X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-56300"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-56300
 
| Well ID: 37-083-56300
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.773488, -78.697052 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.773489, -78.697053 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[McKean_County,_Pennsylvania|McKean]]
 +
|-
 +
| Municipality: [[Lafayette Township,_McKean_County,_Pennsylvania|Lafayette Township]]
 
|-
 
|-
 
| Operator Name: [[CATALYST ENERGY INC]]
 
| Operator Name: [[CATALYST ENERGY INC]]
 
|-
 
|-
| First Permit Date: 2013-09-23
+
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: YOUNG PINE RUN 4074
 +
|-
 +
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2013-09-23
 +
|-
 +
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
| Last Permit Date: 2013-09-23
+
| Latitude: 41.773489
 
|-
 
|-
| Spud Date: 2013-11-12
+
| Longitude: -78.697053
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Unconventional: No
+
| 2013-09-23
 +
| New Permit Application
 
|-
 
|-
| Horizontal: No
+
| 2013-11-12
 +
| Performed Spud Operation
 
|-
 
|-
| Violations: None
+
| 2013-11-14
 +
| Drilling Completion
 
|-
 
|-
| Latitude: 41.773488
+
| 2014-05-14
 +
| Perforation
 
|-
 
|-
| Longitude: -78.697052
+
| 2014-08-27
 +
| NEWLY DRILLED
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 498.00
 +
| style="text-align: right;" | 165
 +
| style="text-align: right;" | 133.90
 +
| style="text-align: right;" | 165
 +
| style="text-align: right;" | 26.67
 +
| style="text-align: right;" | 165
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 570.85
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 228.15
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 25.74
 +
| style="text-align: right;" | 274
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 160.5
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 115.29
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 5.45
 +
| style="text-align: right;" | 274
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 390.75
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 190.06
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 13.75
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 942.67
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 272.87
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 30.77
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2014
!scope="col" | FACILITY STATE
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 694.58 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 694.58 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 43.33 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 232.84 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 145.24 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 232.84 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0102784
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 43.33 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 204.17 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 18.33 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.33 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 25.00 Bbl
 +
| ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 94.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.33 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.33 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 212.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 171.67 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 74.44 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 108.33 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 313.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 281.67 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 51.67 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 45.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2222275
 
| 2222275
 +
| Primary Facility
 
| 2013-11-15
 
| 2013-11-15
| McKean
+
| Routine/Complete Inspection
| Lafayette Twp
 
 
| No Violations Noted
 
| No Violations Noted
|-
+
|  
 
|-
 
|-
 
| 2228931
 
| 2228931
 +
| Primary Facility
 
| 2013-12-10
 
| 2013-12-10
| McKean
+
| Administrative/File Review
| Lafayette Twp
+
| No Violations Noted
 +
|
 +
|-
 +
| 2286416
 +
| Primary Facility
 +
| 2014-07-07
 +
| Site Restoration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2286418
 +
| Primary Facility
 +
| 2014-07-07
 +
| Site Restoration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2289793
 +
| Primary Facility
 +
| 2014-07-28
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
 +
|
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 23:12, 14 May 2020

Well Details

Well ID: 37-083-56300
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Lafayette Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: YOUNG PINE RUN 4074
License Status:
Spud Date:
Permit Date: 2013-09-23
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.773489
Longitude: -78.697053

For data sources see[1][2][3]

Well History

Date Event
2013-09-23 New Permit Application
2013-11-12 Performed Spud Operation
2013-11-14 Drilling Completion
2014-05-14 Perforation
2014-08-27 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 498.00 165 133.90 165 26.67 165
2015 CATALYST ENERGY INC 570.85 274 228.15 274 25.74 274
2016 CATALYST ENERGY INC 160.5 274 115.29 274 5.45 274
2017 CATALYST ENERGY INC 390.75 365 190.06 365 13.75 365
2018 CATALYST ENERGY INC 942.67 365 272.87 365 30.77 365

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 694.58 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 694.58 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 43.33 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 232.84 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 145.24 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2015 CATALYST ENERGY INC Produced Fluid 232.84 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 43.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 204.17 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 18.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 8.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 25.00 Bbl ROAD SPREADING
2016 CATALYST ENERGY INC Produced Fluid 94.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 CATALYST ENERGY INC Produced Fluid 8.33 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 CATALYST ENERGY INC Produced Fluid 8.33 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 212.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 171.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 74.44 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 108.33 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 36.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2018 CATALYST ENERGY INC Produced Fluid 313.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 281.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 51.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 45.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2222275 Primary Facility 2013-11-15 Routine/Complete Inspection No Violations Noted
2228931 Primary Facility 2013-12-10 Administrative/File Review No Violations Noted
2286416 Primary Facility 2014-07-07 Site Restoration No Violations Noted
2286418 Primary Facility 2014-07-07 Site Restoration No Violations Noted
2289793 Primary Facility 2014-07-28 Administrative/File Review No Violations Noted

For data sources see[7]

References