If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-085-24607 | | Well ID: 37-085-24607 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.426750, -80.002822 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Mercer_County,_Pennsylvania|Mercer]] | ||
+ | |- | ||
+ | | Municipality: [[Mill Creek Township,_Mercer_County,_Pennsylvania|Mill Creek Township]] | ||
|- | |- | ||
| Operator Name: [[VISTA OPR INC]] | | Operator Name: [[VISTA OPR INC]] | ||
|- | |- | ||
− | | | + | | Well Pad ID: |
+ | |- | ||
+ | | Farm/Lease Name: ENGSTROM L UNIT 1 | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2011-08-25 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: N |
|- | |- | ||
− | | Latitude: 41. | + | | Configuration: Vertical Well |
+ | |- | ||
+ | | Conservation: Yes | ||
+ | |- | ||
+ | | Latitude: 41.426750 | ||
|- | |- | ||
| Longitude: -80.002822 | | Longitude: -80.002822 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-08-25 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-02-21 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-02-28 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-03-08 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2012-03-27 | ||
+ | | NEWLY DRILLED | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | | + | | 2011 |
− | | style="text-align:right;" | | + | | [[VISTA OPR INC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 11,315.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | 0.0 | + | | [[VISTA OPR INC]] |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 10,696.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 6,311.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 4,942.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 301.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 3,412.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | | + | | [[VISTA OPR INC]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | + | | style="text-align: right;" | 2,515.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2016 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 40.00 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2017 |
− | | | + | | [[VISTA OPR INC]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 59.00 Bbl |
− | | | + | | ROAD SPREADING |
− | | | + | | |
− | | | + | |- |
− | | | + | | 2019 |
− | | | + | | [[VISTA OPR INC]] |
+ | | Brine Co-Product | ||
+ | | style="text-align: right;" | 40.48 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | + | !scope="col" | Inspection Comments | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
| 2045368 | | 2045368 | ||
+ | | Primary Facility | ||
| 2012-02-23 | | 2012-02-23 | ||
+ | | Drilling/Alteration | ||
| Violation(s) Noted | | Violation(s) Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2046119 | | 2046119 | ||
+ | | Primary Facility | ||
| 2012-02-24 | | 2012-02-24 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2049513 | | 2049513 | ||
+ | | Primary Facility | ||
| 2012-03-09 | | 2012-03-09 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2049614 | | 2049614 | ||
+ | | Primary Facility | ||
| 2012-03-08 | | 2012-03-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2059688 | | 2059688 | ||
+ | | Primary Facility | ||
| 2012-04-12 | | 2012-04-12 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2068307 | | 2068307 | ||
+ | | Primary Facility | ||
| 2012-05-15 | | 2012-05-15 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2094056 | | 2094056 | ||
+ | | Primary Facility | ||
| 2012-08-22 | | 2012-08-22 | ||
+ | | Site Restoration | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | | 2045368 | ||
+ | | 632696 | ||
+ | | 02/23/2012 | ||
+ | | 2012-02-23 | ||
+ | | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | ||
+ | | Administrative | ||
+ | | | ||
+ | |- | ||
+ | | 2045368 | ||
+ | | 633673 | ||
+ | | 02/23/2012 | ||
+ | | 2012-02-23 | ||
+ | | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | ||
+ | | Administrative | ||
+ | | 78.83b(a) The top of cement was not determined after failing to circulate cement to surface while cementing the 11-3/4" surface casing. | ||
+ | |- | ||
+ | |} | ||
+ | ==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | | 632696 | ||
+ | | 281411 | ||
+ | | NOV - Notice of Violation | ||
+ | | Administrative Close Out | ||
| | | | ||
+ | | 2015-08-19 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 633673 | ||
+ | | 281411 | ||
+ | | NOV - Notice of Violation | ||
+ | | Administrative Close Out | ||
+ | | | ||
+ | | 2015-08-19 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-085-24607 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.42675,"lon":-80.002822,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: Mill Creek Township | |
Operator Name: VISTA OPR INC | |
Well Pad ID: | |
Farm/Lease Name: ENGSTROM L UNIT 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-08-25 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.426750 | |
Longitude: -80.002822 |
Date | Event |
---|---|
2011-08-25 | New Permit Application |
2012-02-21 | Performed Spud Operation |
2012-02-28 | Drilling Completion |
2012-03-08 | Perforation |
2012-03-27 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | VISTA OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | VISTA OPR INC | 11,315.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | VISTA OPR INC | 10,696.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | VISTA OPR INC | 6,311.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | VISTA OPR INC | 4,942.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | VISTA OPR INC | 301.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | VISTA OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | VISTA OPR INC | 3,412.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | VISTA OPR INC | Produced Fluid | 2,515.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2016 | VISTA OPR INC | Produced Fluid | 40.00 Bbl | ROAD SPREADING | |
2017 | VISTA OPR INC | Produced Fluid | 59.00 Bbl | ROAD SPREADING | |
2019 | VISTA OPR INC | Brine Co-Product | 40.48 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2045368 | Primary Facility | 2012-02-23 | Drilling/Alteration | Violation(s) Noted | |
2046119 | Primary Facility | 2012-02-24 | Drilling/Alteration | No Violations Noted | |
2049513 | Primary Facility | 2012-03-09 | Drilling/Alteration | No Violations Noted | |
2049614 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | |
2059688 | Primary Facility | 2012-04-12 | Routine/Complete Inspection | No Violations Noted | |
2068307 | Primary Facility | 2012-05-15 | Routine/Complete Inspection | No Violations Noted | |
2094056 | Primary Facility | 2012-08-22 | Site Restoration | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2045368 | 632696 | 02/23/2012 | 2012-02-23 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
2045368 | 633673 | 02/23/2012 | 2012-02-23 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.83b(a) The top of cement was not determined after failing to circulate cement to surface while cementing the 11-3/4" surface casing. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
632696 | 281411 | NOV - Notice of Violation | Administrative Close Out | 2015-08-19 | |||
633673 | 281411 | NOV - Notice of Violation | Administrative Close Out | 2015-08-19 |
For data sources see[7]