If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-31856 | | Well ID: 37-063-31856 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.841117, -78.960539 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 13: | Line 13: | ||
| Municipality: [[Canoe Township,_Indiana_County,_Pennsylvania|Canoe Township]] | | Municipality: [[Canoe Township,_Indiana_County,_Pennsylvania|Canoe Township]] | ||
|- | |- | ||
− | | Operator Name: [[ALLIANCE | + | | Operator Name: [[ALLIANCE PETRO CO LLC]] |
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: LUELLA M OBERLIN 21 | | Farm/Lease Name: LUELLA M OBERLIN 21 | ||
|- | |- | ||
− | | License Status: | + | | License Status: ACTIVE |
|- | |- | ||
− | | Spud Date: 10 | + | | Spud Date: 1997-10-05 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 1997-08-06 |
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.841117 | | Latitude: 40.841117 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1997-08-06 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 1997-10-05 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 1997-10-15 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 1997-10-20 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2001-02-17 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 62: | Line 128: | ||
| 1997 | | 1997 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | 880 | + | | style="text-align: right;" | 880 |
| style="text-align: right;" | 6 | | style="text-align: right;" | 6 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 1998 | | 1998 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 18114 |
| style="text-align: right;" | 169 | | style="text-align: right;" | 169 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 1999 | | 1999 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 17855 |
| style="text-align: right;" | 279 | | style="text-align: right;" | 279 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2000 | | 2000 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 22420 |
| style="text-align: right;" | 308 | | style="text-align: right;" | 308 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2001 | | 2001 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 16352 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2002 | | 2002 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 13582 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2003 | | 2003 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 11880 |
+ | | style="text-align: right;" | 350 | ||
+ | | style="text-align: right;" | 0 | ||
| style="text-align: right;" | 350 | | style="text-align: right;" | 350 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | + | | style="text-align: right;" | 0 | |
− | | style="text-align: right;" | 0 | ||
− | |||
|- | |- | ||
| 2004 | | 2004 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 11600 |
| style="text-align: right;" | 362 | | style="text-align: right;" | 362 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2005 | | 2005 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 9593 |
| style="text-align: right;" | 344 | | style="text-align: right;" | 344 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2006 | | 2006 | ||
Line 146: | Line 212: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2007 | | 2007 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 8275.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2008 | | 2008 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7193.00 |
| style="text-align: right;" | 349 | | style="text-align: right;" | 349 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2009 | | 2009 | ||
| [[PHILLIPS EXPLORATION INC]] | | [[PHILLIPS EXPLORATION INC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 6664.00 |
| style="text-align: right;" | 330 | | style="text-align: right;" | 330 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 182: | Line 248: | ||
| style="text-align: right;" | 350 | | style="text-align: right;" | 350 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
Line 191: | Line 257: | ||
| style="text-align: right;" | 363 | | style="text-align: right;" | 363 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 200: | Line 266: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
Line 209: | Line 275: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 218: | Line 284: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 227: | Line 293: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 236: | Line 302: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
− | | [[ALLIANCE | + | | [[ALLIANCE PETRO CO LLC]] |
| style="text-align: right;" | 3,887.00 | | style="text-align: right;" | 3,887.00 | ||
| style="text-align: right;" | 334 | | style="text-align: right;" | 334 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
− | | [[ALLIANCE | + | | [[ALLIANCE PETRO CO LLC]] |
| style="text-align: right;" | 5,051.00 | | style="text-align: right;" | 5,051.00 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[ALLIANCE PETRO CO LLC]] | ||
+ | | style="text-align: right;" | 4,707.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 268: | Line 343: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 273: | Line 349: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2000 | + | | 2000 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 215.00 Bbl | | style="text-align: right;" | 215.00 Bbl | ||
Line 279: | Line 356: | ||
| SEE END | | SEE END | ||
|- | |- | ||
− | | 2001 | + | | 2001 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 85.00 Bbl | | style="text-align: right;" | 85.00 Bbl | ||
Line 285: | Line 363: | ||
| | | | ||
|- | |- | ||
− | | 2003 | + | | 2003 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 50.00 Bbl | | style="text-align: right;" | 50.00 Bbl | ||
Line 291: | Line 370: | ||
| | | | ||
|- | |- | ||
− | | 2004 | + | | 2004 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 100.00 Bbl | | style="text-align: right;" | 100.00 Bbl | ||
Line 297: | Line 377: | ||
| | | | ||
|- | |- | ||
− | | 2005 | + | | 2005 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Brine | | Brine | ||
| style="text-align: right;" | 55.00 Bbl | | style="text-align: right;" | 55.00 Bbl | ||
Line 303: | Line 384: | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | Produced Fluid | + | | [[PHILLIPS EXPLORATION INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 5.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0095443 |
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | Produced Fluid | + | | [[PHILLIPS EXPLORATION INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 6.00 Bbl |
− | | | + | | PUBLIC SEWAGE TREATMENT PLANT |
+ | | PA0026310 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | | + | | [[PHILLIPS EXPLORATION INC]] |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 7.00 Bbl | | style="text-align: right;" | 7.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | Produced Fluid | + | | [[PHILLIPS EXPLORATION INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 1.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0020346 |
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | Produced Fluid | + | | [[PHILLIPS EXPLORATION INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 1.00 Bbl | | style="text-align: right;" | 1.00 Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
| PA0026034 | | PA0026034 | ||
|- | |- | ||
− | | 2010- | + | | 2010 |
− | | Produced Fluid | + | | [[PHILLIPS EXPLORATION INC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 2.00 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
+ | | PA0091472 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[PHILLIPS EXPLORATION INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 45.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | Produced Fluid | + | | [[XTO ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 75.00 Bbl | | style="text-align: right;" | 75.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | Produced Fluid | + | | [[XTO ENERGY INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 34.00 Bbl | | style="text-align: right;" | 34.00 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2018 | + | | 2014 |
− | | Produced Fluid | + | | [[XTO ENERGY INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 34 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 27 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 27.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[ALLIANCE PETRO CO LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 50.00 Bbl | | style="text-align: right;" | 50.00 Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
Line 382: | Line 494: | ||
| 576814 | | 576814 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 1997-10-10 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 389: | Line 501: | ||
| 579572 | | 579572 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 1998-09-08 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 424: | Line 536: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-063-31856 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.841117,"lon":-78.960539,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Canoe Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LUELLA M OBERLIN 21 | |
License Status: ACTIVE | |
Spud Date: 1997-10-05 | |
Permit Date: 1997-08-06 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.841117 | |
Longitude: -78.960539 |
Date | Event |
---|---|
1997-08-06 | New Permit Application |
1997-10-05 | Performed Spud Operation |
1997-10-15 | Drilling Completion |
1997-10-20 | Perforation |
2001-02-17 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1997 | PHILLIPS EXPLORATION INC | 880 | 6 | 0.00 | 0 | 0.00 | 0 |
1998 | PHILLIPS EXPLORATION INC | 18114 | 169 | 0.00 | 0 | 0.00 | 0 |
1999 | PHILLIPS EXPLORATION INC | 17855 | 279 | 0.00 | 0 | 0.00 | 0 |
2000 | PHILLIPS EXPLORATION INC | 22420 | 308 | 0.00 | 0 | 0.00 | 0 |
2001 | PHILLIPS EXPLORATION INC | 16352 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | PHILLIPS EXPLORATION INC | 13582 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | PHILLIPS EXPLORATION INC | 11880 | 350 | 0 | 350 | 0.00 | 0 |
2004 | PHILLIPS EXPLORATION INC | 11600 | 362 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS EXPLORATION INC | 9593 | 344 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS EXPLORATION INC | 9,063.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS EXPLORATION INC | 8275.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS EXPLORATION INC | 7193.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 6664.00 | 330 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 6,073.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 5,589.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 4,491.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 5,946.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 5,520.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 5,447.40 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 4,671.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 3,887.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 5,051.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 4,707.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2000 | PHILLIPS EXPLORATION INC | Brine | 215.00 Bbl | Brine or Industrial Waste Treatment Plt | SEE END |
2001 | PHILLIPS EXPLORATION INC | Brine | 85.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2003 | PHILLIPS EXPLORATION INC | Brine | 50.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2004 | PHILLIPS EXPLORATION INC | Brine | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2005 | PHILLIPS EXPLORATION INC | Brine | 55.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 5.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 6.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 2.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2012 | XTO ENERGY INC | Produced Fluid | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 34.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | XTO ENERGY INC | Produced Fluid | 34 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 27 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 27.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 50.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
576814 | Primary Facility | 1997-10-10 | Drilling/Alteration | No Violations Noted | N/RTRNS/9 5/8;NTF/PTS/E&S OK |
579572 | Primary Facility | 1998-09-08 | Routine/Complete Inspection | No Violations Noted | PROD GAS; TAG/TANK/E&S OK |
For data sources see[7]