X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24528"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-24528
 
| Well ID: 37-085-24528
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.370561, -80.139067 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.370561, -80.139067 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JONES MCCLELLAND 1
 
| Farm/Lease Name: JONES MCCLELLAND 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-01-14
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2009-10-19
 
| Permit Date: 2009-10-19
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.370561
 
| Latitude: 41.370561
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-10-19
 +
| New Permit Application
 +
|-
 +
| 2010-01-14
 +
| Performed Spud Operation
 +
|-
 +
| 2010-01-20
 +
| Drilling Completion
 +
|-
 +
| 2010-01-25
 +
| Perforation
 +
|-
 +
| 2010-05-17
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 184: Line 225:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 260.00 Bbl
 
| style="text-align: right;" | 260.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 191: Line 232:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 1,330.00 Bbl
 
| style="text-align: right;" | 1,330.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 198: Line 239:
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE

Latest revision as of 10:45, 15 May 2020

Well Details

Well ID: 37-085-24528
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Pennsylvania
County: Mercer
Municipality: New Vernon Township
Operator Name: VISTA OPR INC
Well Pad ID:
Farm/Lease Name: JONES MCCLELLAND 1
License Status:
Spud Date:
Permit Date: 2009-10-19
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.370561
Longitude: -80.139067

For data sources see[1][2][3]

Well History

Date Event
2009-10-19 New Permit Application
2010-01-14 Performed Spud Operation
2010-01-20 Drilling Completion
2010-01-25 Perforation
2010-05-17 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 VISTA OPR INC 17,070.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 13,497.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 7,087.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 5,036.00 365 0.00 0 0.00 0
2014 VISTA OPR INC 4,859.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 4,270.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 4,854.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 4,372.00 365 0.00 0 0.00 0
2018 VISTA OPR INC 2,648.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 VISTA OPR INC Produced Fluid 260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 VISTA OPR INC Fracing Fluid Waste 1,330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1856280 Primary Facility 2010-01-15 Drilling/Alteration No Violations Noted
1868182 Primary Facility 2010-03-04 Routine/Complete Inspection No Violations Noted
1984608 Primary Facility 2011-06-28 Site Restoration No Violations Noted

For data sources see[7]

References

BESbswy