X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-23072"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-23072
 
| Well ID: 37-039-23072
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.769034, -80.467933 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.769034, -80.467933 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JL FULLER 1
 
| Farm/Lease Name: JL FULLER 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 11/07/1988
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 11/1/1988
+
| Permit Date: 1988-11-01
 +
|-
 +
| Well Type: COMB. OIL&GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.769034
 
| Latitude: 41.769034
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1988-11-01
 +
| New Permit Application
 +
|-
 +
| 1988-11-07
 +
| Performed Spud Operation
 +
|-
 +
| 1988-11-16
 +
| Drilling Completion
 +
|-
 +
| 1989-12-29
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 127:
 
| style="text-align: right;" | 12,835.00
 
| style="text-align: right;" | 12,835.00
 
| style="text-align: right;" | 320
 
| style="text-align: right;" | 320
 +
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 320
 
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 13,798.00
+
| style="text-align: right;" | 13798.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 12,317.00
+
| style="text-align: right;" | 12317.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 10,786.00
+
| style="text-align: right;" | 10786.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 93.00
 
| style="text-align: right;" | 93.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 11,276.00
+
| style="text-align: right;" | 11276.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[JAMES DRILLING CORP]]
 +
| style="text-align: right;" | 10044.00
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 6,519.00
+
| style="text-align: right;" | 6519
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 7,209.00
+
| style="text-align: right;" | 7209
 
| style="text-align: right;" | 318
 
| style="text-align: right;" | 318
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 6,225.00
+
| style="text-align: right;" | 6225
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 5,608.00
+
| style="text-align: right;" | 5608
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 288
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 3,122.00
+
| style="text-align: right;" | 3122
 
| style="text-align: right;" | 157
 
| style="text-align: right;" | 157
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 5,161.00
+
| style="text-align: right;" | 5161
 
| style="text-align: right;" | 306
 
| style="text-align: right;" | 306
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 2,597.00
+
| style="text-align: right;" | 2597
 
| style="text-align: right;" | 159
 
| style="text-align: right;" | 159
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
 
| style="text-align: right;" |
 
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 2,868.00
+
| style="text-align: right;" | 2868
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 54.19
 
| style="text-align: right;" | 54.19
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 182: Line 254:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| style="text-align: right;" | 4,349.04
+
| style="text-align: right;" | 4349.04
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| style="text-align: right;" | 3,780.00
+
| style="text-align: right;" | 3780.00
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| style="text-align: right;" | 4021.44
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| style="text-align: right;" | 4,503.00
+
| style="text-align: right;" | 4503.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| style="text-align: right;" | 4,640.00
+
| style="text-align: right;" | 4640.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 229: Line 310:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 236: Line 317:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 245: Line 326:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 254: Line 335:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 265: Line 346:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 272: Line 353:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 281: Line 362:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 290: Line 371:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 299: Line 380:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| style="text-align: right;" | 4,575.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 313: Line 403:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 318: Line 409:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1991-A00
+
| 1991
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 206.00 Bbl
 
| style="text-align: right;" | 206.00 Bbl
Line 324: Line 416:
 
|  
 
|  
 
|-
 
|-
| 1993-A00
+
| 1993
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 57.00 Bbl
 
| style="text-align: right;" | 57.00 Bbl
Line 330: Line 423:
 
|  
 
|  
 
|-
 
|-
| 1994-A00
+
| 1994
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 139.00 Bbl
 
| style="text-align: right;" | 139.00 Bbl
Line 336: Line 430:
 
|  
 
|  
 
|-
 
|-
| 1996-A00
+
| 1996
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 342: Line 437:
 
|  
 
|  
 
|-
 
|-
| 1997-A00
+
| 1997
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 73.00 Bbl
 
| style="text-align: right;" | 73.00 Bbl
Line 348: Line 444:
 
| VERNON TWP
 
| VERNON TWP
 
|-
 
|-
| 1998-A00
+
| 1998
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 354: Line 451:
 
|  
 
|  
 
|-
 
|-
| 1999-A00
+
| 1999
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
Line 360: Line 458:
 
| MERCER CO.
 
| MERCER CO.
 
|-
 
|-
| 1999-A00
+
| 1999
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 366: Line 465:
 
| VERNON TWP.
 
| VERNON TWP.
 
|-
 
|-
| 2000-A00
+
| 2000
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
| style="text-align: right;" | 118.00 Bbl
+
| style="text-align: right;" | 40.00 Bbl
 
| Other
 
| Other
| VERNON TWP
+
| WOODCOCK TWP
 
|-
 
|-
| 2000-A00
+
| 2000
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 118.00 Bbl
 
| Other
 
| Other
| WOODCOCK TWP
+
| VERNON TWP
 
|-
 
|-
| 2001-A00
+
| 2001
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 38.00 Bbl
 
| style="text-align: right;" | 38.00 Bbl
Line 384: Line 486:
 
| VERNON TWP
 
| VERNON TWP
 
|-
 
|-
| 2001-A00
+
| 2001
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 94.00 Bbl
 
| style="text-align: right;" | 94.00 Bbl
Line 390: Line 493:
 
| WOODCOCK TWP
 
| WOODCOCK TWP
 
|-
 
|-
| 2002-A00
+
| 2002
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 396: Line 500:
 
|  
 
|  
 
|-
 
|-
| 2003-A00
+
| 2003
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 15.00 Bbl
 
| style="text-align: right;" | 15.00 Bbl
Line 402: Line 507:
 
|  
 
|  
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 33.00 Bbl
 
| style="text-align: right;" | 33.00 Bbl
Line 408: Line 514:
 
|  
 
|  
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 84.00 Bbl
 
| style="text-align: right;" | 84.00 Bbl
| ROAD SPREADING
+
| Road Spreading
 +
|
 +
|-
 +
| 2011
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| Road Spreading
 
|  
 
|  
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 43.00 Bbl
 
| style="text-align: right;" | 43.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24523
 
| 34-007-24523
 
|-
 
|-
| 2011-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[KASTLE RESOURCES ENTERPRISES INC]]
| style="text-align: right;" | 50.00 Bbl
+
| Produced Fluid
| ROAD SPREADING
 
|
 
|-
 
| 2014-A00
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 24.00 Bbl
 
| style="text-align: right;" | 24.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24523
 
| 34-007-24523
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 46.00 Bbl
 
| style="text-align: right;" | 46.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 457: Line 568:
 
| 2028582
 
| 2028582
 
| Primary Facility
 
| Primary Facility
| 12/13/2011
+
| 2011-12-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 464: Line 575:
 
| 2102977
 
| 2102977
 
| Primary Facility
 
| Primary Facility
| 09/21/2012
+
| 2012-09-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 527: Line 638:
 
| 378436
 
| 378436
 
| Primary Facility
 
| Primary Facility
| 06/26/1995
+
| 1995-06-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 534: Line 645:
 
| 898795
 
| 898795
 
| Primary Facility
 
| Primary Facility
| 12/01/1999
+
| 1999-12-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 569: Line 680:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 23:58, 14 May 2020

Well Details

Well ID: 37-039-23072
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Beaver Township
Operator Name: L & B ENERGY LLP
Well Pad ID:
Farm/Lease Name: JL FULLER 1
License Status: ACTIVE
Spud Date:
Permit Date: 1988-11-01
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.769034
Longitude: -80.467933

For data sources see[1][2][3]

Well History

Date Event
1988-11-01 New Permit Application
1988-11-07 Performed Spud Operation
1988-11-16 Drilling Completion
1989-12-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1989 JAMES DRILLING CORP 12,835.00 320 0.00 0 0.00 0
1991 JAMES DRILLING CORP 13798.00 365 0.00 0 0.00 0
1992 JAMES DRILLING CORP 12317.00 366 0.00 0 0.00 0
1993 JAMES DRILLING CORP 10786.00 334 93.00 334 0.00 0
1994 JAMES DRILLING CORP 11276.00 365 0.00 0 0.00 0
1995 JAMES DRILLING CORP 10044.00 359 0.00 0 0.00 0
1996 JAMES DRILLING CORP 6519 365 0.00 0 0.00 0
1997 JAMES DRILLING CORP 7209 318 0.00 0 0.00 0
1998 JAMES DRILLING CORP 6225 288 0.00 0 0.00 0
1999 JAMES DRILLING CORP 5608 288 0.00 0 0.00 0
2000 JAMES DRILLING CORP 3122 157 0.00 0 0.00 0
2001 JAMES DRILLING CORP 5161 306 0.00 0 0.00 0
2002 JAMES DRILLING CORP 2597 159 0 0 0.00 0
2003 JAMES DRILLING CORP 2868 269 54.19 269 0.00 0
2004 KASTLE RESOURCES ENTERPRISES INC 2,556.00 360 0.00 0 0.00 0
2005 KASTLE RESOURCES ENTERPRISES INC 4349.04 365 0.00 0 0.00 0
2006 KASTLE RESOURCES ENTERPRISES INC 3780.00 300 0.00 0 0.00 0
2007 KASTLE RESOURCES ENTERPRISES INC 4021.44 365 0.00 0 0.00 0
2008 KASTLE RESOURCES ENTERPRISES INC 4503.00 365 0.00 0 0.00 0
2009 KASTLE RESOURCES ENTERPRISES INC 4640.00 365 0.00 0 0.00 0
2010 KASTLE RESOURCES ENTERPRISES INC 5,980.00 365 38.00 365 0.00 0
2011 KASTLE RESOURCES ENTERPRISES INC 3,830.00 365 0.00 0 0.00 0
2012 KASTLE RESOURCES ENTERPRISES INC 3,267.00 365 0.00 0 0.00 0
2013 KASTLE RESOURCES ENTERPRISES INC 2,794.00 365 0.00 0 0.00 0
2014 KASTLE RESOURCES ENTERPRISES INC 3,818.00 365 29.00 365 0.00 0
2015 KASTLE RESOURCES ENTERPRISES INC 2,778.00 365 0.00 0 0.00 0
2016 KASTLE RESOURCES ENTERPRISES INC 2,443.00 365 0.00 0 0.00 0
2017 KASTLE RESOURCES ENTERPRISES INC 2,874.00 365 0.00 0 0.00 0
2018 KASTLE RESOURCES ENTERPRISES INC 3,620.00 365 0.00 0 0.00 0
2019 L & B ENERGY LLP 4,575.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1991 JAMES DRILLING CORP Brine 206.00 Bbl
1993 JAMES DRILLING CORP Brine 57.00 Bbl
1994 JAMES DRILLING CORP Brine 139.00 Bbl
1996 JAMES DRILLING CORP Brine 70.00 Bbl Road Spreading
1997 JAMES DRILLING CORP Brine 73.00 Bbl Road Spreading VERNON TWP
1998 JAMES DRILLING CORP Brine 25.00 Bbl Road Spreading
1999 JAMES DRILLING CORP Brine 65.00 Bbl Road Spreading MERCER CO.
1999 JAMES DRILLING CORP Brine 20.00 Bbl Road Spreading VERNON TWP.
2000 JAMES DRILLING CORP Brine 40.00 Bbl Other WOODCOCK TWP
2000 JAMES DRILLING CORP Brine 118.00 Bbl Other VERNON TWP
2001 JAMES DRILLING CORP Brine 38.00 Bbl Road Spreading VERNON TWP
2001 JAMES DRILLING CORP Brine 94.00 Bbl Road Spreading WOODCOCK TWP
2002 JAMES DRILLING CORP Brine 30.00 Bbl Road Spreading
2003 JAMES DRILLING CORP Brine 15.00 Bbl Road Spreading
2008 KASTLE RESOURCES ENTERPRISES INC Brine 33.00 Bbl Road Spreading
2010 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 84.00 Bbl Road Spreading
2011 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 50.00 Bbl Road Spreading
2011 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 43.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2014 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 24.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2018 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 46.00 Bbl INJECTION DISPOSAL WELL 34-007-24523

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2028582 Primary Facility 2011-12-13 Routine/Complete Inspection No Violations Noted Upon inspection today I found a producing well with the annulus open. The production equipment consist of 140 bbl steel tank- separator- active production chart -overgrown dike- .Well tag was on well head
2102977 Primary Facility 2012-09-21 Routine/Complete Inspection No Violations Noted
358773 Primary Facility 1988-11-07 Drilling/Alteration No Violations Noted
358774 Primary Facility 1988-11-08 Drilling/Alteration No Violations Noted DEPTH AT 316'
358775 Primary Facility 1988-11-10 Drilling/Alteration No Violations Noted T.D. 3,826'
358776 Primary Facility 1989-01-23 Routine/Complete Inspection No Violations Noted
358777 Primary Facility 1989-06-28 Routine/Complete Inspection No Violations Noted
358778 Primary Facility 1989-10-30 Routine/Complete Inspection No Violations Noted SRF# 60-89-20-020
367223 Primary Facility 1990-11-14 Routine/Complete Inspection No Violations Noted
375326 Primary Facility 1993-12-21 Routine/Complete Inspection No Violations Noted
378436 Primary Facility 1995-06-26 Routine/Complete Inspection No Violations Noted
898795 Primary Facility 1999-12-01 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References