X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28494"

m
 
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 129-28494
+
| Well ID: 37-129-28494
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.562583, -79.700916 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.562583, -79.700917 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| Municipality: [[Lower Burrell City, Westmoreland County, Pennsylvania|Lower Burrell City]]
+
| Municipality: [[Lower Burrell City,_Westmoreland_County,_Pennsylvania|Lower Burrell City]]
 
|-
 
|-
| Operator Name: [[PENNECO OIL CO INC|PENNECO OIL CO INC]]
+
| Operator Name: [[PENNECO OIL CO INC]]
 
|-
 
|-
| First Permit Date: 2010-12-23
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2010-12-23
+
| Farm/Lease Name: HARTGE UNIT 5H
 
|-
 
|-
| Spud Date: 2011-03-01
+
| License Status:  
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 2010-12-23
 
|-
 
|-
| Violations: None
+
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Deviated Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.562583
 
| Latitude: 40.562583
 
|-
 
|-
| Longitude: -79.700916
+
| Longitude: -79.700917
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-12-23
 +
| New Permit Application
 +
|-
 +
| 2011-03-01
 +
| Performed Spud Operation
 +
|-
 +
| 2011-03-07
 +
| Drilling Completion
 +
|-
 +
| 2012-08-15
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 32,942.00
 +
| style="text-align: right;" | 245
 +
| style="text-align: right;" | 16854.64
 +
| style="text-align: right;" | 245
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 12,410.00
 +
| style="text-align: right;" | 243
 +
| style="text-align: right;" | 8593.06
 +
| style="text-align: right;" | 243
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 10,666.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 3062.48
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 8,189.70
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 2530.06
 +
| style="text-align: right;" | 304
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 7,066.77
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 1501.88
 +
| style="text-align: right;" | 275
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,898.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 906.95
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 2,791.27
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 1,162.72
 +
| style="text-align: right;" | 244
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 2,741.65
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 1,000.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 120.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 2,850.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 424 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 424.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 253.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,014.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 253 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,014.00 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 695 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 695.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 96.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3177
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1948428
 
| 1948428
 +
| Primary Facility
 
| 2011-02-08
 
| 2011-02-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Drilling 11" hole at 1320' at time of inspection.  Information per drillers log and cement tickets:  Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of  "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk).  Cement returns to surface realized with plug landing at 01:00 02-06-11.  
+
| Drilling 11" hole at 1320' at time of inspection.  Information per drillers log and cement tickets:  Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of  "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk).  Cement returns to surface realized with plug landing at 01:00 02-06-11.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site. 
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1948439
 
| 1948439
 +
| Primary Facility
 
| 2011-02-04
 
| 2011-02-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole.  32' of 24" conductor previously set and sanded in.  
+
| At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole.  32' of 24" conductor previously set and sanded in.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site. 
 
Met with Operator rep Bob Carnahan and Drilling rep Brad Riley.
 
WQS's J. Shultz and G. Higgins at site at time of inspection.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1948451
 
| 1948451
 +
| Primary Facility
 
| 2011-02-04
 
| 2011-02-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11.  Estimated that cement 10'-15'  from surface.  Will grout backside when cementing 11 3/4" casing.
+
| Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11.  Estimated that cement 10'-15'  from surface.  Will grout backside when cementing 11 3/4" casing.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site. 
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1949124
 
| 1949124
 +
| Primary Facility
 
| 2011-02-10
 
| 2011-02-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Rig broke down - Swivel O-Rings - at 1955' at time of inspection.
+
| Rig broke down - Swivel O-Rings - at 1955' at time of inspection.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
Inspection conducted w/OGI J. Branan.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1949910
 
| 1949910
 +
| Primary Facility
 
| 2011-02-04
 
| 2011-02-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Rig is on-site.  Drilling in progress.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There are no signs of erosion or sedimentation.
 
| Rig is on-site.  Drilling in progress.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There are no signs of erosion or sedimentation.
|
 
|-
 
 
|-
 
|-
 
| 1949926
 
| 1949926
 +
| Primary Facility
 
| 2011-02-11
 
| 2011-02-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Rig is on-site.  Drilling in progress, currently at ~2050 feet.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There are no signs of erosion or sedimentation.
 
| Rig is on-site.  Drilling in progress, currently at ~2050 feet.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There are no signs of erosion or sedimentation.
 
Note- Some cuttings have blown out of the pit onto the pad.  The cuttings will be placed in the pit.  The operator has utilized a flange to prevent this from happening again.
 
 
|
 
|-
 
 
|-
 
|-
 
| 1953014
 
| 1953014
 +
| Primary Facility
 
| 2011-02-16
 
| 2011-02-16
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on kick-off cement plug at time of inspection.
 
| Waiting on kick-off cement plug at time of inspection.
Per 02-14-11 phone message from Operator rep Marc Jacobs; 8 5/8" cement not returned to surface.
 
Per 02-16-11 phone call with Operator rep Juan Kopp; 2377' of 8 5/8" previously set and cemented.  Cement not returned to surface.  Drilled 6 1/4" hole to approximately 3150' prior to plugging back to approximately 2400' for proposed kick-off point of 2440'.  Cement bond log to be run on 02-17-11. 
 
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
Inspection conducted w/OGI J. Branan.
 
 
|
 
|-
 
 
|-
 
|-
 
| 1953029
 
| 1953029
 +
| Primary Facility
 
| 2011-02-17
 
| 2011-02-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on kick-off cement plug at time of inspection.
 
| Waiting on kick-off cement plug at time of inspection.
Titan Wireline ran cement bond log in 8 5/8" casing.  Tagged cement at 2388'.  8 5/8" casing shoe at 2377'.  Log showed 50% bond of 8 5/8" in 11 3/4" casing at 250'; 90% bond at 400'.
 
509' of  11 3/4" casing previously set in 15" hole and cemented with 260 sacks  of "A" containing 3% CACL2 & 1/4# flake & 0.2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00  02-05-11. 
 
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
 
|
 
|-
 
 
|-
 
|-
 
| 1953032
 
| 1953032
 +
| Primary Facility
 
| 2011-02-25
 
| 2011-02-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Waiting on new bit at time of inspection.  Building curve at 2544' MD with kickoff point at 2461' vertical depth.  
+
| Waiting on new bit at time of inspection.  Building curve at 2544' MD with kickoff point at 2461' vertical depth.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
Inspection conducted w/OGI J. Branan.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1953550
 
| 1953550
 +
| Primary Facility
 
| 2011-03-02
 
| 2011-03-02
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection.  Proposed total measured depth = 4450' MD.  
+
| Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection.  Proposed total measured depth = 4450' MD.
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1958609
 
| 1958609
 +
| Primary Facility
 
| 2011-03-11
 
| 2011-03-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Location grading being done at time of inspection.  
+
| Location grading being done at time of inspection.
Well shut in on 4 1/2" x 2" swage.  8 5/8" x 4 1/2" annulus closed.  11 3/4" x 8 5/8" annulus not visible. 
 
Drilling pit lined and freeboard maintained.
 
No E/S control issues on site.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 1998540
 
| 1998540
 +
| Primary Facility
 
| 2011-08-25
 
| 2011-08-25
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling had been completed, well appeared to be equipped for and in production.  Oil and brine tanks located onsite and they appeared to be in sound condition.  There was no accelerated erosion or sedimentation observed in relation to the site or access road.  The site had been properly restored and the vegetation had begun to grow.  Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls.
 
| Drilling had been completed, well appeared to be equipped for and in production.  Oil and brine tanks located onsite and they appeared to be in sound condition.  There was no accelerated erosion or sedimentation observed in relation to the site or access road.  The site had been properly restored and the vegetation had begun to grow.  Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls.
|
 
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
|-
 
| 2012-0
 
| style="text-align:right;" | 12410.0
 
| style="text-align:right;" | 243.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 8593.06
 
| style="text-align:right;" | 243.0
 
|-
 
 
|-
 
|-
| 2011-0
+
|}-->
| style="text-align:right;" | 32942.0
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 245.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 16854.64
 
| style="text-align:right;" | 245.0
 
|-
 
|-
 
| 2010-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
== Waste Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 1000.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
|-
+
|}-->
| 2011-0
+
For data sources see<ref>{{cite web
| DRILLING FLUID WASTE
+
| title =Oil and Gas Compliance Report
| style="text-align:right;" | 2850.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| Bbl
+
| date = 2019-05-20
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| PA0091472
+
| accessdate = 2019-05-21 }}</ref>
| TUNNELTON LIQUIDS COMPANY
+
==References==
| SALTSBURG
+
<references/>
| PA
 
|-
 
|-
 
| 2011-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 120.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
|-
 
|}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 12:14, 16 May 2020

Well Details

Well ID: 37-129-28494
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Lower Burrell City
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HARTGE UNIT 5H
License Status:
Spud Date:
Permit Date: 2010-12-23
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.562583
Longitude: -79.700917

For data sources see[1][2][3]

Well History

Date Event
2010-12-23 New Permit Application
2011-03-01 Performed Spud Operation
2011-03-07 Drilling Completion
2012-08-15 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 32,942.00 245 16854.64 245 0.00 0
2012 PENNECO OIL CO INC 12,410.00 243 8593.06 243 0.00 0
2013 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2014 PENNECO OIL CO INC 10,666.00 365 3062.48 365 0.00 0
2015 PENNECO OIL CO INC 8,189.70 365 2530.06 304 0.00 0
2016 PENNECO OIL CO INC 7,066.77 366 1501.88 275 0.00 0
2017 PENNECO OIL CO INC 3,898.00 365 906.95 365 0.00 0
2018 PENNECO OIL CO INC 2,791.27 365 1,162.72 244 0.00 0
2019 PENNECO OIL CO INC 2,741.65 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 1,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Drilling Fluid Waste 2,850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid 424 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 424.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Fracing Fluid Waste 253.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 1,014.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Fracing Fluid Waste 253 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 1,014.00 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 695 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 695.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 PENNECO OIL CO INC Produced Fluid 96.67 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1948428 Primary Facility 2011-02-08 Drilling/Alteration No Violations Noted Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11.
1948439 Primary Facility 2011-02-04 Drilling/Alteration No Violations Noted At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in.
1948451 Primary Facility 2011-02-04 Drilling/Alteration No Violations Noted Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing.
1949124 Primary Facility 2011-02-10 Drilling/Alteration No Violations Noted Rig broke down - Swivel O-Rings - at 1955' at time of inspection.
1949910 Primary Facility 2011-02-04 Routine/Complete Inspection No Violations Noted Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1949926 Primary Facility 2011-02-11 Routine/Complete Inspection No Violations Noted Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation.
1953014 Primary Facility 2011-02-16 Drilling/Alteration No Violations Noted Waiting on kick-off cement plug at time of inspection.
1953029 Primary Facility 2011-02-17 Drilling/Alteration No Violations Noted Waiting on kick-off cement plug at time of inspection.
1953032 Primary Facility 2011-02-25 Drilling/Alteration No Violations Noted Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth.
1953550 Primary Facility 2011-03-02 Drilling/Alteration No Violations Noted Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD.
1958609 Primary Facility 2011-03-11 Drilling/Alteration No Violations Noted Location grading being done at time of inspection.
1998540 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls.

For data sources see[7]

References