If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-121-46043 | | Well ID: 37-121-46043 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.400278, -79.773656 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 24: | Line 24: | ||
|- | |- | ||
| Permit Date: 2015-09-18 | | Permit Date: 2015-09-18 | ||
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.400278 | | Latitude: 41.400278 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2015-09-18 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2016-08-17 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2016-08-18 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2016-12-12 | ||
+ | | Newly Drilled | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 74: | Line 116: | ||
|}--> | |}--> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 1,500 | ||
+ | | style="text-align: right;" | 4,500 | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 1,400 | ||
+ | | style="text-align: right;" | 1,600 | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 1,400 | ||
+ | | style="text-align: right;" | 1,400 | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 1,400 | ||
+ | | style="text-align: right;" | 1,600 | ||
+ | |- | ||
+ | | 2016-09-08 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | SAND | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 1,600 | ||
+ | | style="text-align: right;" | 2,500 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 122: | Line 215: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 127: | Line 221: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 653.33 Bbl | | style="text-align: right;" | 653.33 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 33.33 Bbl | | style="text-align: right;" | 33.33 Bbl | ||
| STORAGE PENDING DISPOSAL OR REUSE | | STORAGE PENDING DISPOSAL OR REUSE | ||
| | | | ||
|- | |- | ||
− | | | + | | 2016 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | CENT WASTE TRT FAC NPDES | + | | style="text-align: right;" | 653.33 Bbl |
+ | | CENT WASTE TRT FAC NPDES | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 33.33 Bbl | | style="text-align: right;" | 33.33 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2018- | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,509.05 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 36.67 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 1,056.67 Bbl | | style="text-align: right;" | 1,056.67 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 273.33 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-24079 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 568.33 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 73.33 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | PAS2D215BWAR | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 36.67 Bbl | | style="text-align: right;" | 36.67 Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT |
Well ID: 37-121-46043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.400278,"lon":-79.773656,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: TAYLOR 5063 | |
License Status: Active | |
Spud Date: 2016-08-17 | |
Permit Date: 2015-09-18 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.400278 | |
Longitude: -79.773656 |
Date | Event |
---|---|
2015-09-18 | New Permit Application |
2016-08-17 | Performed Spud Operation |
2016-08-18 | Drilling Completion |
2016-09-08 | Performed Stage 1 of Stimulation |
2016-09-08 | Performed Stage 2 of Stimulation |
2016-09-08 | Performed Stage 3 of Stimulation |
2016-09-08 | Performed Stage 4 of Stimulation |
2016-09-08 | Performed Stage 5 of Stimulation |
2016-12-12 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-09-08 | 1 | SAND | 0 | 1,500 | 4,500 |
2016-09-08 | 2 | SAND | 0 | 1,400 | 1,600 |
2016-09-08 | 3 | SAND | 0 | 1,400 | 1,400 |
2016-09-08 | 4 | SAND | 0 | 1,400 | 1,600 |
2016-09-08 | 5 | SAND | 0 | 1,600 | 2,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | 0.00 | 0 | 385.52 | 122 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 361.92 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 217.60 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 653.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 33.33 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 653.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 33.33 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,509.05 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,056.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 273.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 568.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 73.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2501336 | Primary Facility | 2016-07-15 | Administrative/File Review | No Violations Noted | |
2503672 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | |
2508161 | Primary Facility | 2016-08-01 | Routine/Complete Inspection | No Violations Noted | |
2511218 | Primary Facility | 2016-08-17 | Drilling/Alteration | No Violations Noted | |
2512096 | Primary Facility | 2016-08-17 | Routine/Complete Inspection | No Violations Noted | |
2512107 | Primary Facility | 2016-08-18 | Routine/Complete Inspection | No Violations Noted | |
2514091 | Primary Facility | 2016-08-26 | Routine/Complete Inspection | No Violations Noted | |
2517135 | Primary Facility | 2016-09-07 | Drilling/Alteration | No Violations Noted | |
2517820 | Primary Facility | 2016-09-07 | Routine/Complete Inspection | No Violations Noted | |
2517824 | Primary Facility | 2016-09-08 | Routine/Complete Inspection | No Violations Noted | |
2517830 | Primary Facility | 2016-09-09 | Routine/Complete Inspection | No Violations Noted | |
2520158 | Primary Facility | 2016-09-20 | Administrative/File Review | No Violations Noted | |
2524171 | Primary Facility | 2016-09-26 | Routine/Complete Inspection | No Violations Noted | |
2534342 | Primary Facility | 2016-11-01 | Routine/Complete Inspection | No Violations Noted | |
2539530 | Primary Facility | 2016-11-21 | Routine/Complete Inspection | No Violations Noted | |
2541105 | Primary Facility | 2016-11-30 | Routine/Complete Inspection | No Violations Noted | |
2550241 | Primary Facility | 2017-01-05 | Routine/Complete Inspection | No Violations Noted | |
2552150 | Primary Facility | 2017-01-12 | Routine/Partial Inspection | No Violations Noted | |
2552475 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | |
2560793 | Primary Facility | 2017-02-09 | Routine/Complete Inspection | No Violations Noted | |
2608251 | Primary Facility | 2017-06-27 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There is a left over spool of flow line onsite that should be removed. The stone pit that was used for construction remains open and is not stable. Steps should be taken stabilize the site. |
2618935 | Primary Facility | 2017-07-25 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection the well is producing, labeled, and the annulus is vented. The stone pit has been reclaimed and mulched. There are no E&S issues. |
2627211 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored. |
2654226 | Primary Facility | 2017-10-26 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, labeled, and the annulus is vented. The area of the stone pit has been reclaimed. There are large areas that do not have vegetative cover. Additional steps will be needed to stabilize the site. |
2666475 | Primary Facility | 2017-11-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. The dike appears to be in good shape housing two 210 bbl. oil tanks and two 100 bbl. brine tanks. There is a spool and left over flowline onsite that should be removed. |
2796195 | Primary Facility | 2018-10-29 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues. |
2832541 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and stable. There are no E&S issues. The tank battery appears in good shape housing two 210 bbl. oil tanks, one 100 bbl. steel and 100 bbl. poly brine tanks. |
For data sources see[8]