If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{051-24506-Details}} __TOC__ == Well Inspection Data == {{051-24506-inspection}} == Production Data == {{051-24506-production}} == Waste Data == {{051-2450...") |
m |
||
(18 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable welldetails" width="95%" |
− | + | | Well ID: 37-051-24506 | |
− | == Well | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.065569, -79.824828 | width=100% | height=100% }} |
− | {{ | + | |- |
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Fayette_County,_Pennsylvania|Fayette]] | ||
+ | |- | ||
+ | | Municipality: [[Jefferson Township,_Fayette_County,_Pennsylvania|Jefferson Township]] | ||
+ | |- | ||
+ | | Operator Name: [[CHEVRON APPALACHIA LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: [[148756]] | ||
+ | |- | ||
+ | | Farm/Lease Name: LESTER UNIT 6H | ||
+ | |- | ||
+ | | License Status: | ||
+ | |- | ||
+ | | Spud Date: | ||
+ | |- | ||
+ | | Permit Date: 2012-04-11 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
+ | |- | ||
+ | | Unconventional Well: Y | ||
+ | |- | ||
+ | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
+ | |- | ||
+ | | Latitude: 40.065569 | ||
+ | |- | ||
+ | | Longitude: -79.824828 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-04-11 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-04-29 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-09-25 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2013-03-25 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-03-25 | ||
+ | | Performed Stimulation | ||
+ | |- | ||
+ | | 2016-04-18 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2013-03-25 | ||
+ | | style="text-align: right;" | | ||
+ | |||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
− | {{ | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 520,771.00 | ||
+ | | style="text-align: right;" | 275 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 776,428.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 488,845.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 338,653.00 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 272,739.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 228,993.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 194,953.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
− | {{ | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 930.56 Tons | ||
+ | | LANDFILL | ||
+ | | 100419 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 9,008.20 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 1,545.40 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 1,490.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,677.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 2,575.80 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 24,431.80 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 87.59 Tons | ||
+ | | LANDFILL | ||
+ | | 100592 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 18.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 3.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,553.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 7.08 Tons | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | MID074259565 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 9.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,007.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 362.02 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 609.40 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,033.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 144.80 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 155.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 68.00 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 24.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 243.80 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 22.02 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 196.00 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 22.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 362.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 24.00 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
+ | |- | ||
+ | | 2090011 | ||
+ | | Primary Facility | ||
+ | | 2012-07-03 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 218' (TD).RUNNING COAL PROTECTION CASING AND CEMENTING TODAY. | ||
+ | |- | ||
+ | | 2090017 | ||
+ | | Primary Facility | ||
+ | | 2012-07-04 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS. KEANE # 2144 DRILLING ON AIR @ 678' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY. | ||
+ | |- | ||
+ | | 2090027 | ||
+ | | Primary Facility | ||
+ | | 2012-07-09 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS,KEANE # 2144 DRILLING ON AIR @ 2352' (TD).RUNNING INTERMEDIATE CASING AND CEMENTING TODAY. | ||
+ | |- | ||
+ | | 2090031 | ||
+ | | Primary Facility | ||
+ | | 2012-07-14 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 7100' (TD). RUINNING BRIDGE PLUG AND LOADING HOLE WITH OIL BASE MUD. CAPPING THE WELL AND MOVING TO NEXT WELL ON SAME SITE. | ||
+ | |- | ||
+ | | 2092031 | ||
+ | | Primary Facility | ||
+ | | 2012-08-15 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | 5 verticals and no horizontals drilled. Crew cleaning frac tanks. | ||
+ | |- | ||
+ | | 2113753 | ||
+ | | Primary Facility | ||
+ | | 2012-09-26 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 11,283' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT (9/25/2012). | ||
+ | |- | ||
+ | | 2113757 | ||
+ | | Primary Facility | ||
+ | | 2012-09-21 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON THIS WEEK OF (9/21/2012). | ||
+ | |- | ||
+ | | 2121526 | ||
+ | | Primary Facility | ||
+ | | 2012-12-06 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | E&S, PPC, Permits in box, site ID sign up. Some erosion issues at back of water impoundment being addressed by operator. Will monitor further. | ||
+ | |- | ||
+ | | 2137231 | ||
+ | | Primary Facility | ||
+ | | 2013-02-06 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Site ID sign up, Plans and permits in box, Site stable. Impoundment reaching 2 foot freeboard, operator told and will pump level down. | ||
+ | |- | ||
+ | | 2184516 | ||
+ | | Primary Facility | ||
+ | | 2013-07-18 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | Restoration extension request until 1/28/15. Site stable and wells being hooked up. Extension approved. | ||
+ | |- | ||
+ | | 2264214 | ||
+ | | Primary Facility | ||
+ | | 2014-04-21 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 5 ewells drilled and equipped. 4 tanks onsite. No open pits. Site graded and mulched. | ||
+ | |- | ||
+ | | 2330207 | ||
+ | | Primary Facility | ||
+ | | 2014-12-19 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tanks and heater units appear to be in sound condition. Site appeared to be in sound stable condition. The Departments suggests the Operator continue to monitor the site weekly and after significant precipitation events. | ||
+ | |- | ||
+ | | 2356018 | ||
+ | | Primary Facility | ||
+ | | 2015-03-26 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 5 wells onsite and equipped for production. 4 tanks onsite. Id sign ok. Site reclaimed. | ||
+ | |- | ||
+ | | 2374002 | ||
+ | | Primary Facility | ||
+ | | 2015-05-28 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | |- | ||
+ | | 2492874 | ||
+ | | Primary Facility | ||
+ | | 2016-05-17 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On 05/17/16 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by Chevron Appalachia LLC. The Act 9 sign was in place and all required documents were present in the mailbox. The site meets the standards required for permit termination. The NOT is approved. | ||
+ | |- | ||
+ | | 2523509 | ||
+ | | Primary Facility | ||
+ | | 2016-09-20 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | HORIZONTAL MARCELLUS, Well appears to be producing natural gas. | ||
+ | |- | ||
+ | | 2585010 | ||
+ | | Primary Facility | ||
+ | | 2017-04-20 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection | ||
+ | |- | ||
+ | | 2585012 | ||
+ | | Primary Facility | ||
+ | | 2017-04-20 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection | ||
+ | |- | ||
+ | | 2734996 | ||
+ | | Primary Facility | ||
+ | | 2018-05-29 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. | ||
+ | |- | ||
+ | | 2792979 | ||
+ | | Primary Facility | ||
+ | | 2018-10-11 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. | ||
+ | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-051-24506 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.065569,"lon":-79.824828,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Jefferson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148756 | |
Farm/Lease Name: LESTER UNIT 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-04-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.065569 | |
Longitude: -79.824828 |
Date | Event |
---|---|
2012-04-11 | New Permit Application |
2012-04-29 | Performed Spud Operation |
2012-09-25 | Drilling Completion |
2013-03-25 | Perforation |
2013-03-25 | Performed Stimulation |
2016-04-18 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-03-25 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 520,771.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 776,428.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 488,845.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 338,653.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 272,739.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 228,993.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 194,953.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 930.56 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 9,008.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,545.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,490.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,677.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,575.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 24,431.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 87.59 Tons | LANDFILL | 100592 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 18.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,553.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 7.08 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 9.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,007.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 362.02 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 609.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,033.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 144.80 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 155.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 68.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 24.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 243.80 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 22.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 196.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 362.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 24.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2090011 | Primary Facility | 2012-07-03 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 218' (TD).RUNNING COAL PROTECTION CASING AND CEMENTING TODAY. |
2090017 | Primary Facility | 2012-07-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS. KEANE # 2144 DRILLING ON AIR @ 678' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY. |
2090027 | Primary Facility | 2012-07-09 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,KEANE # 2144 DRILLING ON AIR @ 2352' (TD).RUNNING INTERMEDIATE CASING AND CEMENTING TODAY. |
2090031 | Primary Facility | 2012-07-14 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, KEANE # 2144 DRILLING ON AIR @ 7100' (TD). RUINNING BRIDGE PLUG AND LOADING HOLE WITH OIL BASE MUD. CAPPING THE WELL AND MOVING TO NEXT WELL ON SAME SITE. |
2092031 | Primary Facility | 2012-08-15 | Complaint Inspection | No Violations Noted | 5 verticals and no horizontals drilled. Crew cleaning frac tanks. |
2113753 | Primary Facility | 2012-09-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 11,283' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT (9/25/2012). |
2113757 | Primary Facility | 2012-09-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON THIS WEEK OF (9/21/2012). |
2121526 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | E&S, PPC, Permits in box, site ID sign up. Some erosion issues at back of water impoundment being addressed by operator. Will monitor further. |
2137231 | Primary Facility | 2013-02-06 | Routine/Complete Inspection | No Violations Noted | Site ID sign up, Plans and permits in box, Site stable. Impoundment reaching 2 foot freeboard, operator told and will pump level down. |
2184516 | Primary Facility | 2013-07-18 | Site Restoration | No Violations Noted | Restoration extension request until 1/28/15. Site stable and wells being hooked up. Extension approved. |
2264214 | Primary Facility | 2014-04-21 | Routine/Complete Inspection | No Violations Noted | 5 ewells drilled and equipped. 4 tanks onsite. No open pits. Site graded and mulched. |
2330207 | Primary Facility | 2014-12-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tanks and heater units appear to be in sound condition. Site appeared to be in sound stable condition. The Departments suggests the Operator continue to monitor the site weekly and after significant precipitation events. |
2356018 | Primary Facility | 2015-03-26 | Routine/Complete Inspection | No Violations Noted | 5 wells onsite and equipped for production. 4 tanks onsite. Id sign ok. Site reclaimed. |
2374002 | Primary Facility | 2015-05-28 | Routine/Complete Inspection | No Violations Noted | |
2492874 | Primary Facility | 2016-05-17 | Routine/Complete Inspection | No Violations Noted | On 05/17/16 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by Chevron Appalachia LLC. The Act 9 sign was in place and all required documents were present in the mailbox. The site meets the standards required for permit termination. The NOT is approved. |
2523509 | Primary Facility | 2016-09-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Well appears to be producing natural gas. |
2585010 | Primary Facility | 2017-04-20 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection |
2585012 | Primary Facility | 2017-04-20 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated but an erosion channel was observed along the access road. It is recommended that this be repaired to prevent further erosion. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection |
2734996 | Primary Facility | 2018-05-29 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
2792979 | Primary Facility | 2018-10-11 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
For data sources see[8]