X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-35075"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-35075
 
| Well ID: 37-063-35075
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.500879, -79.133712 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.500879, -79.133712 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LINDSEY COAL 32
 
| Farm/Lease Name: LINDSEY COAL 32
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
 
| Spud Date: 2006-11-20
 
| Spud Date: 2006-11-20
 
|-
 
|-
 
| Permit Date: 2006-10-13
 
| Permit Date: 2006-10-13
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.500879
 
| Latitude: 40.500879
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-10-13
 +
| New Permit Application
 +
|-
 +
| 2006-11-20
 +
| Performed Spud Operation
 +
|-
 +
| 2006-11-29
 +
| Drilling Completion
 +
|-
 +
| 2006-12-05
 +
| Perforation
 +
|-
 +
| 2007-02-27
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 161: Line 202:
 
| style="text-align: right;" | 1,500.36
 
| style="text-align: right;" | 1,500.36
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[FAIRMAN CORP]]
 +
| style="text-align: right;" | 541.00
 +
| style="text-align: right;" | 178
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 184: Line 234:
 
| 2012
 
| 2012
 
| [[FAIRMAN CORP]]
 
| [[FAIRMAN CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 3,360.00 Bbl
 
| style="text-align: right;" | 3,360.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 191: Line 241:
 
| 2013
 
| 2013
 
| [[FAIRMAN CORP]]
 
| [[FAIRMAN CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 1,680.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[FAIRMAN CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,680.00 Bbl
 
| style="text-align: right;" | 1,680.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 198: Line 255:
 
| 2014
 
| 2014
 
| [[FAIRMAN CORP]]
 
| [[FAIRMAN CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 +
|-
 +
| 2015
 +
| [[FAIRMAN CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2015
 +
| [[FAIRMAN CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 
|-
 
|-
 
|}
 
|}

Latest revision as of 02:36, 16 May 2020

Well Details

Well ID: 37-063-35075
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: FAIRMAN CORP
Well Pad ID:
Farm/Lease Name: LINDSEY COAL 32
License Status:
Spud Date: 2006-11-20
Permit Date: 2006-10-13
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.500879
Longitude: -79.133712

For data sources see[1][2][3]

Well History

Date Event
2006-10-13 New Permit Application
2006-11-20 Performed Spud Operation
2006-11-29 Drilling Completion
2006-12-05 Perforation
2007-02-27 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 FAIRMAN CORP 3,506.00 334 0.00 0 0.00 0
2011 FAIRMAN CORP 2,820.00 334 0.00 0 0.00 0
2012 FAIRMAN CORP 2,572.95 365 0.00 0 0.00 0
2013 FAIRMAN CORP 1,803.00 365 0.00 0 0.00 0
2014 FAIRMAN CORP 1,228.00 303 0.00 0 0.00 0
2015 FAIRMAN CORP 1,499.00 365 0.00 0 0.00 0
2016 FAIRMAN CORP 1,036.00 305 0.00 0 0.00 0
2017 FAIRMAN CORP 532.00 245 0.00 0 0.00 0
2018 FAIRMAN CORP 1,500.36 365 0.00 0 0.00 0
2019 FAIRMAN CORP 541.00 178 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 FAIRMAN CORP Produced Fluid 3,360.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2013 FAIRMAN CORP Produced Fluid 1,680.00 Bbl CENT WASTE TRT FAC NPDES PA0101508
2013 FAIRMAN CORP Produced Fluid 1,680.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 FAIRMAN CORP Produced Fluid 40.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2015 FAIRMAN CORP Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2015 FAIRMAN CORP Produced Fluid 80 Bbl CENT WASTE TRT FAC NPDES PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1605067 Primary Facility 2007-01-08 Routine/Complete Inspection No Violations Noted
1688749 Primary Facility 2007-12-28 Routine/Complete Inspection No Violations Noted PRODUCTING GAS - TAG, TANK, E/S OK
1970692 Primary Facility 2011-05-04 Routine/Complete Inspection No Violations Noted Producing gas. Tag, tank, e&s ok.
2163050 Primary Facility 2013-04-22 Site Restoration No Violations Noted At time of inspection, well equipped for production. According to records, TD attained on 11/29/2006. Well tag present. Access road stable. Brine tank sound, located on gravel pad, appears to be half-full. Equipment noted to be rusty.
2204789 Primary Facility 2013-09-11 Routine/Complete Inspection No Violations Noted At time of inspection, well equipped for production. According to records, date of TD was 11/29/2006. Well tag present, legible. Access road rocked, stable. Brine tank sound. No accelerated erosion or sedimentation issues observed in relation to access road or well site.

For data sources see[7]

References