If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-37291 | | Well ID: 37-063-37291 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.435056, -79.127544 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Indiana_County,_Pennsylvania|Indiana]] | ||
+ | |- | ||
+ | | Municipality: [[West Wheatfield Township,_Indiana_County,_Pennsylvania|West Wheatfield Township]] | ||
|- | |- | ||
| Operator Name: [[PENN VIEW EXPLORATION CORP]] | | Operator Name: [[PENN VIEW EXPLORATION CORP]] | ||
|- | |- | ||
− | | | + | | Well Pad ID: |
+ | |- | ||
+ | | Farm/Lease Name: ST CLAIR 2 | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
| Spud Date: 2012-02-09 | | Spud Date: 2012-02-09 | ||
|- | |- | ||
− | | Unconventional: | + | | Permit Date: 2011-12-28 |
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: N | ||
|- | |- | ||
− | | | + | | Configuration: Vertical Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.435056 |
|- | |- | ||
| Longitude: -79.127544 | | Longitude: -79.127544 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-12-28 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-02-09 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-02-15 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-02-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2012-05-23 | ||
+ | | NEWLY DRILLED | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | | + | | 2011 |
− | | style="text-align:right;" | | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 4,567.00 | ||
+ | | style="text-align: right;" | 184 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 6,095.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2014 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 4,709.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | style="text-align:right;" | 0.0 | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 3,738.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0.0 | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 2,003.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 540.00 | ||
+ | | style="text-align: right;" | 334 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 404.00 | ||
+ | | style="text-align: right;" | 242 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | style="text-align: right;" | 193.00 | ||
+ | | style="text-align: right;" | 242 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | 295. | + | | Produced Fluid |
− | + | | style="text-align: right;" | 295.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2013 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 456 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 456.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 250.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095273 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | + | | style="text-align: right;" | 250 Bbl | |
− | | | + | | CENT WASTE TRT FAC NPDES |
| PA0095273 | | PA0095273 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2014 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 91.00 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 70 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095273 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | | + | | [[PENN VIEW EXPLORATION CORP]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | + | | style="text-align: right;" | 70.00 Bbl | |
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
| PA0095273 | | PA0095273 | ||
− | | | + | |- |
− | | | + | | 2015 |
− | | | + | | [[PENN VIEW EXPLORATION CORP]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 80.00 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 40.00 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENN VIEW EXPLORATION CORP]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 100.00 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2041291 | | 2041291 | ||
+ | | Primary Facility | ||
| 2012-02-08 | | 2012-02-08 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | Site visit was due to spud notification. | + | | Site visit was due to spud notification. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2042702 | | 2042702 | ||
+ | | Primary Facility | ||
| 2012-02-14 | | 2012-02-14 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8¿) was set at 421¿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7¿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. | | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8¿) was set at 421¿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7¿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. | ||
− | |||
− | |||
|- | |- | ||
| 2043974 | | 2043974 | ||
+ | | Primary Facility | ||
| 2012-02-16 | | 2012-02-16 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | ||
− | |||
− | |||
|- | |- | ||
| 2043985 | | 2043985 | ||
+ | | Primary Facility | ||
| 2012-02-16 | | 2012-02-16 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. | ||
− | |||
− | |||
|- | |- | ||
| 2048847 | | 2048847 | ||
+ | | Primary Facility | ||
| 2012-03-06 | | 2012-03-06 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | Site visit was part of routine inspection. | + | | Site visit was part of routine inspection. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2151616 | | 2151616 | ||
+ | | Primary Facility | ||
| 2013-03-20 | | 2013-03-20 | ||
− | | | + | | Drilling/Alteration |
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 “) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8”) was set at 431’. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7”) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet. | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-063-37291 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.435056,"lon":-79.127544,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: West Wheatfield Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: ST CLAIR 2 | |
License Status: | |
Spud Date: 2012-02-09 | |
Permit Date: 2011-12-28 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.435056 | |
Longitude: -79.127544 |
Date | Event |
---|---|
2011-12-28 | New Permit Application |
2012-02-09 | Performed Spud Operation |
2012-02-15 | Drilling Completion |
2012-02-21 | Perforation |
2012-05-23 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PENN VIEW EXPLORATION CORP | 4,567.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2013 | PENN VIEW EXPLORATION CORP | 6,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENN VIEW EXPLORATION CORP | 4,709.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENN VIEW EXPLORATION CORP | 3,738.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENN VIEW EXPLORATION CORP | 2,003.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | PENN VIEW EXPLORATION CORP | 540.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | PENN VIEW EXPLORATION CORP | 404.00 | 242 | 0.00 | 0 | 0.00 | 0 |
2019 | PENN VIEW EXPLORATION CORP | 193.00 | 242 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENN VIEW EXPLORATION CORP | Produced Fluid | 295.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 456 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | PENN VIEW EXPLORATION CORP | Produced Fluid | 456.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 250.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 250 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | PENN VIEW EXPLORATION CORP | Produced Fluid | 91.00 Bbl | ROAD SPREADING | |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 70 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2015 | PENN VIEW EXPLORATION CORP | Produced Fluid | 80.00 Bbl | ROAD SPREADING | |
2016 | PENN VIEW EXPLORATION CORP | Produced Fluid | 40.00 Bbl | ROAD SPREADING | |
2017 | PENN VIEW EXPLORATION CORP | Produced Fluid | 100.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2041291 | Primary Facility | 2012-02-08 | Routine/Complete Inspection | No Violations Noted | Site visit was due to spud notification. |
2042702 | Primary Facility | 2012-02-14 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8¿) was set at 421¿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7¿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet. |
2043974 | Primary Facility | 2012-02-16 | Routine/Complete Inspection | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
2043985 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe. |
2048847 | Primary Facility | 2012-03-06 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2151616 | Primary Facility | 2013-03-20 | Drilling/Alteration | No Violations Noted | First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 “) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8”) was set at 431’. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7”) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet. |
For data sources see[7]