount |
− | + | !scope="col" | Amount Collected | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | |} | + | |}--> |
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-035-21227 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.369308,"lon":-77.559458,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Grugan Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 148052 | |
Farm/Lease Name: COP TRACT 285 B1004H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.369308 | |
Longitude: -77.559458 |
Date | Event |
---|---|
2010-09-10 | Performed Spud Operation |
2010-11-18 | New Permit Application |
2010-12-30 | Drilling Completion |
2011-04-01 | Perforation |
2012-04-19 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ANADARKO E&P ONSHORE LLC | 644,146.00 | 237 | 0.00 | 0 | 0.00 | 0 |
2012 | ANADARKO E&P ONSHORE LLC | 520,438.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2013 | ANADARKO E&P ONSHORE LLC | 426,908.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 329,530.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 225,550.00 | 231 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 242,698.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 191,459.18 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ARD OPR LLC | 166,050.55 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | ARD OPR LLC | 153,261.61 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 2,636.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2012 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,766.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,940.47 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 821.35 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 161.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 9.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 164.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 270.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 65.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 38.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 26.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 126.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | ARD OPR LLC | Produced Fluid | 23.32 Bbl | REUSE (AT WELL PAD) | |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 59.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ARD OPR LLC | Produced Fluid | 85.30 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 230.80 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1933657 | Primary Facility | 2010-12-08 | Drilling/Alteration | No Violations Noted | Precision 528 drilling a 12 1/4" hole @ 1240' |
1934553 | Primary Facility | 2010-12-10 | Routine/Partial Inspection | No Violations Noted | |
1939664 | Primary Facility | 2010-12-28 | Drilling/Alteration | No Violations Noted | Drilled to TD of 13151' Tripping out of hole and preparing to run casing. |
1939844 | Primary Facility | 2010-12-30 | Routine/Partial Inspection | No Violations Noted | |
1942754 | Primary Facility | 2011-01-06 | Drilling/Alteration | No Violations Noted | Well drilled to TD, production casing cemented. |
1944097 | Primary Facility | 2011-01-20 | Routine/Partial Inspection | No Violations Noted | |
1955814 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1957114 | Primary Facility | 2011-03-14 | Routine/Complete Inspection | No Violations Noted | |
1962234 | Primary Facility | 2011-03-31 | Routine/Partial Inspection | No Violations Noted | |
1966221 | Primary Facility | 2011-04-13 | Routine/Partial Inspection | No Violations Noted | |
1970591 | Primary Facility | 2011-04-29 | Routine/Partial Inspection | No Violations Noted | |
1972033 | Primary Facility | 2011-05-09 | Routine/Complete Inspection | No Violations Noted | |
2027927 | Primary Facility | 2011-12-06 | Routine/Complete Inspection | No Violations Noted | |
2039263 | Primary Facility | 2012-01-03 | Routine/Complete Inspection | No Violations Noted | |
2062132 | Primary Facility | 2012-03-15 | Routine/Complete Inspection | No Violations Noted | |
2105080 | Primary Facility | 2012-09-19 | Routine/Complete Inspection | No Violations Noted | |
2190409 | Primary Facility | 2013-08-08 | Routine/Complete Inspection | No Violations Noted | |
2553223 | Primary Facility | 2017-01-09 | Routine/Complete Inspection | No Violations Noted | |
2695846 | Primary Facility | 2018-02-13 | Routine/Complete Inspection | No Violations Noted | The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285B Pad, Well #1004H, on February 13, 2018.
There are 6 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading -230 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 146 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2760259 | Primary Facility | 2018-07-25 | Routine/Complete Inspection | No Violations Noted | On July 25, 2018, Department representative Sue Herzing conducted a routine site inspection at COP TRACT 285 PAD B. The site sign, emergency response plan, monthly tank maintenance log, ESCGP, weekly E&S inspection log, and drilling permits were onsite for review. No E&S issues were observed during the time of my inspection. A PCSM infiltration berm consisting of a 24" seeded compost sock has been installed according to PCSM plans. This compost infiltration berm is well vegetated and appears to be functioning as design. The pad remains the original footprint size of 400' x 400'. According to the operators PCSM plans, this the smallest "in production" workable footprint size. The following remain in place along the access road and appear to be functioning as design: rock lined roadside ditches and ditch relief culverts with rip-rap aprons. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wel |
2845172 | Primary Facility | 2019-02-26 | Routine/Complete Inspection | No Violations Noted | Inspection was in response to a deficient tank notification from ARD received on 2/25/19. A hole was discovered above the water level, and the tank was taken out of service and pumped down. I immediately noted several rust streaks on the #1 tank, and also noted that the #3 tank had similar rust streaks; I recommend that the #3 tank be monitored carefully for integrity. 3-4" of ice was present in the production tank containment; although the capacity of the containment did not appear to be significantly reduced, I recommend that when conditions warrant that this containment be vacced out. The GPU containment was full to the top of the berm with ice; I recommend that this be vacced as soon as reasonably possible. |
2855411 | Primary Facility | 2019-03-18 | Routine/Complete Inspection | No Violations Noted | Weather was 20 degrees and sunny. There were no Alta representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment. Well had 133 PSI on the production tubing and 173 PSI on the production casing. Well had 2 visible annulus vents plumbed to surface. 1' annulus vent had a 0 to 600 PSI analog pressure gauge reading approximately 0 PSI. 2' annulus vent had a 0 to 3K PSI analog pressure gauge reading approximately 1750 PSI. 0% combustible gas was detected around the well. No violations at time of inspection. |
For data sources see[7]