X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-46042"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-46042
 
| Well ID: 37-121-46042
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.399906, -79.772611 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.399906, -79.772611 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/15/2016
+
| Spud Date: 2016-08-15
 
|-
 
|-
| Permit Date: 9/18/2015
+
| Permit Date: 2015-09-18
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.399906
 
| Latitude: 41.399906
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-09-18
 +
| New Permit Application
 +
|-
 +
| 2016-08-15
 +
| Performed Spud Operation
 +
|-
 +
| 2016-08-16
 +
| Drilling Completion
 +
|-
 +
| 2016-08-29
 +
| Perforation
 +
|-
 +
| 2016-08-30
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2016-08-30
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2016-08-30
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2016-08-30
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2016-08-30
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2017-02-22
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2016-08-30
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 21,588
 +
| style="text-align: right;" | 2,500
 +
| style="text-align: right;" | 2,500
 +
|-
 +
| 2016-08-30
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 21,588
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 500
 +
|-
 +
| 2016-08-30
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 21,588
 +
| style="text-align: right;" | 1,600
 +
| style="text-align: right;" | 3,800
 +
|-
 +
| 2016-08-30
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 21,588
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 700
 +
|-
 +
| 2016-08-30
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 21,588
 +
| style="text-align: right;" | 1,600
 +
| style="text-align: right;" | 2,800
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 184:
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 385.52
 
| style="text-align: right;" | 385.52
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 361.92
 
| style="text-align: right;" | 361.92
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 217.60
 
| style="text-align: right;" | 217.60
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 97: Line 218:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 102: Line 224:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 653.33 Bbl
 
| style="text-align: right;" | 653.33 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 33.33 Bbl
 
| style="text-align: right;" | 33.33 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 1,509.05 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| style="text-align: right;" | 653.33 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 33.33 Bbl
 
| style="text-align: right;" | 33.33 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,509.05 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,056.67 Bbl
 
| style="text-align: right;" | 1,056.67 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 273.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 568.33 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 73.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 36.67 Bbl
 
| style="text-align: right;" | 36.67 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 311: Line 474:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 13:03, 15 May 2020

Well Details

Well ID: 37-121-46042
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: TAYLOR 5062
License Status: Active
Spud Date: 2016-08-15
Permit Date: 2015-09-18
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.399906
Longitude: -79.772611

For data sources see[1][2][3]

Well History

Date Event
2015-09-18 New Permit Application
2016-08-15 Performed Spud Operation
2016-08-16 Drilling Completion
2016-08-29 Perforation
2016-08-30 Performed Stage 1 of Stimulation
2016-08-30 Performed Stage 2 of Stimulation
2016-08-30 Performed Stage 3 of Stimulation
2016-08-30 Performed Stage 4 of Stimulation
2016-08-30 Performed Stage 5 of Stimulation
2017-02-22 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-08-30 1 SAND 21,588 2,500 2,500
2016-08-30 2 SAND 21,588 2,000 500
2016-08-30 3 SAND 21,588 1,600 3,800
2016-08-30 4 SAND 21,588 1,500 700
2016-08-30 5 SAND 21,588 1,600 2,800

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CATALYST ENERGY INC 0.00 0 385.52 122 0.00 0
2017 CATALYST ENERGY INC 0.00 0 361.92 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 217.60 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 653.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 33.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 653.33 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 CATALYST ENERGY INC Produced Fluid 33.33 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 1,509.05 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 36.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 1,056.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 273.33 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 568.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 73.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 36.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2501338 Primary Facility 2016-07-15 Administrative/File Review No Violations Noted
2506006 Primary Facility 2016-07-25 Routine/Complete Inspection No Violations Noted
2506011 Primary Facility 2016-07-28 Routine/Complete Inspection No Violations Noted
2510755 Primary Facility 2016-08-15 Drilling/Alteration No Violations Noted
2512085 Primary Facility 2016-08-15 Routine/Complete Inspection No Violations Noted
2512089 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted
2512098 Primary Facility 2016-08-17 Routine/Complete Inspection No Violations Noted
2516249 Primary Facility 2016-08-30 Routine/Complete Inspection No Violations Noted
2517829 Primary Facility 2016-09-09 Routine/Complete Inspection No Violations Noted
2520159 Primary Facility 2016-09-20 Administrative/File Review No Violations Noted
2528606 Primary Facility 2016-10-13 Routine/Complete Inspection No Violations Noted
2537868 Primary Facility 2016-11-09 Routine/Complete Inspection No Violations Noted
2541106 Primary Facility 2016-11-30 Site Restoration No Violations Noted
2552148 Primary Facility 2017-01-12 Routine/Partial Inspection No Violations Noted
2557596 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted
2597399 Primary Facility 2017-05-18 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There is a 50 bbl. poly tank onsite that is diked. The site is stable with greater than 70% vegetative cover. There are areas within the lease that do not have vegetation established. Steps should be taken to permanently stabilize the area. Also the borrow pit that was used when constructing the site remains open and needs restored.
2627215 Primary Facility 2017-08-16 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored.
2731876 Primary Facility 2018-05-18 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues.

For data sources see[8]

References