X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25685"

m
m
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-059-25685
+
| Well ID: 37-059-25685
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.925444, -80.393916 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.925444, -80.393917 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Greene County, Pennsylvania|Greene]]
+
| County: [[Greene_County,_Pennsylvania|Greene]]
 
|-
 
|-
| Municipality: [[Gray Township, Greene County, Pennsylvania|Gray Township]]
+
| Municipality: [[Gray Township,_Greene_County,_Pennsylvania|Gray Township]]
 
|-
 
|-
| Operator Name: [[RICE DRILLING B LLC|RICE DRILLING B LLC]]
+
| Operator Name: [[RICE DRILLING B LLC]]
 +
|-
 +
| Well Pad ID: [[149565]]
 
|-
 
|-
 
| Farm/Lease Name: WHIPKEY 2H
 
| Farm/Lease Name: WHIPKEY 2H
 
|-
 
|-
| First Permit Date: 2011-03-08
+
| License Status: INACTIVE
 
|-
 
|-
| Last Permit Date: 2011-03-08
+
| Spud Date: 2011-06-01
 
|-
 
|-
| Spud Date: 2011-05-16
+
| Permit Date: 2011-03-08
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.925444
 
| Latitude: 39.925444
 
|-
 
|-
| Longitude: -80.393916
+
| Longitude: -80.393917
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-03-08
 +
| New Permit Application
 +
|-
 +
| 2011-05-16
 +
| Performed Spud Operation
 +
|-
 +
| 2011-06-02
 +
| Drilling Completion
 +
|-
 +
| 2013-07-03
 +
| Inactive Well Request Granted
 +
|-
 +
| 2014-05-30
 +
| NEWLY DRILLED
 +
|-
 +
| 2018-05-22
 +
| MOD
 +
|-
 +
| 2018-12-19
 +
| MOD
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Job Number
!scope="col" | DATE
+
!scope="col" | Trade Name
!scope="col" | DESCRIPTION
+
!scope="col" | Supplier
!scope="col" | COMMENT
+
!scope="col" | Purpose
!scope="col" | VIOLATION ID
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2006667
+
|}-->
| 2011-09-29
+
 
| No Violations Noted
+
<!--== Stimulation Data ==
| Well not completed; still in cellar;  Containment around well good; E& S good; No signage at location.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
|}
+
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2011
| style="text-align:right;" | 0.0
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2013
| style="text-align:right;" | 0.0
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2015
| style="text-align:right;" | 0.0
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2017
| style="text-align:right;" | 0.0
+
| [[RICE DRILLING B LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 1,960,548.00
 +
| style="text-align: right;" | 189
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2015
!scope="col" | FACILITY STATE
+
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 125.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-157-25511
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 275.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW010
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 8.09 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,102.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 7,123.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 358.63 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 107.19 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 443.63 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Filter Socks
 +
| style="text-align: right;" | 0.06 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301280
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 4.58 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 2.99 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 403.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 2.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 106.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 2.78 Tons
 +
| LANDFILL
 +
| 100663
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,262.04 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 43.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.52 Tons
 +
| LANDFILL
 +
| 100277
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 2,480.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 492.38 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Servicing Fluid
 +
| style="text-align: right;" | 8.14 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-511
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 98.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,627.87 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 520.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2014-4
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 885.69 Tons
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 143.81 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 656.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 33.05 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 4.47 Tons
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 79.33 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-511
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 14.67 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1.30 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301280
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 11.94 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 751.79 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 39.69 Tons
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 727.56 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 176.21 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2006667
 +
| Primary Facility
 +
| 2011-09-29
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Well not completed; still in cellar;  Containment around well good; E& S good; No signage at location.
 +
|-
 +
| 2145138
 +
| Primary Facility
 +
| 2013-02-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| CONDUCTOR SET.
 +
|-
 +
| 2470534
 +
| Primary Facility
 +
| 2016-03-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well in regulatory inactive status.
 +
|-
 +
| 2698161
 +
| Primary Facility
 +
| 2018-02-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The Whipkey 2H well (Permit # 059-25685) is currently on inactive status.  Regulatory inactive status expires on 7/3/2018.  The Whipkey 2H well and well cellar is currently covered by a steel plate. The Department is unable to observe the condition of the well and well cellar.
 +
|-
 +
| 2817232
 +
| Primary Facility
 +
| 2018-12-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On December 12, 2018, the Department performed an inspection of the EQT/Rice Energy Whipkey well pad site.  Present at time of inspection was Jamie Davis (EQT). The site is located in Gray Twp., Greene Co. The inspection was related to a request by the operator for a pre-operational inspection of the site prior to new drilling operations on the site.
 +
 
 +
The site was original permitted by Rice Energy with an ESCGP1 permit. The site has been transferred to EQT and has been re-permitted as an ESCGP2 permit.  The operator now plans to drill new wells at the site, and has requested a pre-operational inspection for the new wells.
 +
 
 +
Rice Energy completed one well the 1H well, and set the conductor for a second well the 2H well.  The 1H well is equipped for production, and the 2H well cellar has been covered with a steel plate. EQT is waiting for the issuance of the new well permits, at time of inspection.
 +
 
 +
The well pad, and access road are in good condition.  The site is stable with greater than 70% perennial, vege
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 21:05, 14 May 2020

Well Details

Well ID: 37-059-25685
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Gray Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 149565
Farm/Lease Name: WHIPKEY 2H
License Status: INACTIVE
Spud Date: 2011-06-01
Permit Date: 2011-03-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.925444
Longitude: -80.393917

For data sources see[1][2][3]

Well History

Date Event
2011-03-08 New Permit Application
2011-05-16 Performed Spud Operation
2011-06-02 Drilling Completion
2013-07-03 Inactive Well Request Granted
2014-05-30 NEWLY DRILLED
2018-05-22 MOD
2018-12-19 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2012 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2013 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2014 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,960,548.00 189 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Produced Fluid 125.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 RICE DRILLING B LLC Produced Fluid 275.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 RICE DRILLING B LLC Fracturing Fluid Waste 8.09 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2015 RICE DRILLING B LLC Produced Fluid 50.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 RICE DRILLING B LLC Produced Fluid 2,102.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Produced Fluid 7,123.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 358.63 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016 RICE DRILLING B LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 107.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 443.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016 RICE DRILLING B LLC Filter Socks 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 4.58 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 2.99 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 403.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 2.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 106.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Synthetic Liner Materials 2.78 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Produced Fluid 6,262.04 Bbl REUSE OTHER THAN ROAD SPREADING
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 43.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 0.52 Tons LANDFILL 100277
2019 RICE DRILLING B LLC Drilling Fluid Waste 2,480.00 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 492.38 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Servicing Fluid 8.14 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 98.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 3,627.87 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Drilling Fluid Waste 520.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2014-4
2019 RICE DRILLING B LLC Drill Cuttings 885.69 Tons REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Produced Fluid 143.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 656.67 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Synthetic Liner Materials 33.05 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 4.47 Tons REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Produced Fluid 79.33 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Produced Fluid 14.67 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 RICE DRILLING B LLC Drilling Fluid Waste 1.30 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 11.94 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Drilling Fluid Waste 751.79 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Synthetic Liner Materials 39.69 Tons REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Drill Cuttings 727.56 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Produced Fluid 176.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2006667 Primary Facility 2011-09-29 Drilling/Alteration No Violations Noted Well not completed; still in cellar; Containment around well good; E& S good; No signage at location.
2145138 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted CONDUCTOR SET.
2470534 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted Well in regulatory inactive status.
2698161 Primary Facility 2018-02-26 Routine/Complete Inspection No Violations Noted The Whipkey 2H well (Permit # 059-25685) is currently on inactive status. Regulatory inactive status expires on 7/3/2018. The Whipkey 2H well and well cellar is currently covered by a steel plate. The Department is unable to observe the condition of the well and well cellar.
2817232 Primary Facility 2018-12-12 Routine/Complete Inspection No Violations Noted On December 12, 2018, the Department performed an inspection of the EQT/Rice Energy Whipkey well pad site. Present at time of inspection was Jamie Davis (EQT). The site is located in Gray Twp., Greene Co. The inspection was related to a request by the operator for a pre-operational inspection of the site prior to new drilling operations on the site.

The site was original permitted by Rice Energy with an ESCGP1 permit. The site has been transferred to EQT and has been re-permitted as an ESCGP2 permit. The operator now plans to drill new wells at the site, and has requested a pre-operational inspection for the new wells.

Rice Energy completed one well the 1H well, and set the conductor for a second well the 2H well. The 1H well is equipped for production, and the 2H well cellar has been covered with a steel plate. EQT is waiting for the issuance of the new well permits, at time of inspection.

The well pad, and access road are in good condition. The site is stable with greater than 70% perennial, vege

For data sources see[7]

References