X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-25780"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-25780
 
| Well ID: 37-039-25780
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.738422, -80.308247 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.738422, -80.308247 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: RABER UNIT 1
 
| Farm/Lease Name: RABER UNIT 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2013-09-23
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2013-08-09
 
| Permit Date: 2013-08-09
 +
|-
 +
| Well Type: COMB. OIL&GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Deviated Well
 
| Configuration: Deviated Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.738422
 
| Latitude: 41.738422
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-08-09
 +
| New Permit Application
 +
|-
 +
| 2013-09-23
 +
| Performed Spud Operation
 +
|-
 +
| 2013-10-08
 +
| Drilling Completion
 +
|-
 +
| 2013-11-07
 +
| Perforation
 +
|-
 +
| 2014-05-07
 +
| DEVIATED
 +
|-
 +
| 2014-09-16
 +
| Perforation
 +
|-
 +
| 2015-01-30
 +
| REWORKED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 107:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 135: Line 182:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 302.00
 
| style="text-align: right;" | 302.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| style="text-align: right;" | 1,107.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 355.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 157: Line 213:
 
| 2014
 
| 2014
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 259.00 Bbl
 
| style="text-align: right;" | 259.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24523
 
| 34-007-24523
 +
|-
 +
| 2015
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 378.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 +
|-
 +
| 2015
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12.00 Bbl
 +
| ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 608.00 Bbl
 
| style="text-align: right;" | 608.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 171: Line 241:
 
| 2017
 
| 2017
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 376.00 Bbl
 
| style="text-align: right;" | 376.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 178: Line 248:
 
| 2018
 
| 2018
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
 
| [[KASTLE RESOURCES ENTERPRISES INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 695.00 Bbl
 
| style="text-align: right;" | 695.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 +
|-
 +
| 2019
 +
| [[KASTLE RESOURCES ENTERPRISES INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 447.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24523
 
| 34-007-24523

Latest revision as of 04:48, 15 May 2020

Well Details

Well ID: 37-039-25780
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Summerhill Township
Operator Name: KASTLE RESOURCES ENTERPRISES INC
Well Pad ID:
Farm/Lease Name: RABER UNIT 1
License Status:
Spud Date:
Permit Date: 2013-08-09
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Deviated Well
Conservation: Yes
Latitude: 41.738422
Longitude: -80.308247

For data sources see[1][2][3]

Well History

Date Event
2013-08-09 New Permit Application
2013-09-23 Performed Spud Operation
2013-10-08 Drilling Completion
2013-11-07 Perforation
2014-05-07 DEVIATED
2014-09-16 Perforation
2015-01-30 REWORKED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 KASTLE RESOURCES ENTERPRISES INC 0.00 0 0.00 0 0.00 0
2014 KASTLE RESOURCES ENTERPRISES INC 144.00 365 0.00 0 0.00 0
2015 KASTLE RESOURCES ENTERPRISES INC 1,348.00 365 364.00 365 0.00 0
2016 KASTLE RESOURCES ENTERPRISES INC 1,862.00 365 544.82 365 0.00 0
2017 KASTLE RESOURCES ENTERPRISES INC 2,087.00 365 417.55 365 0.00 0
2018 KASTLE RESOURCES ENTERPRISES INC 919.00 365 302.00 365 0.00 0
2019 KASTLE RESOURCES ENTERPRISES INC 1,107.00 365 355.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 259.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2015 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 378.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2015 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 12.00 Bbl ROAD SPREADING
2016 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 608.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2017 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 376.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2018 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 695.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2019 KASTLE RESOURCES ENTERPRISES INC Produced Fluid 447.00 Bbl INJECTION DISPOSAL WELL 34-007-24523

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2205305 Primary Facility 2013-09-18 Routine/Partial Inspection No Violations Noted
2206008 Primary Facility 2013-09-20 Construction No Violations Noted
2207600 Primary Facility 2013-09-25 Routine/Complete Inspection No Violations Noted
2209168 Primary Facility 2013-09-25 Drilling/Alteration No Violations Noted
2209373 Primary Facility 2013-09-27 Drilling/Alteration No Violations Noted
2209385 Primary Facility 2013-09-30 Drilling/Alteration No Violations Noted
2210080 Primary Facility 2013-10-04 Routine/Complete Inspection No Violations Noted
2211726 Primary Facility 2013-10-10 Routine/Complete Inspection No Violations Noted
2213791 Primary Facility 2013-10-18 Routine/Complete Inspection No Violations Noted
2215641 Primary Facility 2013-10-23 Routine/Complete Inspection No Violations Noted
2216846 Primary Facility 2013-10-07 Drilling/Alteration No Violations Noted
2219433 Primary Facility 2013-11-06 Routine/Complete Inspection No Violations Noted
2221145 Primary Facility 2013-11-13 Routine/Complete Inspection No Violations Noted
2228835 Primary Facility 2013-12-11 Routine/Complete Inspection No Violations Noted
2270602 Primary Facility 2014-05-14 Routine/Complete Inspection No Violations Noted
2328551 Primary Facility 2014-12-11 Site Restoration No Violations Noted

For data sources see[7]

References