X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-26265"

m
 
m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-26265
 
| Well ID: 37-059-26265
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.895916, -80.100855 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.895917, -80.100856 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Greene_County,_Pennsylvania|Greene]]
 +
|-
 +
| Municipality: [[Jefferson Township,_Greene_County,_Pennsylvania|Jefferson Township]]
 
|-
 
|-
 
| Operator Name: [[VANTAGE ENERGY APPALACHIA LLC]]
 
| Operator Name: [[VANTAGE ENERGY APPALACHIA LLC]]
 
|-
 
|-
| First Permit Date: 2013-09-06
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2013-09-06
+
| Farm/Lease Name: RIDGE ROAD 8H
 
|-
 
|-
| Spud Date: None
+
| License Status:  
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2013-09-06
 
|-
 
|-
| Violations: None
+
| Well Type: GAS
 
|-
 
|-
| Latitude: 39.895916
+
| Unconventional Well: Y
 
|-
 
|-
| Longitude: -80.100855
+
| Configuration: Horizontal Well
 
|-
 
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 39.895917
 +
|-
 +
| Longitude: -80.100856
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Production Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
+
|-
!scope="col" | CONDENSATE QUANTITY
+
| 2013-09-06
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| New Permit Application
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 2014-06-03
 +
| New Permit Application
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Job Number
!scope="col" | TYPE
+
!scope="col" | Job Start Date
!scope="col" | QUANTITY
+
!scope="col" | Job End Date
!scope="col" | UNITS
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Total Water Volume (gal)
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Total Non-Water Volume (gal)
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
|}-->
!scope="col" | FACILITY STATE
+
<!--==== Fluid Composition Data ====
|}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
|}-->
 +
 
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2559147
 +
| Primary Facility
 +
| 2017-01-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 01/23/17 at approximately 1400 hours I met with Bryan Morris of Rice Energy to discuss proposed changes to the site. The Ridge Road pad consists of a lower section that currently has wells on it and an upper section that is approximately 3-4’ higher and accessed by a gravel ramp.
 +
 +
Rice Energy requested redline approval to shift the ramp to the southeast and to convert a portion of the upper pad to the elevation of the lower pad to accommodate an oncoming drilling rig. It was proposed that the removed material would be placed next to the existing stockpile and silt sock be added on the eastern portion for erosion control.
 +
 
 +
The redline changes were approved and it was requested that an as built drawing reflecting the changes be sent to the engineering section in Pittsburgh.
 +
|-
 +
| 2664750
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| While reviewing an ESCGP 2 major modification/renewal Environmental Engineering Specialist Mohamed Sam observed that the wet pond called out in the approved PCSM plans was not installed. This WQS conducted a routine partial inspection and confirmed the wet pond had not been installed (see photographs).
 +
 
 +
Violations of 102.5(m)(4) and 102.5(f) have occurred as a result of the Operator failing to install PCSM per the approved plan.
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 21:08, 14 May 2020

Well Details

Well ID: 37-059-26265
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jefferson Township
Operator Name: VANTAGE ENERGY APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: RIDGE ROAD 8H
License Status:
Spud Date:
Permit Date: 2013-09-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.895917
Longitude: -80.100856

For data sources see[1][2][3]

Well History

Date Event
2013-09-06 New Permit Application
2014-06-03 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2559147 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted On 01/23/17 at approximately 1400 hours I met with Bryan Morris of Rice Energy to discuss proposed changes to the site. The Ridge Road pad consists of a lower section that currently has wells on it and an upper section that is approximately 3-4’ higher and accessed by a gravel ramp.

Rice Energy requested redline approval to shift the ramp to the southeast and to convert a portion of the upper pad to the elevation of the lower pad to accommodate an oncoming drilling rig. It was proposed that the removed material would be placed next to the existing stockpile and silt sock be added on the eastern portion for erosion control.

The redline changes were approved and it was requested that an as built drawing reflecting the changes be sent to the engineering section in Pittsburgh.

2664750 Primary Facility 2017-11-02 Routine/Partial Inspection No Violations Noted While reviewing an ESCGP 2 major modification/renewal Environmental Engineering Specialist Mohamed Sam observed that the wet pond called out in the approved PCSM plans was not installed. This WQS conducted a routine partial inspection and confirmed the wet pond had not been installed (see photographs).

Violations of 102.5(m)(4) and 102.5(f) have occurred as a result of the Operator failing to install PCSM per the approved plan.

For data sources see[5]

References