X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27483"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-27483
 
| Well ID: 37-129-27483
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.140856, -79.552919 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.140856, -79.552919 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: T MARHEFKA 1
 
| Farm/Lease Name: T MARHEFKA 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 07/15/2008
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 5/29/2008
+
| Permit Date: 2008-05-29
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.140856
 
| Latitude: 40.140856
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-05-29
 +
| New Permit Application
 +
|-
 +
| 2008-07-15
 +
| Performed Spud Operation
 +
|-
 +
| 2008-07-22
 +
| Drilling Completion
 +
|-
 +
| 2008-07-28
 +
| Perforation
 +
|-
 +
| 2011-05-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 131:
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 74: Line 140:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 83: Line 149:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 92: Line 158:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 101: Line 167:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 110: Line 176:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 119: Line 185:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 128: Line 194:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 137: Line 203:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 146: Line 212:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 155: Line 221:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 169: Line 235:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 174: Line 241:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
Line 180: Line 248:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2009-A00
+
| 2009
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 186: Line 255:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
|-
 +
| 2010
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2010-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2011-A00
+
| 2011
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2011-A00
+
| 2014
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 50.00 Bbl
+
| Produced Fluid
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 25.00 Bbl
| PA0095443
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2014
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 25 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2015
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 
|-
 
|-
| 2014-A00
+
| 2015
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 25.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 10.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2016-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 +
|-
 +
| 2016
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
 
|}
 
|}
Line 241: Line 351:
 
| 1721218
 
| 1721218
 
| Primary Facility
 
| Primary Facility
| 07/16/2008
+
| 2008-07-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 276: Line 386:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 10:38, 16 May 2020

Well Details

Well ID: 37-129-27483
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: East Huntingdon Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: T MARHEFKA 1
License Status:
Spud Date:
Permit Date: 2008-05-29
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.140856
Longitude: -79.552919

For data sources see[1][2][3]

Well History

Date Event
2008-05-29 New Permit Application
2008-07-15 Performed Spud Operation
2008-07-22 Drilling Completion
2008-07-28 Perforation
2011-05-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 KRIEBEL MINERALS INC 3,288.00 122 0.00 0 0.00 0
2009 KRIEBEL MINERALS INC 9,727.00 334 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 9,259.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 5,970.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 4,228.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 3,094.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 2,522.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 1,915.00 334 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 1,615.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 1,525.00 334 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 1,114.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 KRIEBEL MINERALS INC Brine 110.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 KRIEBEL MINERALS INC Brine 55.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2010 KRIEBEL MINERALS INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 KRIEBEL MINERALS INC Produced Fluid 25.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 KRIEBEL MINERALS INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 KRIEBEL MINERALS INC Produced Fluid 25.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2014 KRIEBEL MINERALS INC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 KRIEBEL MINERALS INC Produced Fluid 25 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 KRIEBEL MINERALS INC Produced Fluid 10 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 KRIEBEL MINERALS INC Produced Fluid 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 20 Bbl CENT WASTE TRT FAC NPDES PA0095273
2019 KRIEBEL WELLS DISSOLUTION CO LLC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1721218 Primary Facility 2008-07-16 Drilling/Alteration No Violations Noted Rig had just spudded well in @ time of this inspection. Pit/freeboard/E&S controls OK.

For data sources see[7]

References