X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-22179"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-22179
 
| Well ID: 37-063-22179
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.779056, -79.091733 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.779056, -79.091733 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: DAVID MILLER 1
 
| Farm/Lease Name: DAVID MILLER 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 08/04/1973
+
| Spud Date: 1973-08-04
 
|-
 
|-
| Permit Date: 7/2/1973
+
| Permit Date: 1973-07-02
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.779056
 
| Latitude: 40.779056
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1973-07-02
 +
| New Permit Application
 +
|-
 +
| 1973-08-04
 +
| Performed Spud Operation
 +
|-
 +
| 1973-08-08
 +
| Drilling Completion
 +
|-
 +
| 1973-09-10
 +
| Perforation
 +
|-
 +
| 1973-10-02
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 1991
 
| 1991
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,335.00
+
| style="text-align: right;" | 1335.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 1171.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[ENERGY CORP OF AMER]]
 +
| style="text-align: right;" | 2784.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 1,027.00
+
| style="text-align: right;" | 1027
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 710.00
+
| style="text-align: right;" | 710
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 697.00
+
| style="text-align: right;" | 697
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 607.00
+
| style="text-align: right;" | 607
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 704.00
+
| style="text-align: right;" | 704
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 573.00
+
| style="text-align: right;" | 573
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 501.00
+
| style="text-align: right;" | 501
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 566.00
+
| style="text-align: right;" | 566
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 608.00
+
| style="text-align: right;" | 608
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 493.00
+
| style="text-align: right;" | 493
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 11.00
 
| style="text-align: right;" | 11.00
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 702.00
 
| style="text-align: right;" | 702.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 951.00
 
| style="text-align: right;" | 951.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 954.00
 
| style="text-align: right;" | 954.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 284:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 293:
 
| style="text-align: right;" | 313
 
| style="text-align: right;" | 313
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[ENERGY CORP OF AMER]]
 
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 605.20
+
| style="text-align: right;" | 605.2
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[ENERGY CORP OF AMER]]
 
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 547.70
+
| style="text-align: right;" | 547.7
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[ENERGY CORP OF AMER]]
 
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 451.20
+
| style="text-align: right;" | 451.2
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[ENERGY CORP OF AMER]]
 
| [[ENERGY CORP OF AMER]]
| style="text-align: right;" | 352.30
+
| style="text-align: right;" | 352.3
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 254: Line 338:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 263: Line 347:
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GREYLOCK OPCO LLC]]
 +
| style="text-align: right;" | 467.60
 +
| style="text-align: right;" | 271
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 277: Line 370:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 282: Line 376:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1991-0
+
| 1991
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 187.00 Bbl
 
| style="text-align: right;" | 187.00 Bbl
Line 288: Line 383:
 
|  
 
|  
 
|-
 
|-
| 1996-0
+
| 1996
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 294: Line 390:
 
| PAS23D032BARM
 
| PAS23D032BARM
 
|-
 
|-
| 2001-0
+
| 2001
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 300: Line 397:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2002-0
+
| 2002
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0026310
+
| PA0091472
 
|-
 
|-
| 2002-0
+
| 2002
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0091472
+
| PA0026310
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 160.00 Bbl
 
| style="text-align: right;" | 160.00 Bbl
Line 318: Line 418:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2004-0
+
| 2004
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 155.00 Bbl
 
| style="text-align: right;" | 155.00 Bbl
Line 324: Line 425:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2005-0
+
| 2005
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 330: Line 432:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 336: Line 439:
 
| PA0026310
 
| PA0026310
 
|-
 
|-
| 2010-0
+
| 2010
| Produced Fluid (in Barrels)
+
| [[ENERGY CORP OF AMER]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0026310
 +
|-
 +
| 2010
 +
| [[ENERGY CORP OF AMER]]
 +
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
|-
 
| 2010-0
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 50.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026310
 
 
|-
 
|-
 
|}
 
|}
Line 367: Line 472:
 
| 1774552
 
| 1774552
 
| Primary Facility
 
| Primary Facility
| 03/06/2009
+
| 2009-03-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 402: Line 507:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 05:36, 15 May 2020

Well Details

Well ID: 37-063-22179
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: East Mahoning Township
Operator Name: GRANGASCO
Well Pad ID:
Farm/Lease Name: DAVID MILLER 1
License Status: ACTIVE
Spud Date: 1973-08-04
Permit Date: 1973-07-02
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.779056
Longitude: -79.091733

For data sources see[1][2][3]

Well History

Date Event
1973-07-02 New Permit Application
1973-08-04 Performed Spud Operation
1973-08-08 Drilling Completion
1973-09-10 Perforation
1973-10-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 ENERGY CORP OF AMER 1335.00 365 0.00 0 0.00 0
1994 ENERGY CORP OF AMER 1171.00 365 0.00 0 0.00 0
1995 ENERGY CORP OF AMER 2784.00 365 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 1027 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 710 365 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 697 365 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 607 365 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 704 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 573 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 501 365 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 566 365 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 608 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 493 365 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 11.00 30 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 702.00 365 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 951.00 365 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 954.00 365 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 876.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 445.00 313 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 605.2 366 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 547.7 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 451.2 365 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 352.3 365 0.00 0 0.00 0
2017 ENERGY CORP OF AMER 352.00 365 0.00 0 0.00 0
2018 GREYLOCK OPCO LLC 320.50 210 0.00 0 0.00 0
2019 GREYLOCK OPCO LLC 467.60 271 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1991 ENERGY CORP OF AMER Brine 187.00 Bbl
1996 ENERGY CORP OF AMER Brine 40.00 Bbl Injection Disposal Well PAS23D032BARM
2001 ENERGY CORP OF AMER Brine 160.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2002 ENERGY CORP OF AMER Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2002 ENERGY CORP OF AMER Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0026310
2003 ENERGY CORP OF AMER Brine 160.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2004 ENERGY CORP OF AMER Brine 155.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2005 ENERGY CORP OF AMER Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 ENERGY CORP OF AMER Brine 80.00 Bbl Municipal Sewage Treatment Plant PA0026310
2010 ENERGY CORP OF AMER Produced Fluid 50.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 ENERGY CORP OF AMER Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1774552 Primary Facility 2009-03-06 Routine/Complete Inspection No Violations Noted Well site appears to be in production. No accelerated erosion and sedimentation noted on the access road or well site. Brine Tank located on-site is in sound condition. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete.

For data sources see[7]

References