Difference between revisions of "37-129-28138"

m
m
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-129-28138
+
| Well ID: 37-129-28138
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.149177, -79.350477 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.149178, -79.350478 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Donegal Township,_Westmoreland_County,_Pennsylvania|Donegal Township]]
 +
|-
 +
| Operator Name: [[XPR RESOURCES LLC]]
 +
|-
 +
| Well Pad ID: [[149187]]
 +
|-
 +
| Farm/Lease Name: RIAL UNIT
 +
|-
 +
| License Status: Plugged and Abandoned
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Spud Date: 2010-01-15
 
|-
 
|-
| Municipality: [[Donegal Township, Westmoreland County, Pennsylvania|Donegal Township]]
+
| Permit Date: 2009-12-17
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC|WPX ENERGY APPALACHIA LLC]]
+
| Well Type: GAS
 
|-
 
|-
| Farm/Lease Name: RIAL UNIT 1-1
+
| Unconventional Well: Y
 
|-
 
|-
| First Permit Date: 2009-12-17
+
| Configuration: Vertical Well
 
|-
 
|-
| Last Permit Date: 2009-12-17
+
| Conservation: Yes
 
|-
 
|-
| Spud Date: 2009-12-29
+
| Latitude: 40.149178
 
|-
 
|-
| Unconventional: Yes
+
| Longitude: -79.350478
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Horizontal: No
+
| 2009-12-17
 +
| New Permit Application
 
|-
 
|-
| Producing: Yes
+
| 2009-12-29
 +
| Performed Spud Operation
 
|-
 
|-
| Violations: 1
+
| 2010-02-04
 +
| Drilling Completion
 
|-
 
|-
| Latitude: 40.149177
+
| 2011-01-13
 +
| Newly Drilled
 
|-
 
|-
| Longitude: -79.350477
+
| 2015-08-31
 +
| Begin Plugging
 +
|-
 +
| 2015-09-11
 +
| Finished Plugging
 +
|-
 +
| 2019-05-31
 +
| Fully Plugged
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2009
 +
| [[LONGFELLOW ENERGY LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010
 +
| [[LONGFELLOW ENERGY LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Period
!scope="col" | DATE
+
!scope="col" | Operator
!scope="col" | DESCRIPTION
+
!scope="col" | Waste Type
!scope="col" | COMMENT
+
!scope="col" | Quantity
!scope="col" | VIOLATION ID
+
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2015
 +
| [[XPR RESOURCES LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 37,223.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 1863366
+
| 2015
| 2009-12-30
+
| [[XPR RESOURCES LLC]]
| No Violations Noted
+
| Servicing Fluid
| MARCELLUS
+
| style="text-align: right;" | 1,320.00 Bbl
NORTHEAST RIG 3 DRILLING AHEAD. FLOW LINE SECURE, PIT FENCED, LOG BOOK AND E&S PLAN WERE PRODUCED UPON REQUEST
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
|  
+
| WMGR123SW005
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1854277
 
| 1854277
 +
| Primary Facility
 
| 2010-01-07
 
| 2010-01-07
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well has been spudded and the site is currently being prepared for the rig to move on site.
 
| Well has been spudded and the site is currently being prepared for the rig to move on site.
Access road is in good condition
 
BMPs are in place and functioning properly.
 
All E&S controls are in place and functioning properly.
 
 
|
 
|-
 
 
|-
 
|-
 
| 1858602
 
| 1858602
 +
| Primary Facility
 
| 2010-01-25
 
| 2010-01-25
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
|  
 
|  
| 580118
 
|-
 
|-
 
| 1858602
 
| 2010-01-25
 
| Violation(s) Noted
 
|
 
| 580118
 
|-
 
 
|-
 
|-
 
| 1863359
 
| 1863359
 +
| Primary Facility
 
| 2010-01-26
 
| 2010-01-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| MARCELLUS
 
| MARCELLUS
HWD RIG 3 MUDDING UP, PART OF SHAKER ASSEMBLY IS BEING USED FOR SOMETHING ELSE. CM HAS ROUGHNECKS RIGGING UP A SLIDE TO CONNECT SHAKERS TO PIT
 
|
 
|-
 
 
|-
 
|-
 
| 1863364
 
| 1863364
 +
| Primary Facility
 
| 2010-02-16
 
| 2010-02-16
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| MARCELLUS
 
| MARCELLUS
HWD RIG 3 STACKED OUT. NOBODY ONSITE, EVERYTHING LOOKS OK
 
|
 
 
|-
 
|-
 +
| 1863366
 +
| Primary Facility
 +
| 2009-12-30
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS
 
|-
 
|-
 
| 1871915
 
| 1871915
 +
| Primary Facility
 
| 2010-03-24
 
| 2010-03-24
 +
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
| The Department conducted an inspection in response to the violations noted on 1/25/10. Specifically, E&S violations were written for filter fabric fence down, overwhelmed controls, and improperly functioning controls.  All the violations have been abated.  
+
| The Department conducted an inspection in response to the violations noted on 1/25/10. Specifically, E&S violations were written for filter fabric fence down, overwhelmed controls, and improperly functioning controls.  All the violations have been abated.
Access road and BMPs are in place and functioning properly.
 
All E&S controls are in place and functioning properly.  The drill pit is going to have a ditch dug to intercept water that was running into it.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1894953
 
| 1894953
 +
| Primary Facility
 
| 2010-06-23
 
| 2010-06-23
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| MARCELLUS PITS EMPTY,WELL NOT PRODUCING,SITE NOT RESTORED, NO EQUIPMENT ONSITE.
 
| MARCELLUS PITS EMPTY,WELL NOT PRODUCING,SITE NOT RESTORED, NO EQUIPMENT ONSITE.
|
 
|-
 
 
|-
 
|-
 
| 1916493
 
| 1916493
 +
| Primary Facility
 
| 2010-08-15
 
| 2010-08-15
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| WELL CAPPED, PIT FENCED, RIG GONE, SITE CLEAN
 
| WELL CAPPED, PIT FENCED, RIG GONE, SITE CLEAN
|
 
|-
 
 
|-
 
|-
 
| 1982094
 
| 1982094
 +
| Primary Facility
 
| 2011-06-03
 
| 2011-06-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was for a routine inspection.  Site is permitted to be reconstructed and redrilled.
 
| Site visit was for a routine inspection.  Site is permitted to be reconstructed and redrilled.
Well currently on site appears to be drilled but not completed.  Site was previous owned by Longfellow Energy and now is owned by Williams.  Pit is still in place with cuttings and fluid.  Impoundment has water, no freeboard issues.
 
Drilling is reported as completed on 2-4-10.  No attempts at restoration have been attempted.
 
Erosion of the site is taking place on the north corner of the site.  Sediment is being contained by sed trap and vegetation.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2016811
 
| 2016811
 +
| Primary Facility
 
| 2011-11-03
 
| 2011-11-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was due to spud notification.
 
| Site visit was due to spud notification.
Rig on site drilling top hole.
 
HRI was actively building fresh water storage impoundment.
 
Toes of slope had been hydroseeded early in the morning.
 
BMPs in place and working properly.
 
Pits dug but not yet lined.
 
No violations noted.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2024898
 
| 2024898
 +
| Primary Facility
 
| 2011-11-23
 
| 2011-11-23
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
PATTERSON RIG 480 DRILLING ON WILLIAMS PAD.  CONDUCTOR NOT SET.
 
E&S, PITS, AND HOUSE KEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2026133
 
| 2026133
 +
| Primary Facility
 
| 2011-12-12
 
| 2011-12-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was due to spud notification.
 
| Site visit was due to spud notification.
Patterson-UTI Rig 480 was on site.  Jack Deuitt and Dave Sheffield were the company men.
 
Impoundment construction was complete.
 
Site pad was rutted and very muddy.  Company men stated that new stone would be installed after rig skid.
 
BMPs were in place. 
 
Drill pit was installed and sound.  One side of pit was near capacity (but within freeboard limits) with fluid.  Company men were notified.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2033866
 
| 2033866
 +
| Primary Facility
 
| 2012-01-13
 
| 2012-01-13
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2043105
 
| 2043105
 +
| Primary Facility
 
| 2012-02-10
 
| 2012-02-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.
 
| Site visit was part of routine inspection.
Rig had completed drilling and was removed from site.
 
Pits were being dewatered and were scheduled fro removeal early next week.
 
Access road and site were stable.
 
E&S controls were in place and functioning properly.
 
No violations noted at this time.
 
 
|
 
 
|-
 
|-
|}
+
| 2447495
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2016-01-26
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| Well was plugged.  Site was in the process of being restored.  Vent pipe marker was located at the well location
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2482788
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-05-10
| style="text-align:right;" | 0.0
+
| Routine/Partial Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection the well was plugged. See inspection # 2482777 for additional observations made during the 5/10/2016  inspection.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2564826
 +
| Primary Facility
 +
| 2017-02-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time inspection the well was plugged. Monument installled.
 
|-
 
|-
| 2012-1
+
| 2605924
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-06-20
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well plugged. See inspection report #2605916 for additional observations made on 6/20/2017.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
| 2011-2
+
| 1858602
| style="text-align:right;" | 0.0
+
| 580118
| style="text-align:right;" | 0.0
+
| 01/25/2010
| style="text-align:right;" | 0.0
+
| 2010-01-25
| style="text-align:right;" | 0.0
+
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
| style="text-align:right;" | 0.0
+
| Environmental Health & Safety
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2011-1
+
| 580118
| style="text-align:right;" | 0.0
+
| 254453
| style="text-align:right;" | 0.0
+
| NOV - Notice of Violation
| style="text-align:right;" | 0.0
+
| Comply/Closed
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
| 2010-03-24
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 580118
 +
| 266922
 +
| CACP - Consent Assessment of Civil Penalty
 +
| Comply/Closed
 +
| 2011-01-18
 +
| 2011-01-18
 +
| style="text-align: right;" | $11,000.00
 +
| style="text-align: right;" | $11,000.00
 
|-
 
|-
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:46, 16 May 2020

Well Details

Well ID: 37-129-28138
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149187
Farm/Lease Name: RIAL UNIT
License Status: Plugged and Abandoned
Spud Date: 2010-01-15
Permit Date: 2009-12-17
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.149178
Longitude: -79.350478

For data sources see[1][2][3]

Well History

Date Event
2009-12-17 New Permit Application
2009-12-29 Performed Spud Operation
2010-02-04 Drilling Completion
2011-01-13 Newly Drilled
2015-08-31 Begin Plugging
2015-09-11 Finished Plugging
2019-05-31 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 LONGFELLOW ENERGY LP 0.00 0 0.00 0 0.00 0
2010 LONGFELLOW ENERGY LP 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 XPR RESOURCES LLC Fracing Fluid Waste 37,223.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Servicing Fluid 1,320.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1854277 Primary Facility 2010-01-07 Routine/Complete Inspection No Violations Noted Well has been spudded and the site is currently being prepared for the rig to move on site.
1858602 Primary Facility 2010-01-25 Routine/Complete Inspection Violation(s) Noted
1863359 Primary Facility 2010-01-26 Drilling/Alteration No Violations Noted MARCELLUS
1863364 Primary Facility 2010-02-16 Drilling/Alteration No Violations Noted MARCELLUS
1863366 Primary Facility 2009-12-30 Drilling/Alteration No Violations Noted MARCELLUS
1871915 Primary Facility 2010-03-24 Compliance Evaluation No Violations Noted The Department conducted an inspection in response to the violations noted on 1/25/10. Specifically, E&S violations were written for filter fabric fence down, overwhelmed controls, and improperly functioning controls. All the violations have been abated.
1894953 Primary Facility 2010-06-23 Drilling/Alteration No Violations Noted MARCELLUS PITS EMPTY,WELL NOT PRODUCING,SITE NOT RESTORED, NO EQUIPMENT ONSITE.
1916493 Primary Facility 2010-08-15 Routine/Complete Inspection No Violations Noted WELL CAPPED, PIT FENCED, RIG GONE, SITE CLEAN
1982094 Primary Facility 2011-06-03 Routine/Complete Inspection No Violations Noted Site visit was for a routine inspection. Site is permitted to be reconstructed and redrilled.
2016811 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted Site visit was due to spud notification.
2024898 Primary Facility 2011-11-23 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2026133 Primary Facility 2011-12-12 Routine/Complete Inspection No Violations Noted Site visit was due to spud notification.
2033866 Primary Facility 2012-01-13 Routine/Complete Inspection No Violations Noted
2043105 Primary Facility 2012-02-10 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2447495 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well was plugged. Site was in the process of being restored. Vent pipe marker was located at the well location
2482788 Primary Facility 2016-05-10 Routine/Partial Inspection No Violations Noted At the time of inspection the well was plugged. See inspection # 2482777 for additional observations made during the 5/10/2016 inspection.
2564826 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted At the time inspection the well was plugged. Monument installled.
2605924 Primary Facility 2017-06-20 Routine/Complete Inspection No Violations Noted Well plugged. See inspection report #2605916 for additional observations made on 6/20/2017.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1858602 580118 01/25/2010 2010-01-25 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
580118 254453 NOV - Notice of Violation Comply/Closed 2010-03-24
580118 266922 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-01-18 2011-01-18 $11,000.00 $11,000.00

For data sources see[7]

References