If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-24893 | | Well ID: 37-125-24893 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.178894, -79.976183 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | | + | | County: [[Washington_County,_Pennsylvania|Washington]] |
|- | |- | ||
− | | | + | | Municipality: [[Carroll Township,_Washington_County,_Pennsylvania|Carroll Township]] |
+ | |- | ||
+ | | Operator Name: [[EQT PROD CO]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
|- | |- | ||
| Farm/Lease Name: HAROLD HAYWOOD WAS 1H | | Farm/Lease Name: HAROLD HAYWOOD WAS 1H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2012-11-21 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | Well | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: Yes |
|- | |- | ||
| Latitude: 40.178894 | | Latitude: 40.178894 | ||
|- | |- | ||
| Longitude: -79.976183 | | Longitude: -79.976183 | ||
− | |||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Date |
− | !scope="col" | | + | !scope="col" | Event |
− | + | |- | |
− | + | | 2012-11-21 | |
− | + | | New Permit Application | |
− | + | |- | |
− | |||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources |
− | + | | date = 2020-02-27 | |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | accessdate = 2020-02-27 }}</ref> |
− | | accessdate = | + | <!--== Fracking Activities == |
− | == Waste Data == | + | ==== Fracking Jobs ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | + | |- | |
− | + | |}--> | |
− | + | ||
− | |} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | !scope="col" | | + | !scope="col" | Inspection Comments |
− | + | |- | |
+ | | 2395336 | ||
+ | | Primary Facility | ||
+ | | 2015-07-31 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On 7/31/15, I inspected the Harold Haywood site as a routine inspection and made the following observations: | ||
+ | |- | ||
+ | | 2471483 | ||
+ | | Primary Facility | ||
+ | | 2015-12-11 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/11/15, I performed a routine partial inspection of the Harold Haywood Site in response to observed activity on the pad and made the following observations: | ||
+ | |||
+ | |- | ||
+ | | 2549490 | ||
+ | | Primary Facility | ||
+ | | 2016-12-06 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | On 12/6/16, I performed a routine partial inspection of the Harold Haywood in response to observed activity on site and made the following observations: | ||
+ | •A drilling rig was being constructed on site at the time of inspection. | ||
+ | •A large panel had been set on the pad near the juncture of the pad and access road with a chemical container, multiple metal drums, and multiple pieces of oil covered equipment. A small amount of oil had reached the pad surface. The situation was pointed out to site personnel and was then promptly remediated including removal of all visibly impacted pad material. No violation. | ||
+ | •A coil of hose was also found off containment dripping oily material to the pad surface and was promptly removed. No violation. | ||
+ | |- | ||
+ | | 2552985 | ||
+ | | Primary Facility | ||
+ | | 2016-12-16 | ||
+ | | Follow-up Inspection | ||
+ | | No Violations Noted | ||
+ | | On December 16, 2016 I performed a follow up inspection at the Howard Haywood site in response to concerns noted in a previous inspection (ID: 2549486) of the site on 12/6/16 and made the following observations: | ||
+ | •On 12/6/16 multiple issues with containment and minor spills were noted to site personnel and immediately remediated. | ||
+ | •Near the junction of the site access road and the pad a large metal plate had been placed so that it was crushing and compromising the containment around multiple pallets of chemicals marked “AES Drilling Fluids”. Multiple other empty chemical storage containers were also found without any containment. This is a violation of 58 Pa. C.S. § 3218.2(d) for failing to provide containment with at least 110% capacity on regulated substances. | ||
+ | •A spill of more than ten gallons of antifreeze was found off of containment near the drill rig. The situation was immediately communicated to site personnel for remediation. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code | ||
+ | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-125-24893 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.178894,"lon":-79.976183,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Carroll Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: | |
Farm/Lease Name: HAROLD HAYWOOD WAS 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-11-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.178894 | |
Longitude: -79.976183 |
Date | Event |
---|---|
2012-11-21 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2395336 | Primary Facility | 2015-07-31 | Routine/Complete Inspection | No Violations Noted | On 7/31/15, I inspected the Harold Haywood site as a routine inspection and made the following observations: |
2471483 | Primary Facility | 2015-12-11 | Routine/Partial Inspection | No Violations Noted | On 12/11/15, I performed a routine partial inspection of the Harold Haywood Site in response to observed activity on the pad and made the following observations: |
2549490 | Primary Facility | 2016-12-06 | Routine/Partial Inspection | No Violations Noted | On 12/6/16, I performed a routine partial inspection of the Harold Haywood in response to observed activity on site and made the following observations:
•A drilling rig was being constructed on site at the time of inspection. •A large panel had been set on the pad near the juncture of the pad and access road with a chemical container, multiple metal drums, and multiple pieces of oil covered equipment. A small amount of oil had reached the pad surface. The situation was pointed out to site personnel and was then promptly remediated including removal of all visibly impacted pad material. No violation. •A coil of hose was also found off containment dripping oily material to the pad surface and was promptly removed. No violation. |
2552985 | Primary Facility | 2016-12-16 | Follow-up Inspection | No Violations Noted | On December 16, 2016 I performed a follow up inspection at the Howard Haywood site in response to concerns noted in a previous inspection (ID: 2549486) of the site on 12/6/16 and made the following observations:
•On 12/6/16 multiple issues with containment and minor spills were noted to site personnel and immediately remediated. •Near the junction of the site access road and the pad a large metal plate had been placed so that it was crushing and compromising the containment around multiple pallets of chemicals marked “AES Drilling Fluids”. Multiple other empty chemical storage containers were also found without any containment. This is a violation of 58 Pa. C.S. § 3218.2(d) for failing to provide containment with at least 110% capacity on regulated substances. •A spill of more than ten gallons of antifreeze was found off of containment near the drill rig. The situation was immediately communicated to site personnel for remediation. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code |
For data sources see[5]