If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: | + | | Well ID: 37-129-28494 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.562583, -79.700917 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Westmoreland_County,_Pennsylvania|Westmoreland]] |
|- | |- | ||
− | | Municipality: [[Lower Burrell City, | + | | Municipality: [[Lower Burrell City,_Westmoreland_County,_Pennsylvania|Lower Burrell City]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[PENNECO OIL CO INC]] |
|- | |- | ||
− | | | + | | Well Pad ID: |
|- | |- | ||
− | | | + | | Farm/Lease Name: HARTGE UNIT 5H |
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2010-12-23 |
|- | |- | ||
− | | | + | | Well Type: OIL |
+ | |- | ||
+ | | Unconventional Well: N | ||
+ | |- | ||
+ | | Configuration: Deviated Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.562583 | | Latitude: 40.562583 | ||
|- | |- | ||
− | | Longitude: -79. | + | | Longitude: -79.700917 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-12-23 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-03-01 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-03-07 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-08-15 | ||
+ | | DEVIATED | ||
|- | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 32,942.00 | ||
+ | | style="text-align: right;" | 245 | ||
+ | | style="text-align: right;" | 16854.64 | ||
+ | | style="text-align: right;" | 245 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 12,410.00 | ||
+ | | style="text-align: right;" | 243 | ||
+ | | style="text-align: right;" | 8593.06 | ||
+ | | style="text-align: right;" | 243 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 10,666.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 3062.48 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 8,189.70 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 2530.06 | ||
+ | | style="text-align: right;" | 304 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 7,066.77 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 1501.88 | ||
+ | | style="text-align: right;" | 275 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 3,898.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 906.95 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 2,791.27 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 1,162.72 | ||
+ | | style="text-align: right;" | 244 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | style="text-align: right;" | 2,741.65 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 1,000.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 120.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0091472 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 2,850.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0091472 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 424 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 424.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 253.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,014.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 253 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,014.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 695 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 695.00 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0095443 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 15.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[PENNECO OIL CO INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 96.67 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-007-2-3177 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 1948428 | | 1948428 | ||
+ | | Primary Facility | ||
| 2011-02-08 | | 2011-02-08 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11. | + | | Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11. |
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1948439 | | 1948439 | ||
+ | | Primary Facility | ||
| 2011-02-04 | | 2011-02-04 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in. | + | | At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1948451 | | 1948451 | ||
+ | | Primary Facility | ||
| 2011-02-04 | | 2011-02-04 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing. | + | | Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing. |
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1949124 | | 1949124 | ||
+ | | Primary Facility | ||
| 2011-02-10 | | 2011-02-10 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Rig broke down - Swivel O-Rings - at 1955' at time of inspection. | + | | Rig broke down - Swivel O-Rings - at 1955' at time of inspection. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1949910 | | 1949910 | ||
+ | | Primary Facility | ||
| 2011-02-04 | | 2011-02-04 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. | | Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. | ||
− | |||
− | |||
|- | |- | ||
| 1949926 | | 1949926 | ||
+ | | Primary Facility | ||
| 2011-02-11 | | 2011-02-11 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. | | Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1953014 | | 1953014 | ||
+ | | Primary Facility | ||
| 2011-02-16 | | 2011-02-16 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Waiting on kick-off cement plug at time of inspection. | | Waiting on kick-off cement plug at time of inspection. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1953029 | | 1953029 | ||
+ | | Primary Facility | ||
| 2011-02-17 | | 2011-02-17 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Waiting on kick-off cement plug at time of inspection. | | Waiting on kick-off cement plug at time of inspection. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1953032 | | 1953032 | ||
+ | | Primary Facility | ||
| 2011-02-25 | | 2011-02-25 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth. | + | | Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1953550 | | 1953550 | ||
+ | | Primary Facility | ||
| 2011-03-02 | | 2011-03-02 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD. | + | | Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD. |
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1958609 | | 1958609 | ||
+ | | Primary Facility | ||
| 2011-03-11 | | 2011-03-11 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | | Location grading being done at time of inspection. | + | | Location grading being done at time of inspection. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1998540 | | 1998540 | ||
+ | | Primary Facility | ||
| 2011-08-25 | | 2011-08-25 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls. | | Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls. | ||
− | |||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Violation Date |
− | !scope="col" | | + | !scope="col" | Date Resolved |
− | !scope="col" | | + | !scope="col" | Violation Code |
− | !scope="col" | | + | !scope="col" | Violation Type |
− | !scope="col" | | + | !scope="col" | Violation Comments |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | |- | + | |}--> |
− | + | <!--==== Penalties Applied ==== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | !scope="col" | | + | !scope="col" | Penalty Code |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | + | !scope="col" | Enforcement Date | |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | !scope="col" | | ||
|- | |- | ||
− | | | + | |}--> |
− | + | For data sources see<ref>{{cite web | |
− | | | + | | title =Oil and Gas Compliance Report |
− | | | + | |publisher = [[Pennsylvania Department of Environmental Protection]] |
− | | | + | | date = 2019-05-20 |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-129-28494 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.562583,"lon":-79.700917,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Lower Burrell City | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: HARTGE UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-23 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.562583 | |
Longitude: -79.700917 |
Date | Event |
---|---|
2010-12-23 | New Permit Application |
2011-03-01 | Performed Spud Operation |
2011-03-07 | Drilling Completion |
2012-08-15 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 32,942.00 | 245 | 16854.64 | 245 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 12,410.00 | 243 | 8593.06 | 243 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 10,666.00 | 365 | 3062.48 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 8,189.70 | 365 | 2530.06 | 304 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 7,066.77 | 366 | 1501.88 | 275 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 3,898.00 | 365 | 906.95 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 2,791.27 | 365 | 1,162.72 | 244 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 2,741.65 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,000.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PENNECO OIL CO INC | Produced Fluid | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 2,850.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2013 | PENNECO OIL CO INC | Produced Fluid | 424 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 424.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Fracing Fluid Waste | 253.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 1,014.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Fracing Fluid Waste | 253 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 1,014.00 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 695 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 695.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | PENNECO OIL CO INC | Produced Fluid | 96.67 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3177 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1948428 | Primary Facility | 2011-02-08 | Drilling/Alteration | No Violations Noted | Drilling 11" hole at 1320' at time of inspection. Information per drillers log and cement tickets: Cemented 509' of 11 3/4" casing in 15" hole with 260 sacks of "A" containing 3% CACL2 & 1/4# flake & .2% foam chek (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 01:00 02-06-11. |
1948439 | Primary Facility | 2011-02-04 | Drilling/Alteration | No Violations Noted | At time of inspection, Union Drilling rig 55 waiting on Universal Well Services to cement 212' of 16" casing in 20" hole. 32' of 24" conductor previously set and sanded in. |
1948451 | Primary Facility | 2011-02-04 | Drilling/Alteration | No Violations Noted | Universal Well Services cemented 212' of 16" casing in 20" hole with 170 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with plug landing at 15:30 02-04-11. Estimated that cement 10'-15' from surface. Will grout backside when cementing 11 3/4" casing. |
1949124 | Primary Facility | 2011-02-10 | Drilling/Alteration | No Violations Noted | Rig broke down - Swivel O-Rings - at 1955' at time of inspection. |
1949910 | Primary Facility | 2011-02-04 | Routine/Complete Inspection | No Violations Noted | Rig is on-site. Drilling in progress. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. |
1949926 | Primary Facility | 2011-02-11 | Routine/Complete Inspection | No Violations Noted | Rig is on-site. Drilling in progress, currently at ~2050 feet. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no signs of erosion or sedimentation. |
1953014 | Primary Facility | 2011-02-16 | Drilling/Alteration | No Violations Noted | Waiting on kick-off cement plug at time of inspection. |
1953029 | Primary Facility | 2011-02-17 | Drilling/Alteration | No Violations Noted | Waiting on kick-off cement plug at time of inspection. |
1953032 | Primary Facility | 2011-02-25 | Drilling/Alteration | No Violations Noted | Waiting on new bit at time of inspection. Building curve at 2544' MD with kickoff point at 2461' vertical depth. |
1953550 | Primary Facility | 2011-03-02 | Drilling/Alteration | No Violations Noted | Drilling 7 7/8" lateral at 3498' MD with 9.3 lb/gal mud at time of inspection. Proposed total measured depth = 4450' MD. |
1958609 | Primary Facility | 2011-03-11 | Drilling/Alteration | No Violations Noted | Location grading being done at time of inspection. |
1998540 | Primary Facility | 2011-08-25 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for and in production. Oil and brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. The site had been properly restored and the vegetation had begun to grow. Upon achieving 70% uniform vegetative cover the operator should remove the temporary silt fencing erosion controls. |
For data sources see[7]