X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-21237"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-21237
 
| Well ID: 37-063-21237
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.529877, -79.325044 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.529877, -79.325044 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ROCHESTER & PGH COAL CO 6
 
| Farm/Lease Name: ROCHESTER & PGH COAL CO 6
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 04/10/1969
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 3/25/1969
+
| Permit Date: 1969-03-25
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.529877
 
| Latitude: 40.529877
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1969-03-25
 +
| New Permit Application
 +
|-
 +
| 1969-04-10
 +
| Performed Spud Operation
 +
|-
 +
| 1969-06-21
 +
| Drilling Completion
 +
|-
 +
| 1969-07-02
 +
| Perforation
 +
|-
 +
| 1970-01-11
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 1991
 
| 1991
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 3,683.00
+
| style="text-align: right;" | 3683.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 3,339.00
+
| style="text-align: right;" | 3339.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 2,988.00
+
| style="text-align: right;" | 2988.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 4,485.00
+
| style="text-align: right;" | 4485.00
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[JAMES DRILLING CORP]]
 +
| style="text-align: right;" | 936.00
 +
| style="text-align: right;" | 71
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 4,159.00
+
| style="text-align: right;" | 4159
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 1,947.00
+
| style="text-align: right;" | 1947
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[JAMES DRILLING CORP]]
 
| [[JAMES DRILLING CORP]]
| style="text-align: right;" | 457.00
+
| style="text-align: right;" | 457
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[KRIEBEL GAS INC]]
 
| [[KRIEBEL GAS INC]]
| style="text-align: right;" | 2,957.00
+
| style="text-align: right;" | 2957
 
| style="text-align: right;" | 310
 
| style="text-align: right;" | 310
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,654.00
+
| style="text-align: right;" | 2654
 
| style="text-align: right;" | 229
 
| style="text-align: right;" | 229
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,512.00
+
| style="text-align: right;" | 2512
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,585.00
+
| style="text-align: right;" | 3585
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,142.00
+
| style="text-align: right;" | 3142
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EDWARD G KRIEBEL GAS CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 2,641.00
+
| style="text-align: right;" | 2641
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,244.00
+
| style="text-align: right;" | 2244
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 191: Line 266:
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,289.00
+
| style="text-align: right;" | 2289.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 1,928.00
+
| style="text-align: right;" | 1928.00
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 2,034.00
+
| style="text-align: right;" | 2034.00
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 227: Line 302:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 236: Line 311:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 245: Line 320:
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 254: Line 329:
 
| style="text-align: right;" | 326
 
| style="text-align: right;" | 326
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 263: Line 338:
 
| style="text-align: right;" | 324
 
| style="text-align: right;" | 324
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 272: Line 347:
 
| style="text-align: right;" | 323
 
| style="text-align: right;" | 323
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 281: Line 356:
 
| style="text-align: right;" | 265
 
| style="text-align: right;" | 265
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 290: Line 365:
 
| style="text-align: right;" | 145
 
| style="text-align: right;" | 145
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 299: Line 374:
 
| style="text-align: right;" | 207
 
| style="text-align: right;" | 207
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 1,502.00
 +
| style="text-align: right;" | 324
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 313: Line 397:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 318: Line 403:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1994-0
+
| 1994
 +
| [[JAMES DRILLING CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 22.00 Bbl
 
| style="text-align: right;" | 22.00 Bbl
Line 324: Line 410:
 
|  
 
|  
 
|-
 
|-
| 2002-0
+
| 2002
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 23.00 Bbl
 
| style="text-align: right;" | 23.00 Bbl
Line 330: Line 417:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2004-0
+
| 2004
 +
|
 
| Brine
 
| Brine
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 336: Line 424:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2008-0
+
| 2008
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 361: Line 450:
 
| 2253596
 
| 2253596
 
| Primary Facility
 
| Primary Facility
| 02/25/2010
+
| 2010-02-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 403: Line 492:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 03:58, 15 May 2020

Well Details

Well ID: 37-063-21237
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Young Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: ROCHESTER & PGH COAL CO 6
License Status: ACTIVE
Spud Date:
Permit Date: 1969-03-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.529877
Longitude: -79.325044

For data sources see[1][2][3]

Well History

Date Event
1969-03-25 New Permit Application
1969-04-10 Performed Spud Operation
1969-06-21 Drilling Completion
1969-07-02 Perforation
1970-01-11 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 JAMES DRILLING CORP 3683.00 365 0.00 0 0.00 0
1992 JAMES DRILLING CORP 3339.00 366 0.00 0 0.00 0
1993 JAMES DRILLING CORP 2988.00 365 0.00 0 0.00 0
1994 JAMES DRILLING CORP 4485.00 362 0.00 0 0.00 0
1995 JAMES DRILLING CORP 936.00 71 0.00 0 0.00 0
1996 JAMES DRILLING CORP 4159 365 0.00 0 0.00 0
1997 JAMES DRILLING CORP 1947 214 0.00 0 0.00 0
1998 JAMES DRILLING CORP 457 31 0.00 0 0.00 0
1999 KRIEBEL GAS INC 2957 310 0.00 0 0.00 0
2000 KRIEBEL MINERALS INC 2654 229 0.00 0 0.00 0
2001 KRIEBEL MINERALS INC 2512 242 0.00 0 0.00 0
2002 KRIEBEL MINERALS INC 3585 359 0.00 0 0.00 0
2003 KRIEBEL MINERALS INC 3142 346 0.00 0 0.00 0
2004 2641 365 0.00 0 0.00 0
2005 KRIEBEL MINERALS INC 2244 365 0.00 0 0.00 0
2006 KRIEBEL MINERALS INC 2,816.00 357 0.00 0 0.00 0
2007 KRIEBEL MINERALS INC 2289.00 365 0.00 0 0.00 0
2008 KRIEBEL MINERALS INC 1928.00 359 0.00 0 0.00 0
2009 KRIEBEL MINERALS INC 2034.00 364 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 2,033.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 1,722.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 1,553.00 333 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 1,578.00 326 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 1,887.00 324 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 1,501.00 323 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 1,267.00 265 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 81.00 145 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 1,194.00 207 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 1,502.00 324 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1994 JAMES DRILLING CORP Brine 22.00 Bbl
2002 KRIEBEL MINERALS INC Brine 23.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2004 Brine 100.00 Bbl Other PA0091472
2008 KRIEBEL MINERALS INC Brine 30.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2253596 Primary Facility 2010-02-25 Routine/Complete Inspection No Violations Noted Producing gas; tag, tank, E&S ok.
566705 Primary Facility 1994-06-08 Routine/Complete Inspection No Violations Noted E&S OK; TANK

For data sources see[7]

References