X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24646"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24646
 
| Well ID: 37-129-24646
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.192245, -79.525529 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.192245, -79.525529 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: CROSBY 001
 
| Farm/Lease Name: CROSBY 001
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 01/29/2002
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/21/2001
+
| Permit Date: 2001-12-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.192245
 
| Latitude: 40.192245
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2001-12-21
 +
| New Permit Application
 +
|-
 +
| 2002-01-29
 +
| Performed Spud Operation
 +
|-
 +
| 2002-02-06
 +
| Drilling Completion
 +
|-
 +
| 2002-02-11
 +
| Perforation
 +
|-
 +
| 2002-05-08
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 2002
 
| 2002
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 13,838.00
+
| style="text-align: right;" | 13838
 
| style="text-align: right;" | 299
 
| style="text-align: right;" | 299
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 12,302.00
+
| style="text-align: right;" | 12302
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 358
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EDWARD G KRIEBEL GAS CO]]
+
| style="text-align: right;" |
| style="text-align: right;" | 13,843.00
+
| style="text-align: right;" | 13843
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 8,158.00
+
| style="text-align: right;" | 8158
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 5,987.00
+
| style="text-align: right;" | 5987.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 4,553.00
+
| style="text-align: right;" | 4553.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 4,375.00
+
| style="text-align: right;" | 4375.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 3,801.00
+
| style="text-align: right;" | 3801.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 137: Line 203:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 146: Line 212:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 155: Line 221:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 164: Line 230:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 173: Line 239:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 182: Line 248:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 191: Line 257:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 200: Line 266:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 275:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 1,553.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 298:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 304:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2002-A00
+
| 2002
 +
| [[KRIEBEL MINERALS INC]]
 
| Fracking Fluid
 
| Fracking Fluid
 
| style="text-align: right;" | 1,268.00 Bbl
 
| style="text-align: right;" | 1,268.00 Bbl
Line 234: Line 311:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2004-A00
+
| 2004
 +
|
 
| Brine
 
| Brine
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 240: Line 318:
 
|  
 
|  
 
|-
 
|-
| 2004-A00
+
| 2004
 +
|
 
| Brine
 
| Brine
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 246: Line 325:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2005-A00
+
| 2005
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
Line 252: Line 332:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 30.00 Bbl
+
| style="text-align: right;" | 40.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
|  
+
| PA0091472
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 30.00 Bbl
 
| Brine or Industrial Waste Treatment Plt
 
| Brine or Industrial Waste Treatment Plt
| PA0091472
+
|  
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1.00 Bbl
 
| style="text-align: right;" | 1.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2012-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 301: Line 386:
 
| 1119551
 
| 1119551
 
| Primary Facility
 
| Primary Facility
| 02/01/2002
+
| 2002-02-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 308: Line 393:
 
| 1160843
 
| 1160843
 
| Primary Facility
 
| Primary Facility
| 08/19/2002
+
| 2002-08-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 327: Line 412:
 
| 303935
 
| 303935
 
| 02/01/2002
 
| 02/01/2002
| 02/25/2002
+
| 2002-02-01
 
| 78.83COALCSG - Improper coal protective casing and cementing procedures
 
| 78.83COALCSG - Improper coal protective casing and cementing procedures
 
| Administrative
 
| Administrative
Line 349: Line 434:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 02/25/2002
+
| 2002-02-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 360: Line 445:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 05:40, 16 May 2020

Well Details

Well ID: 37-129-24646
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Mount Pleasant Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: CROSBY 001
License Status: ACTIVE
Spud Date:
Permit Date: 2001-12-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.192245
Longitude: -79.525529

For data sources see[1][2][3]

Well History

Date Event
2001-12-21 New Permit Application
2002-01-29 Performed Spud Operation
2002-02-06 Drilling Completion
2002-02-11 Perforation
2002-05-08 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 KRIEBEL MINERALS INC 13838 299 0.00 0 0.00 0
2003 KRIEBEL MINERALS INC 12302 358 0.00 0 0.00 0
2004 13843 365 0.00 0 0.00 0
2005 KRIEBEL MINERALS INC 8158 365 0.00 0 0.00 0
2006 KRIEBEL MINERALS INC 5987.00 365 0.00 0 0.00 0
2007 KRIEBEL MINERALS INC 4553.00 365 0.00 0 0.00 0
2008 KRIEBEL MINERALS INC 4375.00 366 0.00 0 0.00 0
2009 KRIEBEL MINERALS INC 3801.00 334 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 3,981.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 2,892.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 2,561.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 3,172.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 3,106.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 2,271.00 334 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 1,885.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 1,673.00 334 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 1,531.00 334 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 1,553.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2002 KRIEBEL MINERALS INC Fracking Fluid 1,268.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2004 Brine 100.00 Bbl Other
2004 Brine 20.00 Bbl Other PA0091472
2005 KRIEBEL MINERALS INC Brine 30.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2006 KRIEBEL MINERALS INC Brine 40.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2006 KRIEBEL MINERALS INC Brine 30.00 Bbl Brine or Industrial Waste Treatment Plt
2010 KRIEBEL MINERALS INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 KRIEBEL MINERALS INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 KRIEBEL MINERALS INC Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1119551 Primary Facility 2002-02-01 Drilling/Alteration Violation(s) Noted Drilled >50' below coal before setting casing; E&S, Pits OK
1160843 Primary Facility 2002-08-19 Routine/Complete Inspection No Violations Noted equipped/tank&tag ok/E&S advice - lacking 70% veg.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1119551 303935 02/01/2002 2002-02-01 78.83COALCSG - Improper coal protective casing and cementing procedures Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
303935 95486 NOV - Notice of Violation Comply/Closed 2002-02-25

For data sources see[7]

References