If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-123-24054 | | Well ID: 37-123-24054 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: FISHER & YOUNG INC | + | | Farm/Lease Name: FISHER & YOUNG INC |
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 1973-10-01 | | Permit Date: 1973-10-01 | ||
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: | | Latitude: | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1973-10-01 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 89: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 86: | Line 115: | ||
|- | |- | ||
| 2007 | | 2007 | ||
− | | | + | | [[J & L ALLEN INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 95: | Line 124: | ||
|- | |- | ||
| 2010 | | 2010 | ||
− | | | + | | [[J & L ALLEN INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 104: | Line 133: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | | + | | [[J & L ALLEN INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 185: | Line 214: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 190: | Line 220: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | Produced Fluid | + | | [[J & L ALLEN INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 17.00 Bbl | | style="text-align: right;" | 17.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
− | | Produced Fluid | + | | [[J & L ALLEN INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 0.03 Bbl | | style="text-align: right;" | 0.03 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | Produced Fluid | + | | [[J & L ALLEN INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 0.23 Bbl | | style="text-align: right;" | 0.23 Bbl | ||
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2016 | + | | 2015 |
− | | Produced Fluid | + | | [[J & L ALLEN INC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 0.46 Bbl | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[J & L ALLEN INC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 5.77 Bbl | | style="text-align: right;" | 5.77 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[J & L ALLEN INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 3.08 Bbl | | style="text-align: right;" | 3.08 Bbl | ||
| REUSE AT A CONVENTIONAL WELL SITE IN PA | | REUSE AT A CONVENTIONAL WELL SITE IN PA |
Well ID: 37-123-24054 | |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Brokenstraw Township | |
Operator Name: J & L ALLEN INC | |
Well Pad ID: | |
Farm/Lease Name: FISHER & YOUNG INC | |
License Status: | |
Spud Date: | |
Permit Date: 1973-10-01 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: | |
Longitude: |
Date | Event |
---|---|
1973-10-01 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | J & L ALLEN INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | J & L ALLEN INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | J & L ALLEN INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | J & L ALLEN INC | 0.04 | 35 | 2.69 | 35 | 0.00 | 0 |
2013 | J & L ALLEN INC | 0.12 | 27 | 0.35 | 27 | 0.00 | 0 |
2014 | J & L ALLEN INC | 0.88 | 36 | 2.69 | 36 | 0.00 | 0 |
2015 | J & L ALLEN INC | 0.38 | 1 | 5.76 | 76 | 0.00 | 0 |
2016 | J & L ALLEN INC | 5.65 | 240 | 11.71 | 240 | 0.00 | 0 |
2017 | J & L ALLEN INC | 5.46 | 117 | 5.90 | 117 | 0.00 | 0 |
2018 | J & L ALLEN INC | 4.31 | 188 | 11.92 | 175 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | J & L ALLEN INC | Produced Fluid | 17.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2013 | J & L ALLEN INC | Produced Fluid | 0.03 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | J & L ALLEN INC | Produced Fluid | 0.23 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | J & L ALLEN INC | Produced Fluid | 0.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | J & L ALLEN INC | Produced Fluid | 5.77 Bbl | ROAD SPREADING | |
2018 | J & L ALLEN INC | Produced Fluid | 3.08 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[6]