X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-55757"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-55757
 
| Well ID: 37-083-55757
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.816486, -78.834047 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.816486, -78.834047 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[McKean_County,_Pennsylvania|McKean]]
 +
|-
 +
| Municipality: [[Hamilton Township,_McKean_County,_Pennsylvania|Hamilton Township]]
 
|-
 
|-
 
| Operator Name: [[CATALYST ENERGY INC]]
 
| Operator Name: [[CATALYST ENERGY INC]]
 
|-
 
|-
| First Permit Date: 2012-06-13
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2012-06-13
+
| Farm/Lease Name: BACKWARDS L 2827
 
|-
 
|-
| Spud Date: 2012-09-10
+
| License Status:  
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2012-06-13
 
|-
 
|-
| Violations: None
+
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.816486
 
| Latitude: 41.816486
 
|-
 
|-
 
| Longitude: -78.834047
 
| Longitude: -78.834047
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-06-13
 +
| New Permit Application
 +
|-
 +
| 2012-09-10
 +
| Performed Spud Operation
 +
|-
 +
| 2012-09-12
 +
| Drilling Completion
 +
|-
 +
| 2013-01-18
 +
| Perforation
 +
|-
 +
| 2013-05-29
 +
| NEWLY DRILLED
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,710.12
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 301.85
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 86.01
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,133.80
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 151.19
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 60.52
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,314.48
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 95.39
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 81.57
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 1,184.70
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 59.94
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 86.13
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2012-0
+
| 2018
| style="text-align:right;" | 0.0
+
| [[CATALYST ENERGY INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 1,177.91
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 61.17
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 92.60
 +
| style="text-align: right;" | 365
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2015
!scope="col" | FACILITY STATE
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 92.66 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.88 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 21.14 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 92.66 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 38.88 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.17 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.52 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.17 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 88.76 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4.35 Bbl
 +
| ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.99 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 91.73 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 144.78 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.52 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 41.30 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2.39 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 17.39 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 101.96 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2095611
 
| 2095611
 +
| Primary Facility
 
| 2012-08-29
 
| 2012-08-29
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2099270
 
| 2099270
 +
| Primary Facility
 
| 2012-09-10
 
| 2012-09-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2099284
 
| 2099284
 +
| Primary Facility
 
| 2012-09-12
 
| 2012-09-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2107720
 
| 2107720
 +
| Primary Facility
 
| 2012-10-16
 
| 2012-10-16
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2132799
 
| 2132799
 +
| Primary Facility
 
| 2013-01-18
 
| 2013-01-18
| McKean
+
| Drilling/Alteration
| Hamilton Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
|
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 22:14, 14 May 2020

Well Details

Well ID: 37-083-55757
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Hamilton Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: BACKWARDS L 2827
License Status:
Spud Date:
Permit Date: 2012-06-13
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.816486
Longitude: -78.834047

For data sources see[1][2][3]

Well History

Date Event
2012-06-13 New Permit Application
2012-09-10 Performed Spud Operation
2012-09-12 Drilling Completion
2013-01-18 Perforation
2013-05-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2014 CATALYST ENERGY INC 1,710.12 365 301.85 365 86.01 365
2015 CATALYST ENERGY INC 1,133.80 365 151.19 365 60.52 365
2016 CATALYST ENERGY INC 1,314.48 365 95.39 365 81.57 365
2017 CATALYST ENERGY INC 1,184.70 365 59.94 365 86.13 365
2018 CATALYST ENERGY INC 1,177.91 365 61.17 365 92.60 365

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CATALYST ENERGY INC Produced Fluid 92.66 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 38.88 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 21.14 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2015 CATALYST ENERGY INC Produced Fluid 92.66 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 38.88 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 58.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 CATALYST ENERGY INC Produced Fluid 6.52 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 58.17 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 88.76 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 4.35 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 31.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 91.73 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 144.78 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 36.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2018 CATALYST ENERGY INC Produced Fluid 41.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 2.39 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 17.39 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 101.96 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2095611 Primary Facility 2012-08-29 Routine/Complete Inspection No Violations Noted
2099270 Primary Facility 2012-09-10 Drilling/Alteration No Violations Noted
2099284 Primary Facility 2012-09-12 Drilling/Alteration No Violations Noted
2107720 Primary Facility 2012-10-16 Site Restoration No Violations Noted
2132799 Primary Facility 2013-01-18 Drilling/Alteration No Violations Noted

For data sources see[7]

References