X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-45918"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-45918
 
| Well ID: 37-121-45918
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.3751, -79.785806 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.3751, -79.785806 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: BELDEN 4934
+
| Farm/Lease Name: BELDEN
 
|-
 
|-
 
| License Status: Active
 
| License Status: Active
Line 24: Line 24:
 
|-
 
|-
 
| Permit Date: 2015-01-20
 
| Permit Date: 2015-01-20
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.3751
 
| Latitude: 41.3751
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-01-20
 +
| New Permit Application
 +
|-
 +
| 2015-09-11
 +
| Performed Spud Operation
 +
|-
 +
| 2015-09-15
 +
| Drilling Completion
 +
|-
 +
| 2016-08-30
 +
| Perforation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2016-08-31
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2017-02-22
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 122:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,300
 +
| style="text-align: right;" | 2,100
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,200
 +
| style="text-align: right;" | 1,000
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 2,900
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,200
 +
| style="text-align: right;" | 1,100
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,200
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2016-08-31
 +
| style="text-align: right;" | 6
 +
| SAND
 +
| style="text-align: right;" | 25,200
 +
| style="text-align: right;" | 1,800
 +
| style="text-align: right;" | 3,400
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 136: Line 242:
 
!scope="col" | Disposal Method
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 133.4 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 133.40 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2,745.00 Bbl
 
| style="text-align: right;" | 2,745.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 146: Line 266:
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 12.22 Bbl
 
| style="text-align: right;" | 12.22 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
Line 153: Line 273:
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 2,745.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 12.22 Bbl
 
| style="text-align: right;" | 12.22 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
Line 160: Line 287:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 2,126.12 Bbl
+
| style="text-align: right;" | 22.00 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| ROAD SPREADING
| PA0101508
+
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 22.00 Bbl
 
| style="text-align: right;" | 22.00 Bbl
 
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
| REUSE AT A CONVENTIONAL WELL SITE IN PA
Line 174: Line 301:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 22.00 Bbl
+
| style="text-align: right;" | 2,126.12 Bbl
| ROAD SPREADING
+
| CENT WASTE TRT FAC NPDES DISCHARGE
|  
+
| PA0101508
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 129.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 11.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2,273.00 Bbl
 
| style="text-align: right;" | 2,273.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 188: Line 329:
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 27.50 Bbl
 
| style="text-align: right;" | 27.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018
+
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 917.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,791.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 22.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2019
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 129.00 Bbl
+
| style="text-align: right;" | 258.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2018
+
| 2019
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 11.00 Bbl
+
| style="text-align: right;" | 33.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENT WASTE TRT FAC NPDES DISCHARGE
| PAS2D215BWAR
+
| 001-A
 
|-
 
|-
 
|}
 
|}

Latest revision as of 11:51, 15 May 2020

Well Details

Well ID: 37-121-45918
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: BELDEN
License Status: Active
Spud Date: 2015-09-11
Permit Date: 2015-01-20
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.3751
Longitude: -79.785806

For data sources see[1][2][3]

Well History

Date Event
2015-01-20 New Permit Application
2015-09-11 Performed Spud Operation
2015-09-15 Drilling Completion
2016-08-30 Perforation
2016-08-31 Performed Stage 1 of Stimulation
2016-08-31 Performed Stage 2 of Stimulation
2016-08-31 Performed Stage 3 of Stimulation
2016-08-31 Performed Stage 4 of Stimulation
2016-08-31 Performed Stage 5 of Stimulation
2016-08-31 Performed Stage 6 of Stimulation
2017-02-22 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-08-31 1 SAND 25,200 1,300 2,100
2016-08-31 2 SAND 25,200 1,200 1,000
2016-08-31 3 SAND 25,200 1,500 2,900
2016-08-31 4 SAND 25,200 1,200 1,100
2016-08-31 5 SAND 25,200 1,200 4,000
2016-08-31 6 SAND 25,200 1,800 3,400

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 13.51 50 0.00 0
2016 CATALYST ENERGY INC 0.00 0 328.25 122 0.00 0
2017 CATALYST ENERGY INC 0.00 0 356.06 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 493.46 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CATALYST ENERGY INC Produced Fluid 133.4 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 133.40 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,745.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 12.22 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 2,745.00 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 12.22 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 22.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 22.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 2,126.12 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 129.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 2,273.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 917.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 1,791.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 22.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 258.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 33.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2399070 Primary Facility 2015-08-11 Routine/Complete Inspection No Violations Noted
2406277 Primary Facility 2015-09-11 Drilling/Alteration No Violations Noted
2406356 Primary Facility 2015-09-11 Routine/Complete Inspection No Violations Noted
2406783 Primary Facility 2015-09-15 Drilling/Alteration No Violations Noted
2408175 Primary Facility 2015-09-17 Routine/Complete Inspection No Violations Noted
2413535 Primary Facility 2015-10-06 Routine/Complete Inspection No Violations Noted
2413760 Primary Facility 2015-10-08 Administrative/File Review No Violations Noted
2495842 Primary Facility 2016-06-22 Routine/Complete Inspection No Violations Noted
2515384 Primary Facility 2016-08-31 Drilling/Alteration No Violations Noted
2516243 Primary Facility 2016-08-30 Routine/Complete Inspection No Violations Noted
2517819 Primary Facility 2016-09-07 Routine/Complete Inspection No Violations Noted
2520136 Primary Facility 2016-09-20 Administrative/File Review No Violations Noted
2534341 Primary Facility 2016-10-31 Routine/Complete Inspection No Violations Noted
2649498 Primary Facility 2017-10-19 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. The site is considered restored.
2737421 Primary Facility 2018-05-30 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues.

For data sources see[8]

References