X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-30309"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-30309
 
| Well ID: 37-063-30309
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.562737, -79.254131 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.562737, -79.254131 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Center Township,_Indiana_County,_Pennsylvania|Center Township]]
 
| Municipality: [[Center Township,_Indiana_County,_Pennsylvania|Center Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 19: Line 19:
 
| Farm/Lease Name: EDWARD S. FABIN, ET UX 2
 
| Farm/Lease Name: EDWARD S. FABIN, ET UX 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 10/16/1991
+
| Spud Date: 1991-10-16
 
|-
 
|-
| Permit Date: 9/19/1991
+
| Permit Date: 1991-09-19
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.562737
 
| Latitude: 40.562737
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1991-09-19
 +
| New Permit Application
 +
|-
 +
| 1991-10-16
 +
| Performed Spud Operation
 +
|-
 +
| 1991-10-21
 +
| Drilling Completion
 +
|-
 +
| 1991-10-29
 +
| Perforation
 +
|-
 +
| 1992-01-01
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 1993
 
| 1993
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 16,145.00
+
| style="text-align: right;" | 16145.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 9140.00
 +
| style="text-align: right;" | 217
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 11144.00
 +
| style="text-align: right;" | 314
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 6,409.00
+
| style="text-align: right;" | 6409
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 7,506.00
+
| style="text-align: right;" | 7506
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 5,244.00
+
| style="text-align: right;" | 5244
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 4,579.00
+
| style="text-align: right;" | 4579
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 3,849.00
+
| style="text-align: right;" | 3849
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 3,919.00
+
| style="text-align: right;" | 3919
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 2,617.00
+
| style="text-align: right;" | 2617
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 2,863.00
+
| style="text-align: right;" | 2863
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
 
| style="text-align: right;" |
 
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 2,151.00
+
| style="text-align: right;" | 2151
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 2,292.00
+
| style="text-align: right;" | 2292
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 164: Line 248:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 1,817.00
+
| style="text-align: right;" | 1817.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 1,491.00
+
| style="text-align: right;" | 1491.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 191: Line 275:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 284:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 293:
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 302:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 311:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 320:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 329:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 688.10
+
| style="text-align: right;" | 688.1
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 982.00
 
| style="text-align: right;" | 982.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 842.00
 
| style="text-align: right;" | 842.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 286: Line 370:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 291: Line 376:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 0.00 Bbl
 
| style="text-align: right;" | 0.00 Bbl
Line 316: Line 402:
 
| 1487341
 
| 1487341
 
| Primary Facility
 
| Primary Facility
| 10/13/2005
+
| 2005-10-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 351: Line 437:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 19:05, 15 May 2020

Well Details

Well ID: 37-063-30309
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: EDWARD S. FABIN, ET UX 2
License Status: ACTIVE
Spud Date: 1991-10-16
Permit Date: 1991-09-19
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.562737
Longitude: -79.254131

For data sources see[1][2][3]

Well History

Date Event
1991-09-19 New Permit Application
1991-10-16 Performed Spud Operation
1991-10-21 Drilling Completion
1991-10-29 Perforation
1992-01-01 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1993 PHILLIPS EXPLORATION INC 16145.00 365 0.00 0 0.00 0
1994 PHILLIPS EXPLORATION INC 9140.00 217 0.00 0 0.00 0
1995 PHILLIPS EXPLORATION INC 11144.00 314 0.00 0 0.00 0
1996 PHILLIPS EXPLORATION INC 6409 365 0.00 0 0.00 0
1997 PHILLIPS EXPLORATION INC 7506 365 0.00 0 0.00 0
1998 PHILLIPS EXPLORATION INC 5244 355 0.00 0 0.00 0
1999 PHILLIPS EXPLORATION INC 4579 305 0.00 0 0.00 0
2000 PHILLIPS EXPLORATION INC 3849 353 0.00 0 0.00 0
2001 PHILLIPS EXPLORATION INC 3919 365 0.00 0 0.00 0
2002 PHILLIPS EXPLORATION INC 2617 365 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 2863 364 0 364 0.00 0
2004 PHILLIPS EXPLORATION INC 2151 366 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 2292 365 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 1,968.00 365 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 1817.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 1491.00 366 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 946.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 994.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 1,403.00 351 0.00 0 0.00 0
2012 XTO ENERGY INC 1,801.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 1,315.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 941.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 790.96 365 0.00 0 0.00 0
2016 XTO ENERGY INC 688.1 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 982.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 842.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 PHILLIPS EXPLORATION INC Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1487341 Primary Facility 2005-10-13 Routine/Complete Inspection No Violations Noted Tag, tank, e&s ok.

For data sources see[7]

References