If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22200 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.525486,"lon":-79.712217,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: SEDAT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-12-09 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.525486 | |
Longitude: -79.712217 |
Date | Event |
---|---|
2011-12-09 | New Permit Application |
2012-01-10 | Performed Spud Operation |
2012-03-17 | Drilling Completion |
2012-04-20 | Perforation |
2012-06-04 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 49,507.00 | 214 | 735.00 | 214 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 45,600.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 25,402.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 15,028.79 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 1,010.96 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 660.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 249.52 | 212 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 263.11 | 215 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,770.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Produced Fluid | 2,720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 390.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 2,680.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2013 | PENNECO OIL CO INC | Produced Fluid | 325.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 325 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2035016 | Primary Facility | 2012-01-04 | Drilling/Alteration | No Violations Noted | SITE IS BUILT FOR THIS HORIZONTAL OIL WELL. PIT IS FENCED. SITE AND E&S OK. |
2035180 | Primary Facility | 2012-01-10 | Drilling/Alteration | No Violations Noted | SITE IS BUILT. PIT IS NOT LINED. WELL IS NOT SPUDDED. |
2041973 | Primary Facility | 2012-01-20 | Drilling/Alteration | No Violations Noted | DRILLING TOHOLE FOR THIS HORIZONTAL OIL WELL. SITE AND E&S, OK. |
2041996 | Primary Facility | 2012-02-07 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. ABIGGER RIG WILL FINNISH. SITE AND E&S, OK. |
2052683 | Primary Facility | 2012-02-29 | Drilling/Alteration | No Violations Noted | RIG IS IN AND UP, BUT NOT DRILLING. |
2054235 | Primary Facility | 2012-03-06 | Drilling/Alteration | No Violations Noted | US ENERGY RIG DRILLED A PILOT HOLE TO 3450', AND THE CEMENTED BACK TO IT'S KOP. |
2054295 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | TOP HOLE FINISHED. BOTTOM HOLE RIG HAS NOT ARRIVED. |
2055012 | Primary Facility | 2012-03-21 | Drilling/Alteration | No Violations Noted | PRODUCTION CASING IS IN. FRAC PIT IS BUILT BUT NOT LINED. |
2064165 | Primary Facility | 2012-04-11 | Drilling/Alteration | No Violations Noted | FRAC PIT IS CONSTRUCTED, LINED, AND HOLDING WATER. |
2064312 | Primary Facility | 2012-04-27 | Drilling/Alteration | No Violations Noted | THIS IS A HORIZONTAL OIL AND GAS WELL. THE WELL IS FRACED. THE WELL IS SHUT IN. |
2064316 | Primary Facility | 2012-04-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL LEG IS COMPLETE. DRILL RIG IS GONE. SERVICE RIG ON THE PAD. WELL WILL BE FRACED 4/23/12. |
2074450 | Primary Facility | 2012-05-21 | Drilling/Alteration | No Violations Noted | THE WELL IS CMPLETE. RODS AND TUBING ARE IN BUT THERE IS NO JACK. STORAGE TANKS ARE SET. PIT IS BURIED. |
2078185 | Primary Facility | 2012-06-14 | Drilling/Alteration | No Violations Noted | THIS SHALLOW HORIZONTAL OIL WELL IS HOOKED UP AND PPRODUCING. |
2084785 | Primary Facility | 2012-07-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. The site was restored and meets the 70% uniform vegetative coverage criteria. |
2085956 | Primary Facility | 2012-07-09 | Drilling/Alteration | No Violations Noted | WELL IS HOOKED UP AND OPERATING. |
2143115 | Primary Facility | 2013-02-07 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL OIL AND GAS WELL. JACK IS OPERATING. SITE IS OK. |
2289164 | Primary Facility | 2014-07-23 | Routine/Complete Inspection | No Violations Noted | THIS WELL IS A SHALLOW HORIZONTAL OIL AND GAS WELL. THE JACK HAS BEEN REMOVED AND THE WELL IS MOSTLY PRODUCING GAS. |
2678148 | Primary Facility | 2018-01-04 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition. |
2799279 | Primary Facility | 2018-11-06 | Administrative/File Review | No Violations Noted | Well record was reviewed because this well is located within 1/2 miles of a proposed disposal well. The surface, coal, and intermediate casings are all cemented to the surface. The well record is in good order. |
For data sources see[7]