X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-22422"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-22422
 
| Well ID: 37-125-22422
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.034971, -80.509061 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.034944, -80.509061 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: HANSEN ENGINEERING INC 1
+
| Farm/Lease Name: HANSEN ENGINEERING INC
 
|-
 
|-
| License Status: Active
+
| License Status: Plugged and Abandoned
 
|-
 
|-
| Spud Date: 2006-08-28
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2006-08-08
 
| Permit Date: 2006-08-08
 +
|-
 +
| Well Type: COALBED METHANE
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 29: Line 31:
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 40.034971
+
| Conservation: No
 +
|-
 +
| Latitude: 40.034944
 
|-
 
|-
 
| Longitude: -80.509061
 
| Longitude: -80.509061
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-08-08
 +
| New Permit Application
 +
|-
 +
| 2006-08-28
 +
| Performed Spud Operation
 +
|-
 +
| 2006-08-31
 +
| Drilling Completion
 +
|-
 +
| 2008-05-06
 +
| NEWLY DRILLED
 +
|-
 +
| 2019-12-11
 +
| Begin Plugging
 +
|-
 +
| 2019-12-12
 +
| Finished Plugging
 +
|-
 +
| 2020-02-13
 +
| Fully Plugged
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 107:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 96: Line 143:
 
| 2007
 
| 2007
 
| [[JESMAR ENERGY INC]]
 
| [[JESMAR ENERGY INC]]
| style="text-align: right;" | 17,833.00
+
| style="text-align: right;" | 17833.00
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 152:
 
| 2008
 
| 2008
 
| [[JESMAR ENERGY INC]]
 
| [[JESMAR ENERGY INC]]
| style="text-align: right;" | 49,112.00
+
| style="text-align: right;" | 49112.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 161:
 
| 2009
 
| 2009
 
| [[JESMAR ENERGY INC]]
 
| [[JESMAR ENERGY INC]]
| style="text-align: right;" | 44,241.00
+
| style="text-align: right;" | 44241.00
 
| style="text-align: right;" | 258
 
| style="text-align: right;" | 258
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 225: Line 272:
 
| 2010
 
| 2010
 
| [[JESMAR ENERGY INC]]
 
| [[JESMAR ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE

Latest revision as of 06:53, 15 May 2020

Well Details

Well ID: 37-125-22422
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Finley Township
Operator Name: ROBIN ENERGY INC
Well Pad ID:
Farm/Lease Name: HANSEN ENGINEERING INC
License Status: Plugged and Abandoned
Spud Date:
Permit Date: 2006-08-08
Well Type: COALBED METHANE
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.034944
Longitude: -80.509061

For data sources see[1][2][3]

Well History

Date Event
2006-08-08 New Permit Application
2006-08-28 Performed Spud Operation
2006-08-31 Drilling Completion
2008-05-06 NEWLY DRILLED
2019-12-11 Begin Plugging
2019-12-12 Finished Plugging
2020-02-13 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2007 JESMAR ENERGY INC 17833.00 122 0.00 0 0.00 0
2008 JESMAR ENERGY INC 49112.00 365 0.00 0 0.00 0
2009 JESMAR ENERGY INC 44241.00 258 0.00 0 0.00 0
2010 JESMAR ENERGY INC 38,447.00 342 0.00 0 0.00 0
2011 JESMAR ENERGY INC 4,604.00 90 0.00 0 0.00 0
2012 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2013 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2014 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2015 ROBIN ENERGY INC 0.00 0 0.00 0 0.00 0
2016 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2017 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 JESMAR ENERGY INC Brine 190.00 Bbl Brine or Industrial Waste Treatment Plt
2009 JESMAR ENERGY INC Brine 119.00 Bbl Brine or Industrial Waste Treatment Plt A2392008 PBR
2010 JESMAR ENERGY INC Produced Fluid 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA-2392008

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1590577 Primary Facility 2006-08-29 Drilling/Alteration No Violations Noted DRILLING AT 431'/PIT/E&S OK
1716170 Primary Facility 2008-06-17 Site Restoration No Violations Noted equipped/tank ok/tag advice/E&S advice
1976193 Primary Facility 2011-04-06 Routine/Complete Inspection No Violations Noted Compressor area needs some attention as to leakage that could result in spill on site, spoke to Mr. Robinson concerning thia and he indicated it was on repair list and that it would be addressed.
2640263 Primary Facility 2017-09-13 Incident- Response to Accident or Event No Violations Noted On September 13, 2017, the Department performed an inspection of the Robin Energy Hansen#1 CBM well. The well is located in West Finley Twp., Washington Co. The inspection was related to release of mercaptan at the well site.

The operator plans to begin plugging and reclamation of the well site. The operator purchased the well from Jesmar in 2011 and produced the well for approximately 6 months. The well has been inactive since 2012. The Department records continue to have the operator as Jesmar. The Department spoke with Robert Robinson the owner of Robin Energy, about the release. Mr. Robinson stated that during removal of production equipment from the site a mercaptan tank was encountered buried on the northeast corner of the well pad. During removal and placement of the tank on the trailer on site the tank released approximately 2 gallons of mercaptan to the trailer and ground. The operator used bleach to oxidize the the mercaptan in the soil and on the trailer and has encased the mercaptan tank in p

2641248 Primary Facility 2017-09-26 Routine/Complete Inspection No Violations Noted On September 13, 2017, the Department performed an inspection of the Robin Energy Hansen#1 CBM well. The well is located in West Finley Twp., Washington Co. The inspection was related to release of mercaptan at the well site.

The operator plans to begin plugging and reclamation of the well site. The operator purchased the well from Jesmar and during removal of production equipment a mercaptan tank was discovered. During removal of the tank approximately 2 gallons of mercaptan was released to the trailer and ground. The operator used bleach to oxidize the the mercaptan in the soil and on the trailer and has encased the mercaptan tank in plastic for disposal. The tank is being stored at the Blum 1 CBM well. A small storage box has ben brought to the site to store impacted material for disposal. The operator has contracted with Enviroserv to characterize the impacted soil for disposal and to remediate the release. A meeting is planned in the future with Department to initiate the plugging of the five CBM w

For data sources see[7]

References