X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-28538"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-28538
 
| Well ID: 37-125-28538
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.975797, -80.424075 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.975797, -80.424075 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: CONSOL MOR44GHS
 
| Farm/Lease Name: CONSOL MOR44GHS
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2018-11-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2018-03-14
 
| Permit Date: 2018-03-14
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.975797
 
| Latitude: 39.975797
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-03-14
 +
| New Permit Application
 +
|-
 +
| 2018-06-12
 +
| MOD
 +
|-
 +
| 2018-11-01
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 86:
 
| 2019-03-06
 
| 2019-03-06
 
| 2019-03-25
 
| 2019-03-25
| style="text-align: right;" | 7114
+
| style="text-align: right;" | 7,114
| style="text-align: right;" | 13,990,500.0
+
| style="text-align: right;" | 13,990,500
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 388: Line 412:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 401: Line 436:
 
| 2019
 
| 2019
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 4,016,792.18
| style="text-align: right;" | 0
+
| style="text-align: right;" | 275
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 418: Line 453:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 423: Line 459:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-M11
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 50.00 Bbl
+
| Drill Cuttings
 +
| style="text-align: right;" | 472.09 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2018
 +
| [[CNX GAS CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 598.90 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M11
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 5.00 Bbl
+
| Drilling Fluid Waste
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 223.00 Bbl
| ODNR 2015-29
+
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-17
 +
|-
 +
| 2018
 +
| [[CNX GAS CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,263.75 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2018
 +
| [[CNX GAS CO LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 150.83 Tons
 +
| LANDFILL
 +
| 06-08438
 
|-
 
|-
| 2018-M11
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 97.50 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 163.75 Bbl
| ORDER 2016-29
+
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 
|-
 
|-
| 2018-M11
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 98.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 2,024.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M11
+
| 2018
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 81.75 Bbl
+
| Other Oil & Gas Wastes
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 153.75 Bbl
|
 
|-
 
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 70.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M11
+
| 2018
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 46.00 Bbl
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 281.25 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| ORDER 2016-29
 
|-
 
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 23.75 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
 
|  
 
|  
 
|-
 
|-
| 2018-M11
+
| 2018
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 20.00 Bbl
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 67.50 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M11
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 1,054.25 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 796.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-17
 
|-
 
|-
| 2018-M11
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 163.75 Bbl
+
| Other Oil & Gas Wastes
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 23.75 Bbl
| 95-7-37312-21
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|  
 
|-
 
|-
| 2018-M12
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 150.83 Tons
+
| Drill Cuttings
| LANDFILL
 
| 06-08438
 
|-
 
| 2018-M12
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 472.09 Tons
 
| LANDFILL
 
| 100172
 
|-
 
| 2018-M12
 
| Drill Cuttings (in Tons) RWC 810
 
 
| style="text-align: right;" | 60.95 Tons
 
| style="text-align: right;" | 60.95 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2018-M12
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 548.90 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 191.25 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ORDER 2016-29
 
|-
 
|-
| 2018-M12
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 155.00 Bbl
+
| Other Oil & Gas Wastes
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 60.75 Bbl
| ODNR 2015-29
 
|-
 
| 2018-M12
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 93.75 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2018-M12
+
| 2018
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 223.00 Bbl
+
| Drilling Fluid Waste
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 160.00 Bbl
| 95-7-37312-17
 
|-
 
| 2018-M12
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 1,165.75 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M12
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 199.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|
 
|-
 
| 2018-M12
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 83.75 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M12
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 14.75 Bbl
+
| Soil Contaminated by Oil
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 219.39 Tons
| ORDER 2016-29
+
| LANDFILL
 +
| CID # 28726
 
|-
 
|-
| 2018-M12
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 47.50 Bbl
+
| Drilling Fluid Waste
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 17.50 Bbl
| 95-7-37312-19
+
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
| 2018-M12
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 796.00 Bbl
+
| Produced Fluid
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 4,655.75 Bbl
| 95-7-37312-17
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 969.75 Bbl
 
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 140.88 Tons
 
| style="text-align: right;" | 140.88 Tons
 
| LANDFILL
 
| LANDFILL
 
| 06-08438
 
| 06-08438
 
|-
 
|-
| 2019-M01
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 426.59 Tons
+
| Produced Fluid
| LANDFILL
+
| style="text-align: right;" | 2.50 Bbl
| 100172
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 12.50 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 42.85 Tons
+
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 219.39 Tons
 
| LANDFILL
 
| LANDFILL
| 100663
+
| CID # 28726
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 19.50 Bbl
+
| Other Oil & Gas Wastes
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 80.00 Bbl
| ORDER 2016-415
 
|-
 
| 2019-M01
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 501.25 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 58.75 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 4,741.25 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 61.25 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 73.75 Bbl
+
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 26.46 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 25.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 70.00 Bbl
+
| Drill Cuttings
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 426.59 Tons
|  
+
| LANDFILL
 +
| 100172
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 508.75 Bbl
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 27.50 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 12.50 Bbl
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 171.50 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 5.00 Bbl
+
| Synthetic Liner Materials
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 1.92 Tons
|  
+
| LANDFILL
 +
| 100663
 
|-
 
|-
| 2019-M01
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 20.00 Bbl
+
| Produced Fluid
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| style="text-align: right;" | 1,667.50 Bbl
|
 
|-
 
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 16.25 Bbl
 
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-17
 
|-
 
|-
| 2019-M01
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CNX GAS CO LLC]]
 +
| Synthetic Liner Materials
 
| style="text-align: right;" | 7.55 Tons
 
| style="text-align: right;" | 7.55 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
 
|-
 
|-
| 2019-M01
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 1.92 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ORDER 2016-29
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 19.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| ORDER 2016-415
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 42.85 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 399.00 Bbl
+
| Produced Fluid
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 3,073.00 Bbl
| 95-7-37312-17
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.22 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 9,351.59 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 566.75 Bbl
+
| Produced Fluid
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 155.00 Bbl
| 95-7-37312-19
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| PAD085690592
 
|-
 
|-
| 2019-M03
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 51.25 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 84.73 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 20.00 Bbl
+
| Produced Fluid
| SURFACE IMPOUNDMENT
+
| style="text-align: right;" | 9,618.25 Bbl
| 95-7-37312-19
+
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
| 2019-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 75.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 512.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 2.50 Bbl
+
| Other Oil & Gas Wastes
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 30.75 Bbl
| ODNR 2015-29
+
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 +
|-
 +
| 2019
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 11,714.25 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|  
 
|-
 
|-
| 2019-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 25.00 Bbl
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 151.25 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2019-M03
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 28.00 Bbl
+
| Other Oil & Gas Wastes
| REUSE (AT WELL PAD)
+
| style="text-align: right;" | 31.25 Bbl
|
 
|-
 
| 2019-M03
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 22.79 Tons
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| 2014-541
+
| ODNR 2015-29
 
|-
 
|-
| 2019-M03
+
| 2019
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 219.39 Tons
+
| Drilling Fluid Waste
| LANDFILL
+
| style="text-align: right;" | 508.75 Bbl
| CID # 28726
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|  
 
|-
 
|-
 
|}
 
|}

Latest revision as of 14:57, 15 May 2020

Well Details

Well ID: 37-125-28538
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 155095
Farm/Lease Name: CONSOL MOR44GHS
License Status:
Spud Date:
Permit Date: 2018-03-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.975797
Longitude: -80.424075

For data sources see[1][2][3]

Well History

Date Event
2018-03-14 New Permit Application
2018-06-12 MOD
2018-11-01 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-25 7,114 13,990,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water CNX Carrier/Base Fluid Water 7732-18-5 100 84.2518 116,750,000.0
MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.00474073 6569.37
Ethanol 64-17-5 2.8 0.000497155 688.923
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000942819 1306.49
didecyldimethylammonium chloride 7173-51-5 8 0.00141512 1960.97
KAI-12 Keane Acid Inhibitor Methanol 67-56-1 90 0.00064372 892.022
xylene 1330-20-7 5 0.00003576 49.557
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003576 49.557
isoproyl alcohol 67-63-0 5 0.00003576 49.557
ethylbenzene 100-41-4 1 0.00000715 9.911
prop-2-yn-1-ol 107-19-7 5 0.00003576 49.557
Fatty imidazoline 61790-69-0 5 0.00003576 49.557
KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.000580199 803.999
acetic acid 64-19-7 60 0.000870298 1206
KSI-22 Keane Scale Inhibitor 2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00229781 3184.15
Methanol 67-56-1 50 0.0114891 15920.8
KFR-48 Keane Friction Reducer Water 7732-18-5 47 0.0228927 31723.2
alkanes, C16-20-iso- 90622-59-6 25 0.012177 16874
butene, homopolymer 9003-29-6 25 0.012177 16874
Alcohols, C12-18, ethoxylated 68213-23-0 3 0.00146124 2024.88
KWG-111LS Keane Gel Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00874594 12119.5
Guar gum 9000-30-0 55 0.00874594 12119.5
KWBO-2 Keane Breaker Sodium persulfate 7775-27-1 99 0.000184322 255.42
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00003576 49.557
xylene 1330-20-7 5 0.00003576 49.557
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000942819 1306.49
didecyldimethylammonium chloride 7173-51-5 8 0.00141512 1960.97
Alcohols, C12-18, ethoxylated 68213-23-0 3 0.00146124 2024.88
Fatty imidazoline 61790-69-0 5 0.00003576 49.557
alkanes, C16-20-iso- 90622-59-6 25 0.012177 16874
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00229781 3184.15
Ethanol 64-17-5 2.8 0.000497155 688.923
ethylbenzene 100-41-4 1 0.00000715 9.911
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003576 49.557
Water 7732-18-5 85 0 0
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00874594 12119.5
isoproyl alcohol 67-63-0 5 0.00003576 49.557
Water 7732-18-5 92.5 0.413453 572934
Citric acid 77-92-9 40 0.000580199 803.999
butene, homopolymer 9003-29-6 25 0.012177 16874
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Water 7732-18-5 92.5 0.413453 572934
Hydrochloric Acid 7647-01-0 7.5 0.0335232 46454.1
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 15.1935 21,054,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CNX GAS CO LLC 4,016,792.18 275 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CNX GAS CO LLC Drill Cuttings 472.09 Tons LANDFILL 100172
2018 CNX GAS CO LLC Drilling Fluid Waste 598.90 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Drilling Fluid Waste 223.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Drilling Fluid Waste 1,263.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Drill Cuttings 150.83 Tons LANDFILL 06-08438
2018 CNX GAS CO LLC Produced Fluid 163.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 2,024.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Other Oil & Gas Wastes 153.75 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes 281.25 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Other Oil & Gas Wastes 67.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 796.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Other Oil & Gas Wastes 23.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Drill Cuttings 60.95 Tons LANDFILL 100663
2018 CNX GAS CO LLC Drilling Fluid Waste 191.25 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes 60.75 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Drilling Fluid Waste 160.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Soil Contaminated by Oil 219.39 Tons LANDFILL CID # 28726
2019 CNX GAS CO LLC Drilling Fluid Waste 17.50 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 4,655.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Drill Cuttings 140.88 Tons LANDFILL 06-08438
2019 CNX GAS CO LLC Produced Fluid 2.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Drilling Fluid Waste 12.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Soil Contaminated by Oil & Gas Related Spills 219.39 Tons LANDFILL CID # 28726
2019 CNX GAS CO LLC Other Oil & Gas Wastes 80.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 4,741.25 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Drilling Fluid Waste 61.25 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Waste Water Treatment Sludge 26.46 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Drill Cuttings 426.59 Tons LANDFILL 100172
2019 CNX GAS CO LLC Other Oil & Gas Wastes 27.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 171.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Synthetic Liner Materials 1.92 Tons LANDFILL 100663
2019 CNX GAS CO LLC Produced Fluid 1,667.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Synthetic Liner Materials 7.55 Tons LANDFILL 100172
2019 CNX GAS CO LLC Other Oil & Gas Wastes 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Drilling Fluid Waste 19.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Drill Cuttings 42.85 Tons LANDFILL 100663
2019 CNX GAS CO LLC Produced Fluid 3,073.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 80.22 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Produced Fluid 9,351.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 CNX GAS CO LLC Produced Fluid 84.73 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 9,618.25 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Drilling Fluid Waste 512.50 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Other Oil & Gas Wastes 30.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 11,714.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Drilling Fluid Waste 151.25 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes 31.25 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Drilling Fluid Waste 508.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2798889 Primary Facility 2018-11-06 Drilling/Alteration No Violations Noted Operator reports 100' of 32" with 26" csg cmtd to surf using 1" pipe on backside. On site inspection showed no issues. NOVIO

For data sources see[8]

References