X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-105-21301"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-105-21301
 
| Well ID: 37-105-21301
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.715845, -78.147149 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.715845, -78.147149 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID: [[146012]]
 
| Well Pad ID: [[146012]]
 
|-
 
|-
| Farm/Lease Name: REED RUN 1942
+
| Farm/Lease Name: REED RUN
 
|-
 
|-
| License Status: Plugged OG Well
+
| License Status: Plugged and Abandoned
 
|-
 
|-
| Spud Date: 01/22/2007
+
| Spud Date: 2007-01-23
 
|-
 
|-
| Permit Date: 12/19/2006
+
| Permit Date: 2006-12-19
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.715845
 
| Latitude: 41.715845
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-12-19
 +
| New Permit Application
 +
|-
 +
| 2007-01-22
 +
| Performed Spud Operation
 +
|-
 +
| 2007-02-21
 +
| Drilling Completion
 +
|-
 +
| 2007-06-28
 +
| Perforation
 +
|-
 +
| 2007-08-23
 +
| NEWLY DRILLED
 +
|-
 +
| 2015-12-23
 +
| Inactive Well Request Granted
 +
|-
 +
| 2019-03-04
 +
| Begin Plugging
 +
|-
 +
| 2019-03-20
 +
| Finished Plugging
 +
|-
 +
| 2019-09-17
 +
| Fully Plugged
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 139:
 
|-
 
|-
 
| 2006
 
| 2006
| style="text-align: right;" |
+
| [[PA GEN ENERGY CO LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[PA GEN ENERGY CO LLC]]
 
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 9,181.00
+
| style="text-align: right;" | 9181.00
 
| style="text-align: right;" | 148
 
| style="text-align: right;" | 148
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[PA GEN ENERGY CO LLC]]
 
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 12,767.00
+
| style="text-align: right;" | 12767.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[PA GEN ENERGY CO LLC]]
 
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 9,814.00
+
| style="text-align: right;" | 9814.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 187: Line 265:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 192: Line 271:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-0
+
| 2008
 +
| [[PA GEN ENERGY CO LLC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 439.00 Bbl
 
| style="text-align: right;" | 439.00 Bbl
Line 198: Line 278:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[PA GEN ENERGY CO LLC]]
 +
| Brine
 +
| style="text-align: right;" | 190.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0102784
 +
|-
 +
| 2009
 +
| [[PA GEN ENERGY CO LLC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 155.00 Bbl
 
| style="text-align: right;" | 155.00 Bbl
Line 204: Line 292:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2009-0
+
| 2010
| Brine
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 190.00 Bbl
+
| Produced Fluid
| Brine or Industrial Waste Treatment Plt
+
| style="text-align: right;" | 53.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2010-2
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[PA GEN ENERGY CO LLC]]
 +
| Drilling Fluid Waste
 
| style="text-align: right;" | 107.00 Bbl
 
| style="text-align: right;" | 107.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2010-3
+
| 2010
| Produced Fluid (in Barrels)
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 155.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 77.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-3
+
| 2012
| Produced Fluid (in Barrels)
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align: right;" | 107.00 Bbl
+
| Produced Fluid
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
|-
 
| 2012-1
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 110.71 Bbl
 
| style="text-align: right;" | 110.71 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014
| Produced Fluid (in Barrels)
+
| [[PA GEN ENERGY CO LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 259: Line 346:
 
| 1594780
 
| 1594780
 
| Primary Facility
 
| Primary Facility
| 01/23/2007
+
| 2007-01-23
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 353:
 
| 1595442
 
| 1595442
 
| Primary Facility
 
| Primary Facility
| 01/24/2007
+
| 2007-01-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 273: Line 360:
 
| 1596170
 
| 1596170
 
| Primary Facility
 
| Primary Facility
| 01/29/2007
+
| 2007-01-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 280: Line 367:
 
| 1598392
 
| 1598392
 
| Primary Facility
 
| Primary Facility
| 02/06/2007
+
| 2007-02-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 287: Line 374:
 
| 1598972
 
| 1598972
 
| Primary Facility
 
| Primary Facility
| 02/08/2007
+
| 2007-02-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 294: Line 381:
 
| 1601971
 
| 1601971
 
| Primary Facility
 
| Primary Facility
| 02/21/2007
+
| 2007-02-21
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 301: Line 388:
 
| 1604413
 
| 1604413
 
| Primary Facility
 
| Primary Facility
| 03/02/2007
+
| 2007-03-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 308: Line 395:
 
| 1713825
 
| 1713825
 
| Primary Facility
 
| Primary Facility
| 06/11/2008
+
| 2008-06-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 315: Line 402:
 
| 1715247
 
| 1715247
 
| Primary Facility
 
| Primary Facility
| 06/11/2008
+
| 2008-06-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 322: Line 409:
 
| 2203345
 
| 2203345
 
| Primary Facility
 
| Primary Facility
| 09/11/2013
+
| 2013-09-11
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 329: Line 416:
 
| 2423918
 
| 2423918
 
| Primary Facility
 
| Primary Facility
| 10/27/2015
+
| 2015-10-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 406: Line 493:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 15:50, 15 May 2020

Well Details

Well ID: 37-105-21301
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Keating Township
Operator Name: PA GEN ENERGY CO LLC
Well Pad ID: 146012
Farm/Lease Name: REED RUN
License Status: Plugged and Abandoned
Spud Date: 2007-01-23
Permit Date: 2006-12-19
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.715845
Longitude: -78.147149

For data sources see[1][2][3]

Well History

Date Event
2006-12-19 New Permit Application
2007-01-22 Performed Spud Operation
2007-02-21 Drilling Completion
2007-06-28 Perforation
2007-08-23 NEWLY DRILLED
2015-12-23 Inactive Well Request Granted
2019-03-04 Begin Plugging
2019-03-20 Finished Plugging
2019-09-17 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2007 PA GEN ENERGY CO LLC 9181.00 148 0.00 0 0.00 0
2008 PA GEN ENERGY CO LLC 12767.00 365 0.00 0 0.00 0
2009 PA GEN ENERGY CO LLC 9814.00 365 0.00 0 0.00 0
2010 PA GEN ENERGY CO LLC 8,831.00 366 0.00 0 0.00 0
2011 PA GEN ENERGY CO LLC 5,272.00 303 0.00 0 0.00 0
2012 PA GEN ENERGY CO LLC 6,454.00 301 0.00 0 0.00 0
2013 PA GEN ENERGY CO LLC 6,396.00 365 0.00 0 0.00 0
2014 PA GEN ENERGY CO LLC 5,649.00 364 0.00 0 0.00 0
2015 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2016 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2017 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2019 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 PA GEN ENERGY CO LLC Brine 439.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2009 PA GEN ENERGY CO LLC Brine 190.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2009 PA GEN ENERGY CO LLC Brine 155.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 PA GEN ENERGY CO LLC Produced Fluid 53.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 PA GEN ENERGY CO LLC Drilling Fluid Waste 107.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 PA GEN ENERGY CO LLC Produced Fluid 77.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PA GEN ENERGY CO LLC Produced Fluid 110.71 Bbl REUSE OTHER THAN ROAD SPREADING
2014 PA GEN ENERGY CO LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-007-21847

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1594780 Primary Facility 2007-01-23 Drilling/Alteration No Violations Noted
1595442 Primary Facility 2007-01-24 Drilling/Alteration No Violations Noted
1596170 Primary Facility 2007-01-29 Drilling/Alteration No Violations Noted
1598392 Primary Facility 2007-02-06 Drilling/Alteration No Violations Noted
1598972 Primary Facility 2007-02-08 Routine/Complete Inspection No Violations Noted
1601971 Primary Facility 2007-02-21 Drilling/Alteration No Violations Noted
1604413 Primary Facility 2007-03-02 Routine/Complete Inspection No Violations Noted
1713825 Primary Facility 2008-06-11 Routine/Complete Inspection No Violations Noted
1715247 Primary Facility 2008-06-11 Routine/Complete Inspection No Violations Noted
2203345 Primary Facility 2013-09-11 Routine/Partial Inspection No Violations Noted An inspection of the Reed Run 1942 well site in Keating Township, Potter County was conducted on Sept 11, 2013. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was observed at the site. No puddles screened exhibited elevated conductivity. There was no site ID sign and no well tag appeared to be installed and no E&S plan or mailbox at the site. These issues need to be addressed as soon as possible.
2423918 Primary Facility 2015-10-27 Routine/Complete Inspection No Violations Noted
2609249 Primary Facility 2017-06-12 Routine/Complete Inspection No Violations Noted
2685921 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly all fittings and flow lines were tested for gas. The results of this testing was no gas was detected on the wellhead assembly or the well area.
2844191 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in Regulatory Inactive Status. This well was shut in and not producing at this inspection. A gauge on the flow line indicated 0 psi (pounds per square inch) pressure n the well. This well is scheduled to be plugged at a later date. No violations noted at this inspection.
2850207 Primary Facility 2019-03-06 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine (plugging) inspection of this vertical well was conducted March 6, 2019. Howard Drilling are on location with a workover rig for final plug and abandonment. Bridge plugs and cementing were scheduled for today but operations have been delayed somewhat after discovering unexpected pressure on production casing. At the time of inspection, the crew were in the process of bleeding down casing to a tank. I met with the site supervisor and discussed the well construction and tentative plugging procedure. After blowing down the well they will proceed to pull rods and tubing and begin plugging. The well was completed in the Burkett in addition to the Marcellus; bridge plugs along with cement will be set to isolate these zones from each other. No obvious major issues were observed at this time.
2854222 Primary Facility 2019-03-14 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine (plugging) inspection of this vertical well was conducted March 14, 2019. Howard Drilling are on location with a workover rig for final plug and abandonment. Wireline is spotted on location to separate production casing for retrieval. I met with the the site supervisor and wireline operator to discuss downhole operations on the pad. Both bridge plugs were successfully set above completed Marcellus and Burkett formations, respectively. Both bridge plugs are capped with cement. The well is dead at this time. The rig crew and welder are in the process of removing B-section and weld pup jt for rig to pull casing upon separation. Estimated freepoint is above TOC at approximately 4586' based on original CBL. No obvious issues were observed during this inspection.
2856452 Primary Facility 2019-03-19 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine (plugging) inspection of this vertical well was conducted March 19, 2019. Howard Drilling workover rig is on location for final plug and abandonment. The operator is WOC after pumping cement plugs and intends to pump remaining (2) cement plugs this evening (1580'-1140', 647'-497') inside of intermediate casing. Production casing has been successfully recovered from 4480' and two plugs were pumped; one across the casing stub and one across the casing shoe. At the time of inspection, I met with the site supervisor to discuss operations on the pad. The well was open; no discharge or venting was observed. No obvious issues were observed at this time.

For data sources see[7]

References