X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24214"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-24214
 
| Well ID: 37-085-24214
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.450208, -80.294183 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.450208, -80.294183 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: THOMPSON G 5
 
| Farm/Lease Name: THOMPSON G 5
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2006-11-28
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2006-11-08
 
| Permit Date: 2006-11-08
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.450208
 
| Latitude: 41.450208
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-11-08
 +
| New Permit Application
 +
|-
 +
| 2006-11-28
 +
| Performed Spud Operation
 +
|-
 +
| 2006-12-04
 +
| Drilling Completion
 +
|-
 +
| 2007-02-06
 +
| Perforation
 +
|-
 +
| 2007-08-31
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2007
 
| 2007
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 10,890.00
+
| style="text-align: right;" | 10890.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2008
 
| 2008
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 7,771.00
+
| style="text-align: right;" | 7771.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2009
 
| 2009
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 2,186.00
+
| style="text-align: right;" | 2186.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 181: Line 222:
 
| style="text-align: right;" | 57.52
 
| style="text-align: right;" | 57.52
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[DIAMOND ENERGY PARTNERS LLC]]
 +
| style="text-align: right;" | 440.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 216: Line 266:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 107.00 Bbl
 
| style="text-align: right;" | 107.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 223: Line 273:
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 230: Line 280:
 
| 2012
 
| 2012
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 95.00 Bbl
 
| style="text-align: right;" | 95.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 237: Line 287:
 
| 2013
 
| 2013
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 37.00 Bbl
 
| style="text-align: right;" | 37.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 37 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 14.00 Bbl
 
| style="text-align: right;" | 14.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-20919
 
| 34-007-20919
 +
|-
 +
| 2018
 +
| [[DIAMOND ENERGY PARTNERS LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.85 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-22523
 
|-
 
|-
 
|}
 
|}

Latest revision as of 09:13, 15 May 2020

Well Details

Well ID: 37-085-24214
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Salem Township
Operator Name: DIAMOND ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: THOMPSON G 5
License Status: ACTIVE
Spud Date:
Permit Date: 2006-11-08
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.450208
Longitude: -80.294183

For data sources see[1][2][3]

Well History

Date Event
2006-11-08 New Permit Application
2006-11-28 Performed Spud Operation
2006-12-04 Drilling Completion
2007-02-06 Perforation
2007-08-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 VISTA OPR INC 10890.00 365 0.00 0 0.00 0
2008 VISTA OPR INC 7771.00 365 0.00 0 0.00 0
2009 VISTA OPR INC 2186.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 3,634.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 2,791.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 349.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 488.00 365 80.53 365 0.00 0
2014 VISTA OPR INC 351.00 365 78.27 365 0.00 0
2015 VISTA OPR INC 287.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 563.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 488.00 365 57.52 30 0.00 0
2019 DIAMOND ENERGY PARTNERS LLC 440.00 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 VISTA OPR INC Brine 225.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 VISTA OPR INC Brine 150.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid 107.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Produced Fluid 35.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 VISTA OPR INC Produced Fluid 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 VISTA OPR INC Produced Fluid 30.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2013 VISTA OPR INC Produced Fluid 30 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 VISTA OPR INC Produced Fluid 37.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 VISTA OPR INC Produced Fluid 37 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 VISTA OPR INC Produced Fluid 14.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2018 DIAMOND ENERGY PARTNERS LLC Produced Fluid 35.85 Bbl INJECTION DISPOSAL WELL 34-133-22523

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2038654 Primary Facility 2012-01-31 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References