If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-049-25385 | | Well ID: 37-049-25385 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.869111, -80.265556 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: TAKACH 1 | | Farm/Lease Name: TAKACH 1 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2011-07-28 | | Permit Date: 2011-07-28 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 41.869111 | | Latitude: 41.869111 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-07-28 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-09-16 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-09-26 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2011-10-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2011-10-14 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2011-12-01 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 74: | Line 107: | ||
|}--> | |}--> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2011-10-14 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 98: | Line 154: | ||
| style="text-align: right;" | 272,837.00 | | style="text-align: right;" | 272,837.00 | ||
| style="text-align: right;" | 335 | | style="text-align: right;" | 335 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1343.91 |
| style="text-align: right;" | 306 | | style="text-align: right;" | 306 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 175: | Line 231: | ||
| 2011 | | 2011 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | | + | | Fracing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 400.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
Line 182: | Line 238: | ||
| 2011 | | 2011 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 80.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
Line 189: | Line 245: | ||
| 2011 | | 2011 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 60.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0101508 | | PA0101508 | ||
Line 196: | Line 252: | ||
| 2012 | | 2012 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 17.00 Bbl | | style="text-align: right;" | 17.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 203: | Line 259: | ||
| 2013 | | 2013 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 60.00 Bbl | | style="text-align: right;" | 60.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 210: | Line 266: | ||
| 2016 | | 2016 | ||
| [[ENERVEST OPR LLC]] | | [[ENERVEST OPR LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 69.82 Bbl | | style="text-align: right;" | 69.82 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING |
Well ID: 37-049-25385 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.869111,"lon":-80.265556,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: Elk Creek Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: TAKACH 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-28 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.869111 | |
Longitude: -80.265556 |
Date | Event |
---|---|
2011-07-28 | New Permit Application |
2011-09-16 | Performed Spud Operation |
2011-09-26 | Drilling Completion |
2011-10-14 | Perforation |
2011-10-14 | Performed Stimulation |
2011-12-01 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-10-14 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | ENERVEST OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ENERVEST OPR LLC | 272,837.00 | 335 | 1343.91 | 306 | 0.00 | 0 |
2013 | ENERVEST OPR LLC | 228,613.99 | 365 | 484.98 | 365 | 0.00 | 0 |
2014 | ENERVEST OPR LLC | 157,181.80 | 365 | 47.39 | 365 | 0.00 | 0 |
2015 | ENERVEST OPR LLC | 79,099.00 | 365 | 63.00 | 365 | 0.00 | 0 |
2016 | ENERVEST OPR LLC | 26,661.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERVEST OPR LLC | 7,698.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | ENERVEST OPR LLC | 743.00 | 120 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | ENERVEST OPR LLC | Fracing Fluid Waste | 400.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | ENERVEST OPR LLC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | ENERVEST OPR LLC | Drilling Fluid Waste | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | ENERVEST OPR LLC | Produced Fluid | 17.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | ENERVEST OPR LLC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2016 | ENERVEST OPR LLC | Produced Fluid | 69.82 Bbl | ROAD SPREADING |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004227 | Primary Facility | 2011-09-19 | Drilling/Alteration | No Violations Noted | |
2004510 | Primary Facility | 2011-09-21 | Drilling/Alteration | No Violations Noted | |
2019792 | Primary Facility | 2011-11-16 | Routine/Complete Inspection | No Violations Noted | New gas well just finished on this well pad- no production equipment in place yet- permit and E&S Plan posted- BMPs in place as per the E&S Plan- rock access road in good shape- temporary stablization with straw in place. |
2091161 | Primary Facility | 2012-08-02 | Site Restoration | No Violations Noted | |
2093848 | Primary Facility | 2012-08-15 | Routine/Complete Inspection | No Violations Noted | |
2328549 | Primary Facility | 2014-12-11 | Routine/Complete Inspection | No Violations Noted | |
2540603 | Primary Facility | 2016-12-01 | Administrative/File Review | No Violations Noted | production review |
2647165 | Primary Facility | 2017-10-13 | Routine/Partial Inspection | No Violations Noted | Inspected location, 2 steel tanks sit in containment, well is equipped with 8 5/8's surface casing with the annulus vented to the tank, 4 1/2 production casing which is shut-in and 2 inch tubing which is open to separator, separator has 110 psi on it with a current chart, well is producing. |
For data sources see[8]