If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-121-46142 | | Well ID: 37-121-46142 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.383711, -79.773519 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: DEEP HOLLOW LOT 82 | + | | Farm/Lease Name: DEEP HOLLOW LOT 82 |
|- | |- | ||
| License Status: Active | | License Status: Active | ||
Line 24: | Line 24: | ||
|- | |- | ||
| Permit Date: 2017-03-09 | | Permit Date: 2017-03-09 | ||
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.383711 | | Latitude: 41.383711 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2017-03-09 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2017-07-06 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2017-07-07 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2019-06-03 | ||
+ | | Newly Drilled | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 74: | Line 122: | ||
|}--> | |}--> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 1,250 | ||
+ | | style="text-align: right;" | 2,700 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 1,700 | ||
+ | | style="text-align: right;" | 3,000 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 2,700 | ||
+ | | style="text-align: right;" | 4,000 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 2,000 | ||
+ | | style="text-align: right;" | 3,200 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 2,000 | ||
+ | | style="text-align: right;" | 2,900 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 2,200 | ||
+ | | style="text-align: right;" | 2,700 | ||
+ | |- | ||
+ | | 2017-08-01 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | Sand | ||
+ | | style="text-align: right;" | 34,776 | ||
+ | | style="text-align: right;" | 2,200 | ||
+ | | style="text-align: right;" | 3,400 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 113: | Line 226: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 118: | Line 232: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 31.43 Bbl |
− | | | + | | ROAD SPREADING |
+ | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 9.29 Bbl | | style="text-align: right;" | 9.29 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2017- | + | | 2017 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 140.00 Bbl | ||
+ | | REUSE AT A CONVENTIONAL WELL SITE IN PA | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,768.95 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 274.29 Bbl | | style="text-align: right;" | 274.29 Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
| PA0023213 | | PA0023213 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 52.86 Bbl | | style="text-align: right;" | 52.86 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 523.57 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
+ | | 34-155-24079 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 167.86 Bbl | ||
+ | | PUBLIC SEWAGE TREATMENT PLANT | ||
+ | | PA0023213 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 1,017.38 Bbl | | style="text-align: right;" | 1,017.38 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 15.71 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | PAS2D215BWAR |
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 15.71 Bbl | | style="text-align: right;" | 15.71 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 62.86 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,102.86 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0101508 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 358.57 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-155-24079 |
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 31.43 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | BT-008 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 198.57 Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
| PA0023213 | | PA0023213 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | Produced Fluid | + | | [[CATALYST ENERGY INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 94.29 Bbl |
− | | | + | | CENT WASTE TRT FAC NPDES DISCHARGE |
+ | | 001-A | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 125.71 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | PAS2D215BWAR | ||
|- | |- | ||
|} | |} |
Well ID: 37-121-46142 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.383711,"lon":-79.773519,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Franklin City | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW LOT 82 | |
License Status: Active | |
Spud Date: 2017-07-06 | |
Permit Date: 2017-03-09 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.383711 | |
Longitude: -79.773519 |
Date | Event |
---|---|
2017-03-09 | New Permit Application |
2017-07-06 | Performed Spud Operation |
2017-07-07 | Drilling Completion |
2017-08-01 | Performed Stage 1 of Stimulation |
2017-08-01 | Performed Stage 2 of Stimulation |
2017-08-01 | Performed Stage 3 of Stimulation |
2017-08-01 | Performed Stage 4 of Stimulation |
2017-08-01 | Performed Stage 5 of Stimulation |
2017-08-01 | Performed Stage 6 of Stimulation |
2017-08-01 | Performed Stage 7 of Stimulation |
2019-06-03 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-08-01 | 1 | Sand | 34,776 | 1,250 | 2,700 |
2017-08-01 | 2 | Sand | 34,776 | 1,700 | 3,000 |
2017-08-01 | 3 | Sand | 34,776 | 2,700 | 4,000 |
2017-08-01 | 4 | Sand | 34,776 | 2,000 | 3,200 |
2017-08-01 | 5 | Sand | 34,776 | 2,000 | 2,900 |
2017-08-01 | 6 | Sand | 34,776 | 2,200 | 2,700 |
2017-08-01 | 7 | Sand | 34,776 | 2,200 | 3,400 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CATALYST ENERGY INC | Produced Fluid | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,102.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 358.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 198.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 94.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 125.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2600602 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2600604 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2600605 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2603569 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
2606056 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606060 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606062 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606063 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2612644 | Primary Facility | 2017-07-06 | Drilling/Alteration | No Violations Noted | |
2613789 | Primary Facility | 2017-07-06 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The rig is currently shut down waiting to cement the casing. The pit is lined with greater than two feet of freeboard. The site is stable, there are no E&S issues. |
2613793 | Primary Facility | 2017-07-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues. |
2616683 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit lined with greater than two feet of freeboard. The site has been mulched and is stable. There are no E&S issues. |
2621596 | Primary Facility | 2017-08-01 | Drilling/Alteration | No Violations Noted | |
2623607 | Primary Facility | 2017-07-31 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently setting up to notch the well. A pit is not being utilized containment is setup. There are no E&S issues. |
2623672 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has been graded and mulched. There are no E&S issues. |
2627700 | Primary Facility | 2017-08-22 | Administrative/File Review | No Violations Noted | |
2678127 | Primary Facility | 2018-01-03 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere. |
2729839 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Vegetation is established onsite. There are no E&S issues. |
For data sources see[8]