X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-25173"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-25173
 
| Well ID: 37-039-25173
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.686742, -80.115059 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.686742, -80.115059 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BETHESDA 5
 
| Farm/Lease Name: BETHESDA 5
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2007-07-24
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2007-07-06
 
| Permit Date: 2007-07-06
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.686742
 
| Latitude: 41.686742
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2007-07-06
 +
| New Permit Application
 +
|-
 +
| 2007-07-24
 +
| Performed Spud Operation
 +
|-
 +
| 2007-07-30
 +
| Drilling Completion
 +
|-
 +
| 2007-08-07
 +
| Perforation
 +
|-
 +
| 2007-09-06
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2008
 
| 2008
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| style="text-align: right;" | 6,626.00
+
| style="text-align: right;" | 6626.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 58.00
 
| style="text-align: right;" | 58.00
Line 172: Line 213:
 
!scope="col" | Disposal Method
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
|-
 
| 2008
 
| [[D & L ENERGY INC]]
 
| Brine
 
| style="text-align: right;" | 608.00 Bbl
 
|
 
|
 
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 314.00 Bbl
 
| style="text-align: right;" | 314.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 189: Line 223:
 
| 2010
 
| 2010
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 77.00 Bbl
 
| style="text-align: right;" | 77.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 196: Line 230:
 
| 2011
 
| 2011
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 181.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-22038
 +
|-
 +
| 2011
 +
| [[D & L ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 161.00 Bbl
 
| style="text-align: right;" | 161.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 203: Line 244:
 
| 2011
 
| 2011
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-099-23127
 
| 34-099-23127
|-
 
| 2011
 
| [[D & L ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 181.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-22038
 
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 296.00 Bbl
 
| style="text-align: right;" | 296.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 224: Line 258:
 
| 2013
 
| 2013
 
| [[D & L ENERGY INC]]
 
| [[D & L ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 79.00 Bbl
 
| style="text-align: right;" | 79.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2015
 +
| [[BOBCAT WELL & PIPELINE LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-20919
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[BOBCAT WELL & PIPELINE LLC]]
 
| [[BOBCAT WELL & PIPELINE LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 41.00 Bbl
 
| style="text-align: right;" | 41.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING

Latest revision as of 03:44, 15 May 2020

Well Details

Well ID: 37-039-25173
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Woodcock Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: BETHESDA 5
License Status: ACTIVE
Spud Date:
Permit Date: 2007-07-06
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.686742
Longitude: -80.115059

For data sources see[1][2][3]

Well History

Date Event
2007-07-06 New Permit Application
2007-07-24 Performed Spud Operation
2007-07-30 Drilling Completion
2007-08-07 Perforation
2007-09-06 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 D & L ENERGY INC 6626.00 366 58.00 365 0.00 0
2010 D & L ENERGY INC 4,149.40 365 56.64 365 0.00 0
2011 D & L ENERGY INC 3,984.80 365 48.28 365 0.00 0
2012 D & L ENERGY INC 0.00 0 0.00 0 0.00 0
2013 D & L ENERGY INC 3,154.74 365 0.01 365 0.00 0
2015 BOBCAT WELL & PIPELINE LLC 797.89 240 0.00 0 0.00 0
2016 BOBCAT WELL & PIPELINE LLC 0.00 0 0.00 0 0.00 0
2017 BOBCAT WELL & PIPELINE LLC 0.00 0 33.45 1 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 D & L ENERGY INC Produced Fluid 314.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010 D & L ENERGY INC Produced Fluid 77.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 D & L ENERGY INC Produced Fluid 181.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2011 D & L ENERGY INC Produced Fluid 161.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2011 D & L ENERGY INC Produced Fluid 70.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012 D & L ENERGY INC Produced Fluid 296.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2013 D & L ENERGY INC Produced Fluid 79.00 Bbl ROAD SPREADING
2015 BOBCAT WELL & PIPELINE LLC Produced Fluid 58.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2017 BOBCAT WELL & PIPELINE LLC Produced Fluid 41.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1638772 Primary Facility 2007-07-25 Compliance Evaluation In Compliance with Schedule
1950227 Primary Facility 2011-02-16 Complaint Inspection No Violations Noted Today's inspection was the result of a complaint called in from an unknown caller on 2/15/2011. Upon arriving at the site i found a small amount of brine/oil spray had apparently leaked from the dump line coming from the green stock tank to the overflow white plastic tank. The spray product was only on the surface of the snow, indicating the spraying took place for short period of time. Perhaps the system is on a timer that shut off the flow. Looking in the dike are I found no evidence of product. I did take photo's of the location. These photos on on my laptop under Bethesda # 5. I called D&L rep, Mike McKenize and told him about the sitiuation. Mike said he would have a well tender go out right away and call me after repairing the leak. No violation. 6" of snow on ground.
1961093 Primary Facility 2011-03-30 Complaint Inspection No Violations Noted Today's inspection was conducted in follow up to a complaint received 2/15/11, and my 2/16/2011 on-site inspection, to determine, (after the snow melt) if the small oil leak/spray reached outside the diking, and if any residual remains on-site. Upon inspection I found a producing well, with the annulus open. The stock tank and heater/dryer are both inside the diking. The oil leak has been repaired. I found no sign of oil residual outside the dike, and only a slight residual on the ground near the stock discharge inside the dike. As a result of this inspection, I will close the complaint.
2252388 Primary Facility 2014-03-11 Routine/Complete Inspection No Violations Noted
2334948 Primary Facility 2014-12-30 Routine/Complete Inspection No Violations Noted
2424498 Primary Facility 2015-11-05 Routine/Complete Inspection No Violations Noted
2546330 Primary Facility 2016-12-21 Administrative/File Review No Violations Noted

For data sources see[7]

References