X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-56354"

m
 
m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-56354
 
| Well ID: 37-083-56354
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.811016, -78.771572 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.811017, -78.771572 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[McKean_County,_Pennsylvania|McKean]]
 +
|-
 +
| Municipality: [[Lafayette Township,_McKean_County,_Pennsylvania|Lafayette Township]]
 
|-
 
|-
 
| Operator Name: [[CATALYST ENERGY INC]]
 
| Operator Name: [[CATALYST ENERGY INC]]
 
|-
 
|-
| First Permit Date: 2013-11-07
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2013-11-07
+
| Farm/Lease Name: WT 3410
 
|-
 
|-
| Spud Date: None
+
| License Status: Active
 
|-
 
|-
| Unconventional: No
+
| Spud Date: 2014-07-21
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2013-11-07
 
|-
 
|-
| Violations: None
+
| Well Type: OIL
 
|-
 
|-
| Latitude: 41.811016
+
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 41.811017
 
|-
 
|-
 
| Longitude: -78.771572
 
| Longitude: -78.771572
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-11-07
 +
| New Permit Application
 +
|-
 +
| 2014-07-21
 +
| Performed Spud Operation
 +
|-
 +
| 2014-07-24
 +
| Drilling Completion
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2015-08-24
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2015-08-25
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2015-08-26
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2015-10-13
 +
| Partially Plugged
 +
|-
 +
| 2017-02-15
 +
| Begin Plugging
 +
|-
 +
| 2017-02-15
 +
| Finished Plugging
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 1,800
 +
| style="text-align: right;" | 2,100
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 1,600
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,300
 +
| style="text-align: right;" | 1,800
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,700
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 1,500
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 6
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 7
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 1,800
 +
| style="text-align: right;" | 3,300
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 8
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 1,950
 +
| style="text-align: right;" | 1,900
 +
|-
 +
| 2015-08-24
 +
| style="text-align: right;" | 9
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 10
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,300
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 11
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 3,100
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 12
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,700
 +
| style="text-align: right;" | 3,100
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 13
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,700
 +
| style="text-align: right;" | 3,900
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 14
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 3,200
 +
| style="text-align: right;" | 3,900
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 15
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 3,000
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2015-08-25
 +
| style="text-align: right;" | 16
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,700
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 17
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 4,000
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 18
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 4,000
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 19
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,300
 +
| style="text-align: right;" | 1,700
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 20
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2,400
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 21
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,900
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2015-08-26
 +
| style="text-align: right;" | 22
 +
| SAND
 +
| style="text-align: right;" | 18,480
 +
| style="text-align: right;" | 2,800
 +
| style="text-align: right;" | 3,600
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 253.6
 +
| style="text-align: right;" | 182
 +
| style="text-align: right;" | 15.84
 +
| style="text-align: right;" | 182
 +
| style="text-align: right;" | 7.96
 +
| style="text-align: right;" | 182
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 188.3
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 27.22
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 7.38
 +
| style="text-align: right;" | 274
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 287.30
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 45.87
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 13.62
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| style="text-align: right;" | 307.50
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 30.78
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 16.05
 +
| style="text-align: right;" | 365
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2015
!scope="col" | FACILITY STATE
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 19.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 176.5 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 176.50 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 136.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 360.38 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 185.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 11.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10.00 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 140.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 212.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2296176
 +
| Primary Facility
 +
| 2014-08-19
 +
| Administrative/File Review
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2367706
 +
| Primary Facility
 +
| 2015-04-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2411111
 +
| Primary Facility
 +
| 2015-09-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2482286
 +
| Primary Facility
 +
| 2016-05-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2573760
 +
| Primary Facility
 +
| 2017-03-22
 +
| Administrative/File Review
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2593968
 +
| Primary Facility
 +
| 2017-05-16
 +
| Site Restoration
 +
| No Violations Noted
 +
| This is a combination well with an electric powered pump jack attached. No spills or leaks or noted on this site. Vegetation is good around the site. This site is stable. The well is tagged.
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 23:18, 14 May 2020

Well Details

Well ID: 37-083-56354
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Lafayette Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: WT 3410
License Status: Active
Spud Date: 2014-07-21
Permit Date: 2013-11-07
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.811017
Longitude: -78.771572

For data sources see[1][2][3]

Well History

Date Event
2013-11-07 New Permit Application
2014-07-21 Performed Spud Operation
2014-07-24 Drilling Completion
2015-08-24 Performed Stage 1 of Stimulation
2015-08-24 Performed Stage 2 of Stimulation
2015-08-24 Performed Stage 3 of Stimulation
2015-08-24 Performed Stage 4 of Stimulation
2015-08-24 Performed Stage 5 of Stimulation
2015-08-24 Performed Stage 6 of Stimulation
2015-08-24 Performed Stage 7 of Stimulation
2015-08-24 Performed Stage 8 of Stimulation
2015-08-24 Performed Stage 9 of Stimulation
2015-08-25 Performed Stage 10 of Stimulation
2015-08-25 Performed Stage 11 of Stimulation
2015-08-25 Performed Stage 12 of Stimulation
2015-08-25 Performed Stage 13 of Stimulation
2015-08-25 Performed Stage 14 of Stimulation
2015-08-25 Performed Stage 15 of Stimulation
2015-08-25 Performed Stage 16 of Stimulation
2015-08-26 Performed Stage 17 of Stimulation
2015-08-26 Performed Stage 18 of Stimulation
2015-08-26 Performed Stage 19 of Stimulation
2015-08-26 Performed Stage 20 of Stimulation
2015-08-26 Performed Stage 21 of Stimulation
2015-08-26 Performed Stage 22 of Stimulation
2015-10-13 Partially Plugged
2017-02-15 Begin Plugging
2017-02-15 Finished Plugging

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-24 1 SAND 18,480 1,800 2,100
2015-08-24 2 SAND 18,480 2,200 1,600
2015-08-24 3 SAND 18,480 2,300 1,800
2015-08-24 4 SAND 18,480 2,700 0
2015-08-24 5 SAND 18,480 2,200 1,500
2015-08-24 6 SAND 18,480 2,000 0
2015-08-24 7 SAND 18,480 1,800 3,300
2015-08-24 8 SAND 18,480 1,950 1,900
2015-08-24 9 SAND 18,480 2,200 4,000
2015-08-25 10 SAND 18,480 2,300 4,000
2015-08-25 11 SAND 18,480 3,100 4,000
2015-08-25 12 SAND 18,480 2,700 3,100
2015-08-25 13 SAND 18,480 2,700 3,900
2015-08-25 14 SAND 18,480 3,200 3,900
2015-08-25 15 SAND 18,480 3,000 4,000
2015-08-25 16 SAND 18,480 2,700 0
2015-08-26 17 SAND 18,480 4,000 0
2015-08-26 18 SAND 18,480 4,000 0
2015-08-26 19 SAND 18,480 2,300 1,700
2015-08-26 20 SAND 18,480 0 2,400
2015-08-26 21 SAND 18,480 2,900 4,000
2015-08-26 22 SAND 18,480 2,800 3,600

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2015 CATALYST ENERGY INC 253.6 182 15.84 182 7.96 182
2016 CATALYST ENERGY INC 188.3 274 27.22 274 7.38 274
2017 CATALYST ENERGY INC 287.30 365 45.87 365 13.62 365
2018 CATALYST ENERGY INC 307.50 365 30.78 365 16.05 365

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CATALYST ENERGY INC Produced Fluid 19.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2015 CATALYST ENERGY INC Produced Fluid 176.5 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 176.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 55.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 31.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 CATALYST ENERGY INC Produced Fluid 10.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 55 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 136.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 20.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 360.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 185.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 11.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 CATALYST ENERGY INC Produced Fluid 10.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2018 CATALYST ENERGY INC Produced Fluid 140.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 30.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 212.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296176 Primary Facility 2014-08-19 Administrative/File Review No Violations Noted
2367706 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted
2411111 Primary Facility 2015-09-30 Routine/Complete Inspection No Violations Noted
2482286 Primary Facility 2016-05-05 Routine/Complete Inspection No Violations Noted
2573760 Primary Facility 2017-03-22 Administrative/File Review No Violations Noted
2593968 Primary Facility 2017-05-16 Site Restoration No Violations Noted This is a combination well with an electric powered pump jack attached. No spills or leaks or noted on this site. Vegetation is good around the site. This site is stable. The well is tagged.

For data sources see[8]

References