X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-46043"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-46043
 
| Well ID: 37-121-46043
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.400278, -79.773656 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.400278, -79.773656 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 24: Line 24:
 
|-
 
|-
 
| Permit Date: 2015-09-18
 
| Permit Date: 2015-09-18
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.400278
 
| Latitude: 41.400278
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-09-18
 +
| New Permit Application
 +
|-
 +
| 2016-08-17
 +
| Performed Spud Operation
 +
|-
 +
| 2016-08-18
 +
| Drilling Completion
 +
|-
 +
| 2016-09-08
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2016-09-08
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2016-09-08
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2016-09-08
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2016-09-08
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2016-12-12
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 116:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2016-09-08
 +
| style="text-align: right;" | 1
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 4,500
 +
|-
 +
| 2016-09-08
 +
| style="text-align: right;" | 2
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,400
 +
| style="text-align: right;" | 1,600
 +
|-
 +
| 2016-09-08
 +
| style="text-align: right;" | 3
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,400
 +
| style="text-align: right;" | 1,400
 +
|-
 +
| 2016-09-08
 +
| style="text-align: right;" | 4
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,400
 +
| style="text-align: right;" | 1,600
 +
|-
 +
| 2016-09-08
 +
| style="text-align: right;" | 5
 +
| SAND
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,600
 +
| style="text-align: right;" | 2,500
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 122: Line 215:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 127: Line 221:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2016-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 653.33 Bbl
 
| style="text-align: right;" | 653.33 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 33.33 Bbl
 
| style="text-align: right;" | 33.33 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
| 2017-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 1,509.05 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| style="text-align: right;" | 653.33 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 33.33 Bbl
 
| style="text-align: right;" | 33.33 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,509.05 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,056.67 Bbl
 
| style="text-align: right;" | 1,056.67 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-A00
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 273.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 568.33 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 73.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 36.67 Bbl
 
| style="text-align: right;" | 36.67 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 12:03, 15 May 2020

Well Details

Well ID: 37-121-46043
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: TAYLOR 5063
License Status: Active
Spud Date: 2016-08-17
Permit Date: 2015-09-18
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.400278
Longitude: -79.773656

For data sources see[1][2][3]

Well History

Date Event
2015-09-18 New Permit Application
2016-08-17 Performed Spud Operation
2016-08-18 Drilling Completion
2016-09-08 Performed Stage 1 of Stimulation
2016-09-08 Performed Stage 2 of Stimulation
2016-09-08 Performed Stage 3 of Stimulation
2016-09-08 Performed Stage 4 of Stimulation
2016-09-08 Performed Stage 5 of Stimulation
2016-12-12 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-09-08 1 SAND 0 1,500 4,500
2016-09-08 2 SAND 0 1,400 1,600
2016-09-08 3 SAND 0 1,400 1,400
2016-09-08 4 SAND 0 1,400 1,600
2016-09-08 5 SAND 0 1,600 2,500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CATALYST ENERGY INC 0.00 0 385.52 122 0.00 0
2017 CATALYST ENERGY INC 0.00 0 361.92 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 217.60 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 653.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 33.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 653.33 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 CATALYST ENERGY INC Produced Fluid 33.33 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 1,509.05 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 36.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 1,056.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 273.33 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 568.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 73.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 36.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2501336 Primary Facility 2016-07-15 Administrative/File Review No Violations Noted
2503672 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted
2508161 Primary Facility 2016-08-01 Routine/Complete Inspection No Violations Noted
2511218 Primary Facility 2016-08-17 Drilling/Alteration No Violations Noted
2512096 Primary Facility 2016-08-17 Routine/Complete Inspection No Violations Noted
2512107 Primary Facility 2016-08-18 Routine/Complete Inspection No Violations Noted
2514091 Primary Facility 2016-08-26 Routine/Complete Inspection No Violations Noted
2517135 Primary Facility 2016-09-07 Drilling/Alteration No Violations Noted
2517820 Primary Facility 2016-09-07 Routine/Complete Inspection No Violations Noted
2517824 Primary Facility 2016-09-08 Routine/Complete Inspection No Violations Noted
2517830 Primary Facility 2016-09-09 Routine/Complete Inspection No Violations Noted
2520158 Primary Facility 2016-09-20 Administrative/File Review No Violations Noted
2524171 Primary Facility 2016-09-26 Routine/Complete Inspection No Violations Noted
2534342 Primary Facility 2016-11-01 Routine/Complete Inspection No Violations Noted
2539530 Primary Facility 2016-11-21 Routine/Complete Inspection No Violations Noted
2541105 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted
2550241 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted
2552150 Primary Facility 2017-01-12 Routine/Partial Inspection No Violations Noted
2552475 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted
2560793 Primary Facility 2017-02-09 Routine/Complete Inspection No Violations Noted
2608251 Primary Facility 2017-06-27 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There is a left over spool of flow line onsite that should be removed. The stone pit that was used for construction remains open and is not stable. Steps should be taken stabilize the site.
2618935 Primary Facility 2017-07-25 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection the well is producing, labeled, and the annulus is vented. The stone pit has been reclaimed and mulched. There are no E&S issues.
2627211 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored.
2654226 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well appears to have recently produced, labeled, and the annulus is vented. The area of the stone pit has been reclaimed. There are large areas that do not have vegetative cover. Additional steps will be needed to stabilize the site.
2666475 Primary Facility 2017-11-30 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. The dike appears to be in good shape housing two 210 bbl. oil tanks and two 100 bbl. brine tanks. There is a spool and left over flowline onsite that should be removed.
2796195 Primary Facility 2018-10-29 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues.
2832541 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and stable. There are no E&S issues. The tank battery appears in good shape housing two 210 bbl. oil tanks, one 100 bbl. steel and 100 bbl. poly brine tanks.

For data sources see[8]

References