X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-27343"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-27343
 
| Well ID: 37-059-27343
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.792283, -80.502889 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.792283, -80.502889 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PISTON HONDA 8
 
| Farm/Lease Name: PISTON HONDA 8
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 09/19/2017
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 8/28/2017
+
| Permit Date: 2017-08-28
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.792283
 
| Latitude: 39.792283
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2017-08-28
 +
| New Permit Application
 +
|-
 +
| 2017-09-19
 +
| Performed Spud Operation
 +
|-
 +
| 2018-03-30
 +
| MOD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 71: Line 131:
 
| 2019
 
| 2019
 
| [[RICE DRILLING B LLC]]
 
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1,187,169.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 93
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 88: Line 148:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 93: Line 154:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2017-11
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 22.51 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 119.10 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
 
|-
 
|-
| 2017-11
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 46.26 Tons
+
| Produced Fluid
| LANDFILL
+
| style="text-align: right;" | 18.33 Bbl
| 100663
 
|-
 
| 2017-11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 56.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 20.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-11
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 17.43 Bbl
 
| style="text-align: right;" | 17.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2017-12
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 59.72 Tons
+
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.93 Tons
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100663
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 75.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2017-12
+
| 2017
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 54.14 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 111.27 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2017-12
+
| 2017
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 
| style="text-align: right;" | 182.80 Bbl
 
| style="text-align: right;" | 182.80 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-12
+
| 2017
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 20.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 76.67 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-12
+
| 2017
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 55.00 Bbl
+
| Other Oil & Gas Wastes
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-12
 
| Other Oil & Gas Wastes (in Tons) RWC 899
 
 
| style="text-align: right;" | 1.01 Tons
 
| style="text-align: right;" | 1.01 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100277
 
| 100277
 
|-
 
|-
| 2017-12
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 18.33 Bbl
 
| style="text-align: right;" | 18.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2017-12
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 18.33 Bbl
+
| Drill Cuttings
 +
| style="text-align: right;" | 540.95 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 260.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-12
+
| 2018
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 0.93 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 3.52 Tons
 
| LANDFILL
 
| LANDFILL
| 100663
+
| 100419
 
|-
 
|-
| 2018-01
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 284.67 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 20.72 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
 
|-
 
|-
| 2018-01
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 299.78 Tons
 
| style="text-align: right;" | 299.78 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2018-01
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 260.00 Bbl
+
| Drilling Fluid Waste
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 1,040.00 Bbl
| WMGR123SW005
 
|-
 
| 2018-01
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 390.00 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-01
+
| 2018
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 5.72 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 596.65 Tons
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100419
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 53.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2018-01
+
| 2018
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[RICE DRILLING B LLC]]
 +
| Synthetic Liner Materials
 
| style="text-align: right;" | 25.75 Tons
 
| style="text-align: right;" | 25.75 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2018-12
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 256.28 Tons
+
| Synthetic Liner Materials
 +
| style="text-align: right;" | 5.72 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
 
|-
 
|-
| 2018-12
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 596.65 Tons
+
| Produced Fluid
| LANDFILL
+
| style="text-align: right;" | 485.10 Bbl
| 100419
+
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 113.96 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2018-12
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 260.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 110.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-12
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 53.33 Bbl
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 2.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| ODNR 2014-4
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,666.96 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2018-12
+
| 2019
| Other Oil & Gas Wastes (in Tons) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 20.72 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 84.85 Tons
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100419
 
|-
 
|-
| 2018-12
+
| 2019
| Other Oil & Gas Wastes (in Tons) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 3.52 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 4.75 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100419
 
| 100419
 
|-
 
|-
| 2019-01
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 84.85 Tons
+
| Produced Fluid
 +
| style="text-align: right;" | 73.29 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-511
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 3.77 Tons
 
| LANDFILL
 
| LANDFILL
| 100419
+
| 100172
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 31.68 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 24.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 47.87 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 
|-
 
|-
| 2019-01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 110.00 Bbl
+
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 0.13 Tons
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-01
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 70.00 Bbl
+
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 0.13 Tons
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-02
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 60.00 Bbl
+
| Produced Fluid
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 853.90 Bbl
|  
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 2019-02
+
| 2019
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| [[RICE DRILLING B LLC]]
| style="text-align: right;" | 0.13 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 594.67 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 365: Line 492:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 23:15, 14 May 2020

Well Details

Well ID: 37-059-27343
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Aleppo Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152573
Farm/Lease Name: PISTON HONDA 8
License Status:
Spud Date:
Permit Date: 2017-08-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.792283
Longitude: -80.502889

For data sources see[1][2][3]

Well History

Date Event
2017-08-28 New Permit Application
2017-09-19 Performed Spud Operation
2018-03-30 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,187,169.00 93 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RICE DRILLING B LLC Drill Cuttings 119.10 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 17.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Synthetic Liner Materials 0.93 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 111.27 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Drilling Fluid Waste 182.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drilling Fluid Waste 76.67 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 1.01 Tons LANDFILL 100277
2017 RICE DRILLING B LLC Produced Fluid 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RICE DRILLING B LLC Drill Cuttings 540.95 Tons LANDFILL 100172
2018 RICE DRILLING B LLC Drilling Fluid Waste 260.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 3.52 Tons LANDFILL 100419
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 20.72 Tons LANDFILL 100172
2018 RICE DRILLING B LLC Drill Cuttings 299.78 Tons LANDFILL 100663
2018 RICE DRILLING B LLC Drilling Fluid Waste 1,040.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Drill Cuttings 596.65 Tons LANDFILL 100419
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 53.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Synthetic Liner Materials 25.75 Tons LANDFILL 100663
2018 RICE DRILLING B LLC Synthetic Liner Materials 5.72 Tons LANDFILL 100172
2019 RICE DRILLING B LLC Produced Fluid 485.10 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 113.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Drilling Fluid Waste 110.00 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 2.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2014-4
2019 RICE DRILLING B LLC Produced Fluid 1,666.96 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Drill Cuttings 84.85 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 4.75 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Produced Fluid 73.29 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 3.77 Tons LANDFILL 100172
2019 RICE DRILLING B LLC Waste Water Treatment Sludge 31.68 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 47.87 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.13 Tons REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Soil Contaminated by Oil 0.13 Tons REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 853.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 594.67 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2639910 Primary Facility 2017-09-20 Drilling/Alteration No Violations Noted The well has been spud. The well was spud on 9/19/17. The operator drilled a 36 inch hole to 50 feet and set and cemented a 50 foot x 26 inch conductor pipe in place. A cylindrical well cellar has been installed around conductor pipe.
2640706 Primary Facility 2017-09-20 Routine/Complete Inspection No Violations Noted On September 20, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. Present at time of inspection was Joel Keller (DEP) and Jamie Davis (Rice). The site is located in Aleppo Twp., Greene Co. The inspection was related to setting of conductor on the wells to be drilled on site.

The operator is constructing the PCSM structures on the site and stabilizing the site. The operator has begun to set conductors on the 6 permitted wells on the site.

2664937 Primary Facility 2017-11-08 Routine/Complete Inspection No Violations Noted On November 8, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection during drilling operations on site.

The operator has completed construction of the PCSM structures on the site and is stabilizing the site. A slide has developed in the PCSM structure at the well pad which extends to the base of the well pad fill slope. The operator will need to stabilize the slope and repair the PCSM structure. The operator has set conductors on 6 wells on the site and has begun drilling the vertical sections on these 6 wells.

2682727 Primary Facility 2018-01-05 Drilling/Alteration No Violations Noted Operator reports 2832' of 9 5/8" csg set with 29 bbls of cmt returned to surface. NOVIO
2830079 Primary Facility 2019-01-18 Drilling/Alteration No Violations Noted The well has been drilled and cased to total depth. The operator set and cemented 5 1/2" production casing at 19,258' TMD / 7,406' TVD. Est TOC 5,000'. The operator is currently on site drilling well 059-27342.

For data sources see[7]

References