If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-083-55650 | | Well ID: 37-083-55650 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.812467, -78.852717 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[McKean_County,_Pennsylvania|McKean]] | ||
+ | |- | ||
+ | | Municipality: [[Hamilton Township,_McKean_County,_Pennsylvania|Hamilton Township]] | ||
|- | |- | ||
| Operator Name: [[CATALYST ENERGY INC]] | | Operator Name: [[CATALYST ENERGY INC]] | ||
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: BRENNAN 2582 |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2012-01-26 |
|- | |- | ||
− | | | + | | Well Type: OIL |
|- | |- | ||
− | | | + | | Unconventional Well: N |
|- | |- | ||
− | | | + | | Configuration: Vertical Well |
|- | |- | ||
+ | | Conservation: No | ||
+ | |- | ||
+ | | Latitude: 41.812467 | ||
+ | |- | ||
+ | | Longitude: -78.852717 | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-01-26 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-02-14 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-02-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-05-01 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2012-09-14 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 256.15 | ||
+ | | style="text-align: right;" | 150 | ||
+ | | style="text-align: right;" | 192.85 | ||
+ | | style="text-align: right;" | 150 | ||
+ | | style="text-align: right;" | 51.92 | ||
+ | | style="text-align: right;" | 150 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 2,084.21 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 367.88 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 104.82 |
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,133.80 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 151.19 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 60.52 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,314.48 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 95.39 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 81.57 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,184.70 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 59.94 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 86.13 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | style="text-align: right;" | 1,177.91 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 61.17 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 92.60 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align:right;" | 51.92 | + | | Produced Fluid |
− | + | | style="text-align: right;" | 51.92 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0102784 | | PA0102784 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2014 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 246.36 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 246.36 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 38.88 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 21.14 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 92.66 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 92.66 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0102784 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 38.88 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 88.76 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 6.52 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 58.17 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4.35 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 20.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 58.17 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 31.99 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 91.73 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 125.78 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 17.52 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | BT-008 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 22.30 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | | Bbl | + | | style="text-align: right;" | 101.96 Bbl |
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 17.39 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | BT-008 |
− | | | + | |- |
− | | | + | | 2019 |
− | | | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2.39 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | PAS2D215BWAR | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2042325 | | 2042325 | ||
+ | | Primary Facility | ||
| 2012-02-13 | | 2012-02-13 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2043041 | | 2043041 | ||
+ | | Primary Facility | ||
| 2012-02-15 | | 2012-02-15 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2049977 | | 2049977 | ||
+ | | Primary Facility | ||
| 2012-03-09 | | 2012-03-09 | ||
+ | | Site Restoration | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2084385 | | 2084385 | ||
+ | | Primary Facility | ||
| 2012-07-19 | | 2012-07-19 | ||
+ | | Site Restoration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-083-55650 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.812467,"lon":-78.852717,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Hamilton Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BRENNAN 2582 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-26 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.812467 | |
Longitude: -78.852717 |
Date | Event |
---|---|
2012-01-26 | New Permit Application |
2012-02-14 | Performed Spud Operation |
2012-02-18 | Drilling Completion |
2012-05-01 | Perforation |
2012-09-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 256.15 | 150 | 192.85 | 150 | 51.92 | 150 |
2014 | CATALYST ENERGY INC | 2,084.21 | 365 | 367.88 | 365 | 104.82 | 365 |
2015 | CATALYST ENERGY INC | 1,133.80 | 365 | 151.19 | 365 | 60.52 | 365 |
2016 | CATALYST ENERGY INC | 1,314.48 | 365 | 95.39 | 365 | 81.57 | 365 |
2017 | CATALYST ENERGY INC | 1,184.70 | 365 | 59.94 | 365 | 86.13 | 365 |
2018 | CATALYST ENERGY INC | 1,177.91 | 365 | 61.17 | 365 | 92.60 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | Produced Fluid | 51.92 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 21.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 88.76 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 4.35 Bbl | ROAD SPREADING | |
2016 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 31.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.73 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 125.78 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 17.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2018 | CATALYST ENERGY INC | Produced Fluid | 22.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 101.96 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 17.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 2.39 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2042325 | Primary Facility | 2012-02-13 | Routine/Complete Inspection | No Violations Noted | |
2043041 | Primary Facility | 2012-02-15 | Drilling/Alteration | No Violations Noted | |
2049977 | Primary Facility | 2012-03-09 | Site Restoration | No Violations Noted | |
2084385 | Primary Facility | 2012-07-19 | Site Restoration | No Violations Noted |
For data sources see[7]