If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-059-25792 | | Well ID: 37-059-25792 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.735150, -80.378717 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: SANDROCK 2H | | Farm/Lease Name: SANDROCK 2H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2011-08-30 | | Permit Date: 2011-08-30 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 39.735150 | | Latitude: 39.735150 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-08-30 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-10-21 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-12-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-10-01 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-02-18 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2014-02-25 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
== Fracking Activities == | == Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 62: | Line 95: | ||
| 2014-02-18 | | 2014-02-18 | ||
| 2014-02-24 | | 2014-02-24 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 8,027 |
− | | style="text-align: right;" | 8,491,270 | + | | style="text-align: right;" | 8,491,270 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 218: | Line 251: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2013-02-18 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 303: | Line 359: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 573,859.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 324 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 328: | Line 384: | ||
| 2011 | | 2011 | ||
| [[VANTAGE ENERGY APPALACHIA LLC]] | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 1,090.00 Bbl | | style="text-align: right;" | 1,090.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 349: | Line 391: | ||
| 2011 | | 2011 | ||
| [[VANTAGE ENERGY APPALACHIA LLC]] | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 170.00 Bbl | | style="text-align: right;" | 170.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 356: | Line 398: | ||
| 2011 | | 2011 | ||
| [[VANTAGE ENERGY APPALACHIA LLC]] | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 550.00 Bbl | | style="text-align: right;" | 550.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0254185 | | PA0254185 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 500.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-127-26595 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 330.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-059-24067 | ||
|- | |- | ||
| 2012 | | 2012 | ||
| [[VANTAGE ENERGY APPALACHIA LLC]] | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
− | | Fracing Fluid Waste | + | | Fracing Fluid Waste |
| style="text-align: right;" | 8,090.00 Bbl | | style="text-align: right;" | 8,090.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 370: | Line 426: | ||
| 2012 | | 2012 | ||
| [[VANTAGE ENERGY APPALACHIA LLC]] | | [[VANTAGE ENERGY APPALACHIA LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 780.84 Tons | | style="text-align: right;" | 780.84 Tons | ||
| LANDFILL | | LANDFILL | ||
Line 377: | Line 433: | ||
| 2013 | | 2013 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,207.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 2D0859721 |
|- | |- | ||
| 2013 | | 2013 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 427.00 Bbl | | style="text-align: right;" | 427.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 391: | Line 447: | ||
| 2013 | | 2013 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Fracing Fluid Waste |
+ | | style="text-align: right;" | 3,340.00 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 10,249.00 Bbl | | style="text-align: right;" | 10,249.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 398: | Line 461: | ||
| 2013 | | 2013 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 12,935.50 Bbl |
| STORAGE PENDING DISPOSAL OR REUSE | | STORAGE PENDING DISPOSAL OR REUSE | ||
| | | | ||
|- | |- | ||
− | | | + | | 2014 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 37.50 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-121-23995 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 2, | + | | style="text-align: right;" | 2,453.37 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-059-24202 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 223.75 Bbl | | style="text-align: right;" | 223.75 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 433: | Line 489: | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 2, | + | | style="text-align: right;" | 2,654.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 2D0859721 |
|- | |- | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 100.00 Bbl | | style="text-align: right;" | 100.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 447: | Line 503: | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 183.64 Bbl | | style="text-align: right;" | 183.64 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 454: | Line 510: | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 300.63 Bbl | | style="text-align: right;" | 300.63 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 461: | Line 517: | ||
| 2014 | | 2014 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,896.50 Bbl |
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 24.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-155-21447 |
+ | |- | ||
+ | | 2015 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 242.50 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
| 2015 | | 2015 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,341.16 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-059-24202 |
|- | |- | ||
| 2015 | | 2015 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 64.30 Bbl | | style="text-align: right;" | 64.30 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 482: | Line 552: | ||
| 2015 | | 2015 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 70.00 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-119-28776 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 70.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34- | + | | 34-167-23862 |
+ | |- | ||
+ | | 2015 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,702.76 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
| 2015 | | 2015 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 176.82 Bbl | | style="text-align: right;" | 176.82 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 496: | Line 580: | ||
| 2015 | | 2015 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 35.00 Bbl | | style="text-align: right;" | 35.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-23759 | | 34-155-23759 | ||
|- | |- | ||
− | | | + | | 2016 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 2, | + | | style="text-align: right;" | 2,569.00 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2016 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 669.00 Bbl |
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| WMGR123SW001 | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2016 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 8.00 Bbl |
− | | | + | | RESIDUAL WASTE TRANSFER FACILITY |
− | | | + | | 101532 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2016 | | 2016 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 49.00 Bbl | | style="text-align: right;" | 49.00 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 538: | Line 615: | ||
| 2016 | | 2016 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 23.00 Bbl | | style="text-align: right;" | 23.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 552: | Line 622: | ||
| 2016 | | 2016 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 22.00 Bbl |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE PROCESSING FACILITY |
| WMGR123SW001 | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2017 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 32.08 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW001 | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2017 |
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.73 Tons |
− | | | + | | LANDFILL |
− | | | + | | 100663 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 95.16 Bbl | | style="text-align: right;" | 95.16 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 580: | Line 650: | ||
| 2017 | | 2017 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 639.19 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
− | | | + | | |
|- | |- | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 6.78 Bbl | | style="text-align: right;" | 6.78 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 594: | Line 664: | ||
| 2017 | | 2017 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 24.05 Bbl | | style="text-align: right;" | 24.05 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 0.40 Tons | ||
+ | | RESIDUAL WASTE TRANSFER FACILITY | ||
+ | | 101532 | ||
|- | |- | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 18.33 Tons | | style="text-align: right;" | 18.33 Tons | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 607: | Line 684: | ||
|- | |- | ||
| 2017 | | 2017 | ||
− | | [[ | + | | [[VANTAGE ENERGY APPALACHIA II LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 181.30 Bbl | | style="text-align: right;" | 181.30 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2017 | | 2017 | ||
| [[VANTAGE ENERGY APPALACHIA II LLC]] | | [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 659.70 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123SW010 |
|- | |- | ||
− | | | + | | 2018 |
− | | [[ | + | | [[RICE DRILLING B LLC]] |
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 223.73 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW005 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 11.43 Bbl | | style="text-align: right;" | 11.43 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
Line 650: | Line 713: | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 622.23 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | | + | | 2019 |
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 23.17 Bbl |
− | | | + | | SURFACE IMPOUNDMENT |
− | | | + | | 95-7-37312-19 |
|- | |- | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 167.06 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
Line 671: | Line 734: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 28.60 Bbl |
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 12.73 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,988.88 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-059-25792 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.73515,"lon":-80.378717,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Gilmore Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 147655 | |
Farm/Lease Name: SANDROCK 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-08-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.735150 | |
Longitude: -80.378717 |
Date | Event |
---|---|
2011-08-30 | New Permit Application |
2011-10-21 | Performed Spud Operation |
2011-12-18 | Drilling Completion |
2012-10-01 | Perforation |
2013-02-18 | Performed Stimulation |
2014-02-25 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-18 | 2014-02-24 | 8,027 | 8,491,270 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | TS 30 | TERRASERVICES | SCALE INHIBITOR | POLYCARBOXYLATE | NA | 100 | 0.0110066 | 8804.98 |
15% HCL | FTSI | ACID | HYDROGEN CHLORIDE | 7647-01-0 | 15 | 0.0659071 | 52723.7 | |
FE 100L | FTSI | IRON CONTROL AGENT - ACID | CITRIC ACID | 77-92-9 | 55 | 0.000859078 | 687.237 | |
NE-100 | FTSI | NON-EMUSFIYING AGENT - ACID | 2-BUTOXYETHANOL | 111-76-2 | 10 | 0.00004450 | 35.596 | |
2-PROPANOL | 67-63-0 | 10 | 0.00004450 | 35.596 | ||||
DODECYLBENZENESULFONIC ACID | 27176-87-0 | 5 | 0.00002225 | 17.798 | ||||
CHLORINE DIOXIDE | TERRASERVICES | BIOCIDE | CHLORINE DIOXIDE | 10049-04-4 | 100 | 0.00000048 | 0.38 | |
SAND | FTSI | SAND - PROPPANT | CRYSTALLINE SILICA IN THE FORM OF QUARTZ | 14808-60-7 | 100 | 10.8758 | 8,700,340.0 | |
COL-150 | FTSI | COROSION INHIBITOR - ACID | AROMATIC ALDEHYDE | NA | 10 | 0.00008622 | 68.976 | |
ISOPROPANOL | 67-63-0 | 30 | 0.000258671 | 206.929 | ||||
ORGANIC AMINE RESIN SALT | NA | 30 | 0.000258671 | 206.929 | ||||
QUATERNARY AMMONIUM COMPOUND | NA | 10 | 0.00008622 | 68.976 | ||||
DIMETHYLFORMAMIDE | 68-12-2 | 10 | 0.00008622 | 68.976 | ||||
ETHYLENE GLYCOL | 107-21-1 | 30 | 0.000258671 | 206.929 | ||||
WATER | VANTAGE | CARRIER/BASE FLUID | WATER | NA | 100 | 88.5778 | 70,859,600.0 | |
FRW-200 | FTSI | FRICTION REDUCER | PETROLEUM DISTILLATE HYDROTREATED LIGHT | 64742-47-8 | 26 | 0.0242144 | 19370.8 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-02-18 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | TANGLEWOOD EXPL LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | VANTAGE ENERGY APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | VANTAGE ENERGY APPALACHIA II LLC | 1,718,510.00 | 223 | 0.00 | 0 | 0.00 | 0 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | 1,831,975.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | 1,110,685.71 | 339 | 0.00 | 0 | 0.00 | 0 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | 885,297.47 | 361 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 671,621.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 567,589.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 573,859.00 | 324 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | VANTAGE ENERGY APPALACHIA LLC | Drilling Fluid Waste | 1,090.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 170.00 Bbl | INJECTION DISPOSAL WELL | 4355 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Drilling Fluid Waste | 550.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 500.00 Bbl | INJECTION DISPOSAL WELL | 34-127-26595 |
2011 | VANTAGE ENERGY APPALACHIA LLC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | VANTAGE ENERGY APPALACHIA LLC | Fracing Fluid Waste | 8,090.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | VANTAGE ENERGY APPALACHIA LLC | Drill Cuttings | 780.84 Tons | LANDFILL | 100419 |
2013 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 1,207.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2013 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 427.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | VANTAGE ENERGY APPALACHIA II LLC | Fracing Fluid Waste | 3,340.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 10,249.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2013 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 12,935.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 37.50 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2,453.37 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 223.75 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2,654.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 183.64 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 300.63 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,896.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 24.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 242.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,341.16 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 64.30 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 70.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 70.00 Bbl | INJECTION DISPOSAL WELL | 34-167-23862 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2,702.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 176.82 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2015 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 2,569.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 669.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 8.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 49.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 23.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 32.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 0.73 Tons | LANDFILL | 100663 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 95.16 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 639.19 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 6.78 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 24.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 0.40 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 18.33 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 181.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 659.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | RICE DRILLING B LLC | Produced Fluid | 223.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 11.43 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 622.23 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 23.17 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 167.06 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 28.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 12.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,988.88 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2119859 | Primary Facility | 2012-11-28 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION. |
2349205 | Primary Facility | 2015-03-04 | Routine/Complete Inspection | No Violations Noted | On 03/04/15 at approximately 1140 hours I, Environmental Trainee Justin NAJEWICZ, and fellow Environmental Trainee Kristof EICHENLAUB performed a routine complete inspection of the Sandrock Well pad. E&S controls were present on the site and in functional condition. No violations were observed. |
2453710 | Primary Facility | 2016-01-06 | Routine/Complete Inspection | No Violations Noted | Well drilled and in production. |
2515698 | Primary Facility | 2016-08-31 | Routine/Complete Inspection | No Violations Noted | Well properly identified and equipped for production. |
For data sources see[9]