X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-22805"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-22805
 
| Well ID: 37-085-22805
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.192894, -80.467378 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.192894, -80.467378 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HMA UNIT 1
 
| Farm/Lease Name: HMA UNIT 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 07/09/2000
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 4/25/2000
+
| Permit Date: 2000-04-25
 +
|-
 +
| Well Type: COMB. OIL&GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.192894
 
| Latitude: 41.192894
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2000-04-25
 +
| New Permit Application
 +
|-
 +
| 2000-07-09
 +
| Performed Spud Operation
 +
|-
 +
| 2000-07-14
 +
| Drilling Completion
 +
|-
 +
| 2000-08-14
 +
| Perforation
 +
|-
 +
| 2001-01-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 2001
 
| 2001
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 14,115.00
+
| style="text-align: right;" | 14115
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 135.53
 
| style="text-align: right;" | 135.53
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 10,583.00
+
| style="text-align: right;" | 10583
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 119.00
+
| style="text-align: right;" | 119
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 7,985.00
+
| style="text-align: right;" | 7985
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 54.06
 
| style="text-align: right;" | 54.06
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 6,845.00
+
| style="text-align: right;" | 6845
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 5,310.00
+
| style="text-align: right;" | 5310
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 53.85
 
| style="text-align: right;" | 53.85
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 5,183.00
+
| style="text-align: right;" | 5183.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 4,833.00
+
| style="text-align: right;" | 4833.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 68.00
+
| style="text-align: right;" | 68
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 5,295.00
+
| style="text-align: right;" | 5295.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 54.00
 
| style="text-align: right;" | 54.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 4,404.00
+
| style="text-align: right;" | 4404.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 146: Line 212:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 155: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 164: Line 230:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 175: Line 241:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 184: Line 250:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 191: Line 257:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 202: Line 268:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 275:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[DJR WELL SERVICES INC]]
 +
| style="text-align: right;" | 3,323.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 34.30
 +
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 298:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 304:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2001-0
+
| 2001
 +
| [[WILKES ENERGY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 85.00 Bbl
 
| style="text-align: right;" | 85.00 Bbl
Line 234: Line 311:
 
| UIC 325
 
| UIC 325
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[WILKES ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 48.00 Bbl
 
| style="text-align: right;" | 48.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-155-23223
 
| 34-155-23223
 
|-
 
|-
Line 266: Line 344:
 
| 950048
 
| 950048
 
| Primary Facility
 
| Primary Facility
| 07/11/2000
+
| 2000-07-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 273: Line 351:
 
| 951137
 
| 951137
 
| Primary Facility
 
| Primary Facility
| 07/12/2000
+
| 2000-07-12
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 280: Line 358:
 
| 962350
 
| 962350
 
| Primary Facility
 
| Primary Facility
| 08/24/2000
+
| 2000-08-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 287: Line 365:
 
| 993501
 
| 993501
 
| Primary Facility
 
| Primary Facility
| 01/09/2001
+
| 2001-01-09
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 322: Line 400:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 06:41, 15 May 2020

Well Details

Well ID: 37-085-22805
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Hermitage City
Operator Name: DJR WELL SERVICES INC
Well Pad ID:
Farm/Lease Name: HMA UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2000-04-25
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.192894
Longitude: -80.467378

For data sources see[1][2][3]

Well History

Date Event
2000-04-25 New Permit Application
2000-07-09 Performed Spud Operation
2000-07-14 Drilling Completion
2000-08-14 Perforation
2001-01-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 WILKES ENERGY INC 14115 365 135.53 365 0.00 0
2002 WILKES ENERGY INC 10583 365 119 365 0.00 0
2003 WILKES ENERGY INC 7985 365 54.06 365 0.00 0
2004 WILKES ENERGY INC 6845 365 0.00 0 0.00 0
2005 WILKES ENERGY INC 5310 365 53.85 365 0.00 0
2006 WILKES ENERGY INC 5183.00 365 0.00 0 0.00 0
2007 WILKES ENERGY INC 4833.00 365 68 365 0.00 0
2008 WILKES ENERGY INC 5295.00 365 54.00 365 0.00 0
2009 WILKES ENERGY INC 4404.00 365 0.00 0 0.00 0
2010 WILKES ENERGY INC 3,382.00 365 0.00 0 0.00 0
2011 WILKES ENERGY INC 4,892.00 365 0.00 0 0.00 0
2012 WILKES ENERGY INC 3,876.00 365 0.00 0 0.00 0
2013 WILKES ENERGY INC 3,596.00 365 67.14 365 0.00 0
2014 WILKES ENERGY INC 3,962.99 365 68.12 365 0.00 0
2015 WILKES ENERGY INC 2,944.00 365 0.00 0 0.00 0
2016 WILKES ENERGY INC 2,900.00 365 59.85 365 0.00 0
2018 DJR WELL SERVICES INC 2,961.00 365 0.00 0 0.00 0
2019 DJR WELL SERVICES INC 3,323.00 365 34.30 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2001 WILKES ENERGY INC Brine 85.00 Bbl Injection Disposal Well UIC 325
2016 WILKES ENERGY INC Produced Fluid 48.00 Bbl Injection Disposal Well 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2559017 Primary Facility 2017-02-01 Routine/Partial Inspection No Violations Noted
950048 Primary Facility 2000-07-11 Drilling/Alteration No Violations Noted
951137 Primary Facility 2000-07-12 Drilling/Alteration No Violations Noted drilling at 3706 ft. Reported cement return on surface casing. Drill pit freeboard OK.
962350 Primary Facility 2000-08-24 Routine/Complete Inspection No Violations Noted
993501 Primary Facility 2001-01-09 Administrative/File Review No Violations Noted well record review

For data sources see[7]

References