X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-46142"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-46142
 
| Well ID: 37-121-46142
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.383711, -79.773519 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.383711, -79.773519 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: DEEP HOLLOW LOT 82 3491
+
| Farm/Lease Name: DEEP HOLLOW LOT 82
 
|-
 
|-
 
| License Status: Active
 
| License Status: Active
Line 24: Line 24:
 
|-
 
|-
 
| Permit Date: 2017-03-09
 
| Permit Date: 2017-03-09
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.383711
 
| Latitude: 41.383711
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2017-03-09
 +
| New Permit Application
 +
|-
 +
| 2017-07-06
 +
| Performed Spud Operation
 +
|-
 +
| 2017-07-07
 +
| Drilling Completion
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2017-08-01
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2019-06-03
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 122:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 1
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 1,250
 +
| style="text-align: right;" | 2,700
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 2
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 1,700
 +
| style="text-align: right;" | 3,000
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 3
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 2,700
 +
| style="text-align: right;" | 4,000
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 4
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 3,200
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 5
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 2,900
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 6
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 2,700
 +
|-
 +
| 2017-08-01
 +
| style="text-align: right;" | 7
 +
| Sand
 +
| style="text-align: right;" | 34,776
 +
| style="text-align: right;" | 2,200
 +
| style="text-align: right;" | 3,400
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 121: Line 234:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,768.95 Bbl
+
| style="text-align: right;" | 31.43 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| ROAD SPREADING
| PA0101508
+
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 9.29 Bbl
 
| style="text-align: right;" | 9.29 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 135: Line 248:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 52.86 Bbl
+
| style="text-align: right;" | 140.00 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|  
 
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 31.43 Bbl
+
| style="text-align: right;" | 1,768.95 Bbl
| ROAD SPREADING
+
| CENT WASTE TRT FAC NPDES DISCHARGE
|  
+
| PA0101508
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 274.29 Bbl
 
| style="text-align: right;" | 274.29 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 156: Line 269:
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 140.00 Bbl
+
| style="text-align: right;" | 52.86 Bbl
| REUSE AT A CONVENTIONAL WELL SITE IN PA
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 523.57 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 167.86 Bbl
 
| style="text-align: right;" | 167.86 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 170: Line 290:
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,017.38 Bbl
 
| style="text-align: right;" | 1,017.38 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 177: Line 297:
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 15.71 Bbl
 
| style="text-align: right;" | 15.71 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 184: Line 304:
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 15.71 Bbl
 
| style="text-align: right;" | 15.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018
+
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 62.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,102.86 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 523.57 Bbl
+
| style="text-align: right;" | 358.57 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.43 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| BT-008
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 198.57 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 94.29 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| 001-A
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 125.71 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 
|-
 
|-
 
|}
 
|}

Latest revision as of 12:13, 15 May 2020

Well Details

Well ID: 37-121-46142
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Franklin City
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW LOT 82
License Status: Active
Spud Date: 2017-07-06
Permit Date: 2017-03-09
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.383711
Longitude: -79.773519

For data sources see[1][2][3]

Well History

Date Event
2017-03-09 New Permit Application
2017-07-06 Performed Spud Operation
2017-07-07 Drilling Completion
2017-08-01 Performed Stage 1 of Stimulation
2017-08-01 Performed Stage 2 of Stimulation
2017-08-01 Performed Stage 3 of Stimulation
2017-08-01 Performed Stage 4 of Stimulation
2017-08-01 Performed Stage 5 of Stimulation
2017-08-01 Performed Stage 6 of Stimulation
2017-08-01 Performed Stage 7 of Stimulation
2019-06-03 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2017-08-01 1 Sand 34,776 1,250 2,700
2017-08-01 2 Sand 34,776 1,700 3,000
2017-08-01 3 Sand 34,776 2,700 4,000
2017-08-01 4 Sand 34,776 2,000 3,200
2017-08-01 5 Sand 34,776 2,000 2,900
2017-08-01 6 Sand 34,776 2,200 2,700
2017-08-01 7 Sand 34,776 2,200 3,400

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CATALYST ENERGY INC 0.00 0 451.24 150 0.00 0
2018 CATALYST ENERGY INC 0.00 0 42.52 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CATALYST ENERGY INC Produced Fluid 31.43 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 9.29 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017 CATALYST ENERGY INC Produced Fluid 140.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 1,768.95 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 CATALYST ENERGY INC Produced Fluid 274.29 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 52.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CATALYST ENERGY INC Produced Fluid 523.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid 167.86 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 1,017.38 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 15.71 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 62.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 1,102.86 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 358.57 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 31.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 198.57 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 94.29 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 CATALYST ENERGY INC Produced Fluid 125.71 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2600602 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2600604 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2600605 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation.
2603569 Primary Facility 2017-06-12 Routine/Partial Inspection No Violations Noted
2606056 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606060 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606062 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2606063 Primary Facility 2017-06-19 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site.
2612644 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted
2613789 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The rig is currently shut down waiting to cement the casing. The pit is lined with greater than two feet of freeboard. The site is stable, there are no E&S issues.
2613793 Primary Facility 2017-07-10 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues.
2616683 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is drilled, pit lined with greater than two feet of freeboard. The site has been mulched and is stable. There are no E&S issues.
2621596 Primary Facility 2017-08-01 Drilling/Alteration No Violations Noted
2623607 Primary Facility 2017-07-31 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. Currently setting up to notch the well. A pit is not being utilized containment is setup. There are no E&S issues.
2623672 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has been graded and mulched. There are no E&S issues.
2627700 Primary Facility 2017-08-22 Administrative/File Review No Violations Noted
2678127 Primary Facility 2018-01-03 Routine/Partial Inspection No Violations Noted Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere.
2729839 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Vegetation is established onsite. There are no E&S issues.

For data sources see[8]

References