X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-105-21873"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-105-21873
 
| Well ID: 37-105-21873
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.798673, -77.976387 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.798673, -77.976387 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: REESE HOLLOW 115 5HU
 
| Farm/Lease Name: REESE HOLLOW 115 5HU
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2016-09-22
+
| Spud Date: 2016-09-24
 
|-
 
|-
 
| Permit Date: 2016-08-05
 
| Permit Date: 2016-08-05
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.798673
 
| Latitude: 41.798673
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Deviated
 +
|-
 +
| 2016-08-05
 +
| New Permit Application
 +
|-
 +
| 2016-09-22
 +
| Performed Spud Operation
 +
|-
 +
| 2017-06-07
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 89:
 
| 2017-11-14
 
| 2017-11-14
 
| 2017-12-02
 
| 2017-12-02
| style="text-align: right;" | 10866
+
| style="text-align: right;" | 10,866
| style="text-align: right;" | 13,910,600.0
+
| style="text-align: right;" | 13,910,600
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 306: Line 333:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 346: Line 384:
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| style="text-align: right;" | 286,803.00
+
| style="text-align: right;" | 866,321.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 327
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 371: Line 409:
 
| 2016
 
| 2016
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drill Cuttings
| style="text-align: right;" | 359.17 Bbl
+
| style="text-align: right;" | 628.50 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2016
 +
| [[JKLM ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 448.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
Line 378: Line 423:
 
| 2016
 
| 2016
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 448.33 Bbl
+
| style="text-align: right;" | 359.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
Line 385: Line 430:
 
| 2016
 
| 2016
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Drilling Fluid Waste
 
| style="text-align: right;" | 104.17 Bbl
 
| style="text-align: right;" | 104.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2016
+
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 628.50 Tons
+
| style="text-align: right;" | 1,305.34 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 301358
+
| WMGR123NW005
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid
| style="text-align: right;" | 917.67 Bbl
+
| style="text-align: right;" | 18.50 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123NC010
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 557.67 Bbl
+
| style="text-align: right;" | 1,211.67 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 413: Line 458:
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Drilling Fluid Waste
 
| style="text-align: right;" | 1,120.16 Bbl
 
| style="text-align: right;" | 1,120.16 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 420: Line 465:
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drill Cuttings
| style="text-align: right;" | 1,305.34 Bbl
+
| style="text-align: right;" | 1,426.66 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| WMGR123NW005
+
| 301358
|-
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 424.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 18.00 Bbl
 
| style="text-align: right;" | 18.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 441: Line 479:
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Synthetic Liner Materials
| style="text-align: right;" | 1,426.66 Tons
+
| style="text-align: right;" | 20.22 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 448: Line 486:
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid
| style="text-align: right;" | 20.22 Tons
+
| style="text-align: right;" | 364.67 Bbl
| LANDFILL
+
| REUSE (AT WELL PAD)
| 301358
+
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 18.50 Bbl
+
| style="text-align: right;" | 424.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123NW005
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 7,213.72 Bbl
+
| style="text-align: right;" | 8,280.39 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 469: Line 507:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Produced Fluid
| style="text-align: right;" | 17.29 Tons
+
| style="text-align: right;" | 37,017.84 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 301358
+
| WMGR123NW011
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 173.35 Bbl
 
| style="text-align: right;" | 173.35 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 483: Line 521:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Drill Cuttings
| style="text-align: right;" | 2,333.13 Bbl
+
| style="text-align: right;" | 17.29 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| WMGR123NC010
+
| 301358
 +
|-
 +
| 2018
 +
| [[JKLM ENERGY LLC]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 11.17 Tons
 +
| LANDFILL
 +
| 301358
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 16.67 Bbl
 
| style="text-align: right;" | 16.67 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 497: Line 542:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Synthetic Liner Materials
| style="text-align: right;" | 18.33 Bbl
+
| style="text-align: right;" | 28.63 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| WMGR123NW011
+
| 301358
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Produced Fluid
| style="text-align: right;" | 58.44 Tons
+
| style="text-align: right;" | 50.06 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 511: Line 556:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 28.63 Tons
+
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018
 +
| [[JKLM ENERGY LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 58.44 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 518: Line 570:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Unused Fracturing Fluid Waste (in Tons) RWC 805
+
| Produced Fluid
| style="text-align: right;" | 11.17 Tons
+
| style="text-align: right;" | 2,333.13 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 301358
+
| WMGR123NC010
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 980.79 Bbl
 
| style="text-align: right;" | 980.79 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 532: Line 584:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 3,361.67 Bbl
 
| style="text-align: right;" | 3,361.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 539: Line 591:
 
| 2018
 
| 2018
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Tons) RWC 802
+
| Soil Contaminated by Oil
| style="text-align: right;" | 50.06 Tons
+
| style="text-align: right;" | 58.44 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
 
|-
 
|-
| 2018
+
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 37,017.84 Bbl
+
| style="text-align: right;" | 3,355.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
Line 553: Line 605:
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 905.83 Bbl
+
| style="text-align: right;" | 728.34 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-133-24189
 +
|-
 +
| 2019
 +
| [[JKLM ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 661.55 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2019
 +
| [[JKLM ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 270.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[JKLM ENERGY LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 91.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Tons) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 3.40 Tons
+
| style="text-align: right;" | 284.74 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 301358
+
| WMGR123NC010
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Waste Water Treatment Sludge
| style="text-align: right;" | 36.67 Bbl
+
| style="text-align: right;" | 10.08 Tons
| REUSE (AT WELL PAD)
+
| LANDFILL
|  
+
| 301358
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid
| style="text-align: right;" | 2.26 Tons
+
| style="text-align: right;" | 3.40 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 581: Line 654:
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,228.38 Bbl
+
| style="text-align: right;" | 3,015.69 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
Line 588: Line 661:
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 140.47 Bbl
+
| style="text-align: right;" | 80.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| STORAGE PENDING DISPOSAL OR REUSE
| WMGR123
+
| WMGR123NC038
 +
|-
 +
| 2019
 +
| [[JKLM ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 947.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-22403
 +
|-
 +
| 2019
 +
| [[JKLM ENERGY LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 6.43 Tons
 +
| LANDFILL
 +
| 301358
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 152.45 Bbl
+
| style="text-align: right;" | 36.67 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| WMGR123NC010
+
|  
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[JKLM ENERGY LLC]]
 
| [[JKLM ENERGY LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 3,355.00 Bbl
+
| style="text-align: right;" | 1,903.33 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| WMGR123NW011
+
|  
 
|-
 
|-
 
|}
 
|}

Latest revision as of 16:54, 15 May 2020

Well Details

Well ID: 37-105-21873
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Eulalia Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153811
Farm/Lease Name: REESE HOLLOW 115 5HU
License Status:
Spud Date: 2016-09-24
Permit Date: 2016-08-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.798673
Longitude: -77.976387

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-08-05 New Permit Application
2016-09-22 Performed Spud Operation
2017-06-07 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-14 2017-12-02 10,866 13,910,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KAI-12 Keane Acid Inhibitor Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008452 113.934
isoproyl alcohol 67-63-0 5 0.00008452 113.934
xylene 1330-20-7 5 0.00008452 113.934
Fatty imidazoline 61790-69-0 5 0.00008452 113.934
prop-2-yn-1-ol 107-19-7 5 0.00008452 113.934
ethylbenzene 100-41-4 1 0.00001690 22.787
Methanol 67-56-1 90 0.00152128 2050.82
KFEAC-30 Keane Iron Control Citric acid 77-92-9 30 0.000977637 1317.94
Acetic acid 64-19-7 5 0.00016294 219.657
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0604466 81487.4
Water 7732-18-5 92.5 0.745508 1,005,010.0
Other Chemical(s) Listed Above See Trade Name(s) List oleic acid diethanolamide 93-83-4 2 0.00137795 1857.6
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0137795 18576
Water 7732-18-5 92.5 0.745508 1,005,010.0
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008452 113.934
prop-2-yn-1-ol 107-19-7 5 0.00008452 113.934
xylene 1330-20-7 5 0.00008452 113.934
Water 7732-18-5 85 0 0
isoproyl alcohol 67-63-0 5 0.00008452 113.934
copolymer of 2-propenamide 69418-26-4 20 0.0137795 18576
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00137795 1857.6
Fatty imidazoline 61790-69-0 5 0.00008452 113.934
Citric acid 77-92-9 30 0.000977637 1317.94
ethylbenzene 100-41-4 1 0.00001690 22.787
Polyurethane Resin 57029-46-6 2 0 0
Water JKLM Carrier/Base Fluid Water 7732-18-5 100 86.11 116,084,000.0
KFR-23 Keane Friction Reducer oleic acid diethanolamide 93-83-4 2 0.00137795 1857.6
Water 7732-18-5 50 0.0344487 46439.9
copolymer of 2-propenamide 69418-26-4 20 0.0137795 18576
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00137795 1857.6
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0137795 18576
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 13.0102 17,538,900.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 JKLM ENERGY LLC 1,096,644.00 215 0.00 0 0.00 0
2019 JKLM ENERGY LLC 866,321.00 327 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Drill Cuttings 628.50 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Produced Fluid 448.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 359.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Drilling Fluid Waste 104.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,305.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 18.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,211.67 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drilling Fluid Waste 1,120.16 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drill Cuttings 1,426.66 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Synthetic Liner Materials 20.22 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 364.67 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid 424.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid 8,280.39 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 37,017.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 173.35 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Drill Cuttings 17.29 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Unused Fracturing Fluid Waste 11.17 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Synthetic Liner Materials 28.63 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 50.06 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills 58.44 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 2,333.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 980.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid 3,361.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Soil Contaminated by Oil 58.44 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,355.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 728.34 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Produced Fluid 661.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 JKLM ENERGY LLC Drilling Fluid Waste 91.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 284.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Waste Water Treatment Sludge 10.08 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3.40 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,015.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 80.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 947.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Synthetic Liner Materials 6.43 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 36.67 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 1,903.33 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2499681 Primary Facility 2016-07-08 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Reese Hollow 115 well pad. JKLM, J.L. Watts and New Growth Resources present. Site will consist of a 350' x 500' well pad and improvement of an existing access road. New Growth Resources plans to begin logging/chipping operations in the next several days; J.L. Watts will begin site construction after clearing operations are completed. One permit, the Reese Hollow 115 4HU (105-21872) has been issued. Applications for the 1HU - 3HU, 5HU and 6HU are under review. TLT
2519944 Primary Facility 2016-09-16 Preoperation Inspection No Violations Noted Preoperation inspection prior to spudding 1HU - 6HU wells. Site construction is complete. E&S controls have been installed and disturbed areas seeded and mulched. TLT
2541187 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted
2548279 Primary Facility 2016-12-29 Routine/Partial Inspection No Violations Noted Partial inspection. The site was snow covered. Drilling of the 1HU - 6HU topholes was completed in November. Site is being used to store equipment and materials in anticipation of the arrival of the H&P 500 rig. Materials on site are stored in containment. Sediment traps were frozen over and snow covered. Some vegetation was visible above the snow cover on the topsoil stockpiles and well pad cut slope. No violations noted. TLT
2548986 Primary Facility 2016-12-28 Routine/Complete Inspection No Violations Noted
2580952 Primary Facility 2017-04-10 Routine/Complete Inspection No Violations Noted
2601576 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted
2621823 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted
2626425 Primary Facility 2017-08-10 Routine/Complete Inspection No Violations Noted
2665750 Primary Facility 2017-11-21 Routine/Complete Inspection No Violations Noted A routine inspection was conducted at the JKLM Reese Hollow 115 well pad (ESX29-105-16-0003) located in Sweden Twp., Potter Co. on November 21, 2017 @1235 hours. Keane Group, Inc. was onsite conducting stimulation activities on the 6HU well (API#10521874). Scott West, a Consultant for JKLM, was present onsite for the inspection. Mr. West contacted Mr. Jon Manuel, he arrived onsite after fluid exhibiting high conductivity was discovered off containment.

Fluid was observed along the western side of the pad containment. The fluid level was up to the top of the rig matting. An Oakton Multi-Parameter PCSTestr 35 was used to test the field conductivity of the fluid in containment at "Or" or >20.00 mS/cm (see Photo#1). Photos #2 and #3 show the level of fluid in the primary containment. A puddle just off containment (see photo #4), on the west side of the pad, had a field tested conductivity of "Or" or >20.00 mS/cm (see photo #5).

The pollutional material was observed spilling out of the corner of the pad contain

2667113 Primary Facility 2017-12-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was already stimulated(hydraulic fractured). Stimulation for this well started 11/14/17 and finished on 12/2/17. No issues were noted during this stimulation.
2668888 Primary Facility 2017-12-07 Routine/Complete Inspection No Violations Noted I arrived on site with Clark Smith of the Environmental Cleanups program and was met by Tyler McConnell of JKLM. We were there to follow up on the containment violations and release noted in an 11/21 inspection by Elizabeth Niles, WQS for the Oil & Gas program. We proceeded to the northwest corner of the pad to the level spreader and sediment trap where Ellie noted the high conductance fluid both in and outside the containment. We noted that the sediment trap had obviously been excavated to an unspecified depth; the water in the trap showed conductance of .63 mS/cm and had frozen enough to walk on. A small amount of slushy water (1-2 gallons) in the containment corner had conductance that read as "OR" on my meter (over 20 mS/cm). Tyler pointed out a vac truck in this area, and told us they had one on the opposite corner as well, as both spots were low spots where water collects. Tyler informed me that JKLM had had 2 of their employees on location during all operations since the incident, as well as uti
2679792 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted At the time of this inspection this well has been hydraulically fractured(stimulated). This well is not producing and is not connected to a gas sales line. The 9 5/8" x 13 3/8" annulus was vented and open and was tested for gas with a gas meter with no gas detected. The 5 1/2" x 9 5/8" annulus was also vented and was closed. This annulus was also tested with no gas detected. There were no violations noted at this inspection.
2694524 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection inspected the JKLM Reese Hollow 115 well pad located in Sweden Twp., Potter Co. on 2/12/2018 @1130 hours. Scott West, JKLM was present for the inspection. JKLM is in the process of pulling up the pad-wide containment. Approximately ¼ of the containment was remaining during the inspection. A large pile of snow was observed stockpiled on the remaining containment. Mr. West stated they are using two gas busters onsite to melt the snow. The recovered liquids are being stored in the Aboveground Storage Tank (AST) onsite, awaiting transfer to the frack at the Headwaters 145 site. Any recovered solids are being placed in residual waste containers awaiting transfer to a disposal facility.

Due to recent weather the pad surface is a mix of large puddles, ice and snow. The field conductivity of the large puddles at the center of the pad were ~2.0 mS/cm. A vac truck was in the process of removing the puddles. The standing fluid in the remaining containment had a field conducti

2703299 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was not in production. This well was temp. shut in for work being done on the annulus vents. The annulus vent lines on the following annulus 20x13,13x9 and 9x5 were being put in place on the wellhead assembly at the time of this inspection.
2719833 Primary Facility 2018-04-17 Routine/Complete Inspection No Violations Noted At the time of this inspection the well was stimulated(Hydraulic fractured) and was temp. shut-in. The well was being set up for production.
2721168 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted Some activity on pad when I arrived. Many puddles present on the pad, with conductivity ranging from .35-.90 mS/cm. AST still present on the pad, filled to within 8-9' of the top. Some water had collected in the secondary tank (4-6"); I recommend that it be vacced ASAP to maintain leak detection in this tank. I was unable to locate any well tags; I recommend that tags be affixed ASAP. If tags were present, I recommend that the tags be made more visible.
2736587 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At the time of this inspection flow back was ongoing
2742362 Primary Facility 2018-06-14 Routine/Complete Inspection No Violations Noted The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 6/14/2018 @1100 hours. The weather was 70 degrees, sunny, 38% humidity and winds WNW 20 mph. The site appears to be setup for flowback activity. The weekly E&S site inspection was last conducted on 6/14/2018 with the comment “housekeeping remains an issue”.

As of today’s inspection, numerous puddles were observed on the pad surface. Standing water was observed on the pad surface along the edge of the gas buster containment. The Electrical Conductivity was field measured With an Oakton Multiparameter PCSTestr and found to be 18.90mS/cm (see attached photo #3 and #4). A smaller “duck pond” containment was located ~1’ away from the gas buster containment. Fluid in the duck pond had a field measured conductivity of 6.72mS/cm(see photo #5). Fluid in the gas buster containment had a field measured conductivity of “Or” or >20.00 mS/cm (see photo #6). The volume is unknown, but it is estimated the rel

2748270 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The Flow back process(cleaning out the well of excess hydraulic fracturing water) had been completed. The annulus vent 13 3/8" x 18 5/8" detected a combustable gas reading. During a discussion with Jake Long ,a JKLM Engineer, he informed me that as a result of high pressures and temperatures going through the well during flow back it is not uncommon to see a combustable gas reading on different annulus vents until the well stabilizes the high pressures and temperatures. The gas %(percentage) reading is in the findings section of this inspection. Annulus vent monitoring will be ongoing until the well stabilizes its pressures and temperatures.
2758994 Primary Facility 2018-07-30 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. Flow back ended on this pad on 6-12-18. Flow back is the last stage of the process of developing a well(s) before the well goes into production for gas sales. No violations were noted at the time of this inspection.
2763193 Primary Facility 2018-08-09 Compliance Evaluation No Violations Noted The DEP conducted a Follow-Up Inspection (FUI) at the JKLM Reese Hollow 115 well site located in Sweden Twp., Potter Co. on 8/9/2018 @1030 hours. The weather was 74°, Sunny, Humidity 62%, winds WNW 8mph. Korey Starkey, DEP Env Trainee was present for the inspection.

The well pad is currently setup for flowback activities. A damp area and a small puddle were observed along the front edge of the gas buster containment. The electrical conductivity was field measured with an Oakton PCSTestr 50 and found to be 2.2 mS/cm(Photo#3). Fluid in the gas buster containment had a field measured conductivity of 1700 µS/cm. Numerous patches were observed in the gas buster containment(Photo#4). A vac truck driver onsite was notified of the puddle, exhibiting elevated conductivity, along the front edge of the gas buster containment and the fluid was removed. Puddles were observed around the “duck ponds” adjacent to the production fluid tank containment (Photo#5,6). The electrical conductivity was field measured with an Oak

2765892 Primary Facility 2018-08-20 Routine/Complete Inspection Pending Truck traffic on the site was steady, with water trucks loading at the MASS to transport water to the Headwaters 142 for the frac. Water in the containment around the loading area showed conductance of 4.25 mS/cm, and was within 1-2" of the top of the berm. I noted several puddles on the pad, mostly to the west and north of the well heads, that showed conductance of 2.45-3.05 mS/cm. Rob Bowens of JKLM was on the site, and told me that the vac truck that had been working at the 117 pad would be coming to the 115 next. Violations are pending from an 8/9/18 inspection, including 78a.56, CSL 402, and SWMA 301.
2803101 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. No annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2813883 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM - Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 12/11/2018 @1145 hours. The weather was 25 degrees, partly sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. NORtech personnel were present onsite during the inspection.

The well site appears to be setup for production. 6 wells were observed onsite. The pad surface was covered by snow and ice. No issues were observed. No new violations are noted at this time. I departed the site at 1245 hours.

The following violations remain OUTSTANDING against the 1H well from inspection report #2778074 dated 9/21/2018, awaiting approval of the Final Report/Remedial Action Completion Report from the ECB. 25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters of then Commonwealth) 35 PS § 6018.301 SWMA

For data sources see[8]

References