X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-105-21927"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-105-21927
 
| Well ID: 37-105-21927
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.828450, -77.868403 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.828450, -77.868403 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 15: Line 15:
 
| Operator Name: [[JKLM ENERGY LLC]]
 
| Operator Name: [[JKLM ENERGY LLC]]
 
|-
 
|-
| Well Pad ID: [[155450]]
+
| Well Pad ID:  
 
|-
 
|-
 
| Farm/Lease Name: WOODCOCK CREEK 125-10V
 
| Farm/Lease Name: WOODCOCK CREEK 125-10V
Line 23: Line 23:
 
| Spud Date:  
 
| Spud Date:  
 
|-
 
|-
| Permit Date: 9/7/2018
+
| Permit Date: 2018-09-07
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.828450
 
| Latitude: 41.828450
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-09-07
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
<!--== Production Data ==
 
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 119:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 211:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 17:00, 15 May 2020

Well Details

Well ID: 37-105-21927
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Allegany Township
Operator Name: JKLM ENERGY LLC
Well Pad ID:
Farm/Lease Name: WOODCOCK CREEK 125-10V
License Status:
Spud Date:
Permit Date: 2018-09-07
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.828450
Longitude: -77.868403

For data sources see[1][2][3]

Well History

Date Event
2018-09-07 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2801189 Primary Facility 2018-11-07 Routine/Complete Inspection No Violations Noted The DEP conducted a ROUTINE inspection of the JKLM Woodcock Creek Well Pad located in Allegany Twp, Potter Co. on 11/7/2018 @1100 hours. The weather was 49 degrees, 52% humidity, winds NE @15mph. The well site is currently under construction, however no personnel were onsite during this inspection. The site is located in the Woodcock Creek (HQ-CWF) and Gross Hollow (CWF) watershed.

No violations are noted at this time. I departed the site @1200 hours.

2811624 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM-Woodcock Creek Well pad 125 located in Allegany Twp, Potter Co. on 12/6/2018 @1145 hours. The weather was 30 degrees, overcast, winds SW @12mph. There was ~6" of snow observed on the ground.

JKLM has submitted a major modification to the ESCGP to expand the LOD of the topsoil stockpile area. The earth moving contractor JL Watts discovered a larger volume of topsoil covering the permitted site than what was originally calculated. The proposed modification would add 1.59 acres to accommodate approximately 40,000 cubic yards of material. Details were discussed onsite with John Watts, contractor.

As of today's inspection the access road has been rough graded to the pad area. Equipment was working on grubbing the pad area, placing the topsoil in within the original LOD of the stockpile area. Wetlands appear to be flagged with orange fencing.

The last E&S inspection was conducted on 12/3/2018, with no issues noted. No v

2835759 Primary Facility 2019-02-05 Preoperation Inspection No Violations Noted Silt sock no chip berm. 1 HU.

The Department of Environmental Protection (DEP) conducted a PREOP inspection of the JKLM Woodcock Creek Well Pad 125, located in Allegany Twp, Potter Co. on 2/5/2018 @1000 hours. Present for the inspection were Jeff Long, JKLM; Jamie Spear, JKLM and John Watts, JL Watts Contractor. No activity was observed onsite.

The site consists of ~4200' of access road, a 350' x 500' well pad, two sediment traps, and a topsoil stockpile. As of today's inspection the access road and rock-lined channels were observed installed. Soil cement and cap rock has not been completed on the well pad. The out-slope of the well pad was observed stabilized with ECB matting, with TRM matting in the perimeter channels.

The perforated drains around the perimeter of the well pad were discharging into the corner PVC pipe that outlets into the sediment traps. Both sediment traps were observed holding water and discharging due to snow melt. No violations were noted at this time. JKLM plans to spud and dril

2853524 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the JKLM Woodcock Creek well pad located in Allegany Twp, Potter Co on 3/132019 @1200 hours. The weather is 39 degrees, cloudy, winds NE 6mph, 53% humidity. The Falcon rig is currently onsite drilling the top-hole portion of the 1HU well. There are 4 wells permitted on the site, but JKLM only intends to the drill the 1HU at this time.

Ron Burdick, JKLM onsite rep notified of findings. No violations are noted at this time. I departed the site @1415 hours

For data sources see[5]

References