X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27461"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-27461
 
| Well ID: 37-129-27461
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.439228, -79.487913 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.439228, -79.487913 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: CHELEN/BASH UNIT 2 1
 
| Farm/Lease Name: CHELEN/BASH UNIT 2 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2008-07-15
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-05-13
 
| Permit Date: 2008-05-13
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.439228
 
| Latitude: 40.439228
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-05-13
 +
| New Permit Application
 +
|-
 +
| 2008-07-15
 +
| Performed Spud Operation
 +
|-
 +
| 2008-07-18
 +
| Drilling Completion
 +
|-
 +
| 2008-10-07
 +
| Perforation
 +
|-
 +
| 2009-08-20
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2008
 
| 2008
 
| [[NORTHEASTERN OPR CO INC]]
 
| [[NORTHEASTERN OPR CO INC]]
| style="text-align: right;" | 2,663.00
+
| style="text-align: right;" | 2663.00
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2009
 
| 2009
 
| [[NORTHEASTERN OPR CO INC]]
 
| [[NORTHEASTERN OPR CO INC]]
| style="text-align: right;" | 4,801.00
+
| style="text-align: right;" | 4801.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 158: Line 199:
 
|-
 
|-
 
| 2016
 
| 2016
| style="text-align: right;" |
+
| [[NORTHEASTERN OPR CO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 194: Line 235:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 199: Line 241:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[NORTHEASTERN OPR CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2014-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[NORTHEASTERN OPR CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 21 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2014
 +
| [[NORTHEASTERN OPR CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 21.00 Bbl
 
| style="text-align: right;" | 21.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 10:36, 16 May 2020

Well Details

Well ID: 37-129-27461
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: NORTHEASTERN OPR CO INC
Well Pad ID:
Farm/Lease Name: CHELEN/BASH UNIT 2 1
License Status: ACTIVE
Spud Date:
Permit Date: 2008-05-13
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.439228
Longitude: -79.487913

For data sources see[1][2][3]

Well History

Date Event
2008-05-13 New Permit Application
2008-07-15 Performed Spud Operation
2008-07-18 Drilling Completion
2008-10-07 Perforation
2009-08-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 NORTHEASTERN OPR CO INC 2663.00 184 0.00 0 0.00 0
2009 NORTHEASTERN OPR CO INC 4801.00 365 0.00 0 0.00 0
2010 NORTHEASTERN OPR CO INC 3,296.00 365 0.00 0 0.00 0
2011 NORTHEASTERN OPR CO INC 3,090.00 365 0.00 0 0.00 0
2012 NORTHEASTERN OPR CO INC 2,140.00 365 0.00 0 0.00 0
2013 NORTHEASTERN OPR CO INC 1,542.00 365 0.00 0 0.00 0
2014 NORTHEASTERN OPR CO INC 775.00 365 0.00 0 0.00 0
2015 NORTHEASTERN OPR CO INC 411.00 365 0.00 0 0.00 0
2016 NORTHEASTERN OPR CO INC 0.00 0 0.00 0 0.00 0
2017 NORTHEASTERN OPR CO INC 554.00 365 0.00 0 0.00 0
2018 NORTHEASTERN OPR CO INC 1,318.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 NORTHEASTERN OPR CO INC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2014 NORTHEASTERN OPR CO INC Produced Fluid 21 Bbl CENT WASTE TRT FAC NPDES PA0095273
2014 NORTHEASTERN OPR CO INC Produced Fluid 21.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1721220 Primary Facility 2008-07-16 Drilling/Alteration No Violations Noted Well spudded 7/15/08. Rig @ 1076' @ time of inspection. Pit/freeboard/E&S controls OK.
1973849 Primary Facility 2010-09-14 Site Restoration No Violations Noted Tag located. Tank is sound. E&S ok. Vegetation is well established. Site is restored.

For data sources see[7]

References