X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22200"

m
m
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22200
 
| Well ID: 37-003-22200
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.525486, -79.712216 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.525486, -79.712216 | width=100% | height=100% }}  
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]

Revision as of 14:31, 26 June 2014

Well Details

Well ID: 37-003-22200
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2011-12-09
Last Permit Date: 2011-12-09
Spud Date: 2012-01-10
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.525486
Longitude: -79.712216

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 45600.0 365.0 0.0 0.0 0.0 0.0
2012-0 49507.0 214.0 0.0 0.0 735.0 214.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 DRILLING FLUID WASTE 390.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 FRACING FLUID WASTE 1770.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 PRODUCED FLUID 2720.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 DRILLING FLUID WASTE 2680.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2012-0 DRILLING FLUID WASTE 390.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 FRACING FLUID WASTE 1770.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 PRODUCED FLUID 2720.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2012-0 DRILLING FLUID WASTE 2680.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2013-0 PRODUCED FLUID 325.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2035016 2012-01-04 No Violations Noted SITE IS BUILT FOR THIS HORIZONTAL OIL WELL. PIT IS FENCED. SITE AND E&S OK.
2035180 2012-01-10 No Violations Noted SITE IS BUILT. PIT IS NOT LINED. WELL IS NOT SPUDDED.
2041973 2012-01-20 No Violations Noted DRILLING TOHOLE FOR THIS HORIZONTAL OIL WELL. SITE AND E&S, OK.
2041996 2012-02-07 No Violations Noted TOP HOLE COMPLETE. ABIGGER RIG WILL FINNISH. SITE AND E&S, OK.
2052683 2012-02-29 No Violations Noted RIG IS IN AND UP, BUT NOT DRILLING.

SITE AND E&S, OK.

2054235 2012-03-06 No Violations Noted US ENERGY RIG DRILLED A PILOT HOLE TO 3450', AND THE CEMENTED BACK TO IT'S KOP.
2054295 2012-02-16 No Violations Noted TOP HOLE FINISHED. BOTTOM HOLE RIG HAS NOT ARRIVED.

SITE IS OK.

2055012 2012-03-21 No Violations Noted PRODUCTION CASING IS IN. FRAC PIT IS BUILT BUT NOT LINED.
2064165 2012-04-11 No Violations Noted FRAC PIT IS CONSTRUCTED, LINED, AND HOLDING WATER.

THE BOTTOM HOLE RIG HAS NOT ARRIVED.

2064312 2012-04-27 No Violations Noted THIS IS A HORIZONTAL OIL AND GAS WELL. THE WELL IS FRACED. THE WELL IS SHUT IN.

PIT LEVEL OK.

2064316 2012-04-19 No Violations Noted HORIZONTAL LEG IS COMPLETE. DRILL RIG IS GONE. SERVICE RIG ON THE PAD. WELL WILL BE FRACED 4/23/12.
2074450 2012-05-21 No Violations Noted THE WELL IS CMPLETE. RODS AND TUBING ARE IN BUT THERE IS NO JACK. STORAGE TANKS ARE SET. PIT IS BURIED.
2078185 2012-06-14 No Violations Noted THIS SHALLOW HORIZONTAL OIL WELL IS HOOKED UP AND PPRODUCING.

THE SITE RESTORATION IS ALMOST COMPLETE.

2084785 2012-07-19 No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. The site was restored and meets the 70% uniform vegetative coverage criteria.

The only issue noted was that the silt sock located near the tank berm was covered over with rock and soil, which should be removed.

2085956 2012-07-09 No Violations Noted WELL IS HOOKED UP AND OPERATING.
2143115 2013-02-07 Allegheny Plum Boro No Violations Noted

References