If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-085-24310 | | Well ID: 37-085-24310 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.412066, -80.082898 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: HELMUTH UNIT 2 | | Farm/Lease Name: HELMUTH UNIT 2 | ||
|- | |- | ||
− | | License Status: | + | | License Status: ACTIVE |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2007-06-13 | | Permit Date: 2007-06-13 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 41.412066 | | Latitude: 41.412066 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2007-06-13 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2007-07-13 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2007-07-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2007-07-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2007-12-13 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 101: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 87: | Line 128: | ||
| 2007 | | 2007 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3546.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 96: | Line 137: | ||
| 2008 | | 2008 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 14834.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 105: | Line 146: | ||
| 2009 | | 2009 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7726.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 188: | Line 229: | ||
| style="text-align: right;" | 2,629.00 | | style="text-align: right;" | 2,629.00 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 1,469.00 | ||
+ | | style="text-align: right;" | 212 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 218: | Line 268: | ||
| 2010 | | 2010 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 225: | Line 275: | ||
| 2011 | | 2011 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 40.00 Bbl | | style="text-align: right;" | 40.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 232: | Line 282: | ||
| 2016 | | 2016 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 25.00 Bbl | | style="text-align: right;" | 25.00 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING | ||
Line 239: | Line 289: | ||
| 2018 | | 2018 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 33.00 Bbl | | style="text-align: right;" | 33.00 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING |
Well ID: 37-085-24310 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.412066,"lon":-80.082898,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: New Lebanon Borough | |
Operator Name: VISTA OPR INC | |
Well Pad ID: | |
Farm/Lease Name: HELMUTH UNIT 2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-06-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.412066 | |
Longitude: -80.082898 |
Date | Event |
---|---|
2007-06-13 | New Permit Application |
2007-07-13 | Performed Spud Operation |
2007-07-18 | Drilling Completion |
2007-07-27 | Perforation |
2007-12-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | VISTA OPR INC | 3546.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | VISTA OPR INC | 14834.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | VISTA OPR INC | 7726.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | VISTA OPR INC | 6,050.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | VISTA OPR INC | 4,727.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | VISTA OPR INC | 6,178.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | VISTA OPR INC | 5,127.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | VISTA OPR INC | 4,533.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | VISTA OPR INC | 4,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | VISTA OPR INC | 4,094.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | VISTA OPR INC | 3,566.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | VISTA OPR INC | 2,629.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | VISTA OPR INC | 1,469.00 | 212 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | VISTA OPR INC | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2010 | VISTA OPR INC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | VISTA OPR INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2016 | VISTA OPR INC | Produced Fluid | 25.00 Bbl | ROAD SPREADING | |
2018 | VISTA OPR INC | Produced Fluid | 33.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1636237 | Primary Facility | 2007-07-16 | Drilling/Alteration | No Violations Noted | |
1957853 | Primary Facility | 2011-03-15 | Routine/Complete Inspection | No Violations Noted | |
2714326 | Primary Facility | 2018-04-04 | Routine/Partial Inspection | No Violations Noted | A weekly chart with production is on the meter in separator unit. Tubing is open to separator unit. Production casing is open to a domestic gas meter. Surface casing appears to be open to the tank based on the 1" steel line connected to it. |
For data sources see[7]