X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24583"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-24583
 
| Well ID: 37-085-24583
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.301261, -80.162108 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.301261, -80.162108 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HAMILTON M 2
 
| Farm/Lease Name: HAMILTON M 2
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2011-03-21
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-02-14
 
| Permit Date: 2011-02-14
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.301261
 
| Latitude: 41.301261
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-02-14
 +
| New Permit Application
 +
|-
 +
| 2011-03-21
 +
| Performed Spud Operation
 +
|-
 +
| 2011-03-31
 +
| Drilling Completion
 +
|-
 +
| 2011-04-11
 +
| Perforation
 +
|-
 +
| 2014-06-20
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 167: Line 208:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 172: Line 214:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-A00
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[VISTA OPR INC]]
| style="text-align: right;" | 2,423.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 740.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[VISTA OPR INC]]
| style="text-align: right;" | 740.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 2,423.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 540.00 Bbl
 
| style="text-align: right;" | 540.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2013-A00
+
| 2013
| Produced Fluid (in Barrels)
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 200 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 200.00 Bbl
 
| style="text-align: right;" | 200.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-A00
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 115.00 Bbl
 
| style="text-align: right;" | 115.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 143.00 Bbl
 
| style="text-align: right;" | 143.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2019
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 62.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-24523
 
|-
 
|-
 
|}
 
|}

Latest revision as of 09:51, 15 May 2020

Well Details

Well ID: 37-085-24583
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Jackson Township
Operator Name: VISTA OPR INC
Well Pad ID:
Farm/Lease Name: HAMILTON M 2
License Status:
Spud Date:
Permit Date: 2011-02-14
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.301261
Longitude: -80.162108

For data sources see[1][2][3]

Well History

Date Event
2011-02-14 New Permit Application
2011-03-21 Performed Spud Operation
2011-03-31 Drilling Completion
2011-04-11 Perforation
2014-06-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 VISTA OPR INC 24,583.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 17,239.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 11,199.00 365 0.00 0 0.00 0
2014 VISTA OPR INC 7,374.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 6,763.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 4,605.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 3,929.00 365 0.00 0 0.00 0
2018 VISTA OPR INC 3,869.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 VISTA OPR INC Produced Fluid 740.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Drilling Fluid Waste 2,423.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 VISTA OPR INC Produced Fluid 540.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 VISTA OPR INC Produced Fluid 200 Bbl CENT WASTE TRT FAC NPDES PA0101508
2013 VISTA OPR INC Produced Fluid 200.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 VISTA OPR INC Produced Fluid 80 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 VISTA OPR INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2015 VISTA OPR INC Produced Fluid 100 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 VISTA OPR INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 VISTA OPR INC Produced Fluid 115.00 Bbl ROAD SPREADING
2017 VISTA OPR INC Produced Fluid 143.00 Bbl ROAD SPREADING
2018 VISTA OPR INC Produced Fluid 45.00 Bbl ROAD SPREADING
2019 VISTA OPR INC Produced Fluid 62.00 Bbl INJECTION DISPOSAL WELL 34-007-24523

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1960289 Primary Facility 2011-03-25 Drilling/Alteration No Violations Noted
1962008 Primary Facility 2011-03-21 Routine/Complete Inspection No Violations Noted
1973155 Primary Facility 2011-05-09 Routine/Complete Inspection No Violations Noted
1987454 Primary Facility 2011-07-13 Routine/Complete Inspection No Violations Noted
2074980 Primary Facility 2012-06-08 Site Restoration No Violations Noted
2629099 Primary Facility 2017-08-25 Routine/Partial Inspection No Violations Noted Annual production report for 2016 shows 4,605.00 Mcf (thousand cubic feet) of gas production. No visible leaks seen at well or dike. API permit no. attached to well.
2715879 Primary Facility 2018-04-09 Routine/Complete Inspection No Violations Noted Routine inspection of producing gas well. Wellhead has rabbit and tag. Tanks and separator in dike. No issues.

For data sources see[7]

References