X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28593"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28593
 
| Well ID: 37-129-28593
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.566833, -79.706388 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.566833, -79.706389 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Lower Burrell City, Westmoreland County, Pennsylvania|Lower Burrell City]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[PENNECO OIL CO INC|PENNECO OIL CO INC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| First Permit Date: 2011-05-26
+
| Municipality: [[Lower Burrell City,_Westmoreland_County,_Pennsylvania|Lower Burrell City]]
 
|-
 
|-
| Last Permit Date: 2011-05-26
+
| Operator Name: [[PENNECO OIL CO INC]]
 
|-
 
|-
| Spud Date: 2011-06-27
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: No
+
| Farm/Lease Name: SLUSS 7H
 
|-
 
|-
| Horizontal: Yes
+
| License Status:  
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 +
|-
 +
| Permit Date: 2011-05-26
 +
|-
 +
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Deviated Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.566833
 
| Latitude: 40.566833
 
|-
 
|-
| Longitude: -79.706388
+
| Longitude: -79.706389
|-
 
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
+
|-
!scope="col" | COMMENT
+
| 2011-05-26
!scope="col" | VIOLATION ID
+
| New Permit Application
 +
|-
 +
| 2011-06-27
 +
| Performed Spud Operation
 
|-
 
|-
| 1986056
+
| 2011-08-16
| 2011-07-01
+
| Drilling Completion
| No Violations Noted
 
| US Energy Rig #4 RD20 waiting on cement at time of inspection.  Pit lined and freeboard maintained.  Inspection conducted w/OGI's D. Catalano and J. Branan.
 
|  
 
 
|-
 
|-
 +
| 2011-09-06
 +
| Perforation
 
|-
 
|-
| 1986084
+
| 2012-02-23
| 2011-07-06
+
| DEVIATED
| No Violations Noted
 
| US Energy Rig #4 RD20 waiting on bit at time of inspection.  17 1/2" hole at 447'.  Cement basket on 13 3/8" mine string to be placed at 392'.  Pit lined and freeboard maintained.
 
Discussed casing plan as pertains to Chapter 78 w/Operator rep Bob Carnahan.  Operator rep Marc Jacobs to follow-up with casing plan determination.
 
 
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1989906
+
|}-->
| 2011-07-14
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
| US Energy Rig #4 RD20 tripping out of hole at time of inspection.  7 7/8" hole TD=3175'.  Pit lined and freeboard maintained.
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 1998543
+
|}-->
| 2011-08-25
+
 
| No Violations Noted
+
== Production Data ==
| Drilling appeared to have been completed.  Drill pit located onsite and it had more than the required two feet of lined freeboard.  All erosion controls appeared to be functioning properly and no accelerated erosion or sedimentation was observed in relation to the access road or well-site.  At the time of the inspection the operator was pumping water up from Pucketa Creek for well stimulation activities.  Operator should continue to monitor the site until all development activities are completed.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,583.00
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 2719.24
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 12,187.00
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 5167.15
 +
| style="text-align: right;" | 274
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2031331
+
| 2013
| 2012-01-04
+
| [[PENNECO OIL CO INC]]
| No Violations Noted
+
| style="text-align: right;" | 9,237.00
| Well appeared to be equipped for production.  Above ground tanks and pumpjack apparatus located onsite and all appeared to be in sound condition.  Site had not as of yet been regraded.  There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.  The operator should temporariluy stabilize the site in accordance with 102.22(b) until final site restoration can be completed.
+
| style="text-align: right;" | 365
|  
+
| style="text-align: right;" | 2304.14
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 11,376.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 1528.95
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2069607
+
| 2015
| 2012-05-21
+
| [[PENNECO OIL CO INC]]
| No Violations Noted
+
| style="text-align: right;" | 8,927.32
| At the time of inspection the well appears to drilled and equipped for production.  The well apparatus, brine tank, brine tank containment, and pump jack located onsite appear to be in sound working condition.  The site has recently been regraded, seed and mulch.  The Department suggest the Operator continue to monitor the site to ensure the 70% uniform vegetative coverage criteria is met.
+
| style="text-align: right;" | 365
|  
+
| style="text-align: right;" | 1021.52
 +
| style="text-align: right;" | 212
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|}
+
| 2016
== Production Data ==
+
| [[PENNECO OIL CO INC]]
{| class="wikitable sortable" width="95%"
+
| style="text-align: right;" | 7,966.24
!scope="col" | PERIOD
+
| style="text-align: right;" | 366
!scope="col" | GAS QUANTITY
+
| style="text-align: right;" | 546.59
!scope="col" | GAS PRODUCTION DAYS
+
| style="text-align: right;" | 91
!scope="col" | CONDENSATE QUANTITY
+
| style="text-align: right;" | 0.00
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| style="text-align: right;" | 0
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-0
+
| 2017
| style="text-align:right;" | 12187.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 274.0
+
| style="text-align: right;" | 5,493.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 534.31
| style="text-align:right;" | 5167.15
+
| style="text-align: right;" | 365
| style="text-align:right;" | 274.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 7,194.15
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 144.09
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2019
| style="text-align:right;" | 1583.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 92.0
+
| style="text-align: right;" | 3,610.28
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 463.75
| style="text-align:right;" | 2719.24
+
| style="text-align: right;" | 59
| style="text-align:right;" | 92.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 2011
| PRODUCED FLUID
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 438.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 480.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
|-
+
| 2011
| 2011-0
+
| [[PENNECO OIL CO INC]]
| DRILLING FLUID WASTE
+
| Fracing Fluid Waste
| style="text-align:right;" | 240.0
+
| style="text-align: right;" | 80.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2011
| FRACING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 80.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 770.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2011-0
+
| 2012
| FRACING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 480.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 438.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,335.19 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,335.19 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 249.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 249 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 731 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 731.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 433.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 104.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3177
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1986056
 +
| Primary Facility
 +
| 2011-07-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| US Energy Rig #4 RD20 waiting on cement at time of inspection.  Pit lined and freeboard maintained.  Inspection conducted w/OGI's D. Catalano and J. Branan.
 
|-
 
|-
| 2011-0
+
| 1986084
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 160.0
+
| 2011-07-06
| Bbl
+
| Drilling/Alteration
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0101508
+
| US Energy Rig #4 RD20 waiting on bit at time of inspection.  17 1/2" hole at 447'.  Cement basket on 13 3/8" mine string to be placed at 392'.  Pit lined and freeboard maintained.
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
|-
| FRANKLIN
+
| 1989906
| PA
+
| Primary Facility
 +
| 2011-07-14
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| US Energy Rig #4 RD20 tripping out of hole at time of inspection.  7 7/8" hole TD=3175'.  Pit lined and freeboard maintained.
 
|-
 
|-
 +
| 1998543
 +
| Primary Facility
 +
| 2011-08-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling appeared to have been completed.  Drill pit located onsite and it had more than the required two feet of lined freeboard.  All erosion controls appeared to be functioning properly and no accelerated erosion or sedimentation was observed in relation to the access road or well-site.  At the time of the inspection the operator was pumping water up from Pucketa Creek for well stimulation activities.  Operator should continue to monitor the site until all development activities are completed.
 
|-
 
|-
| 2011-0
+
| 2031331
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 770.0
+
| 2012-01-04
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0091472
+
| Well appeared to be equipped for production.  Above ground tanks and pumpjack apparatus located onsite and all appeared to be in sound condition.  Site had not as of yet been regraded.  There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.  The operator should temporariluy stabilize the site in accordance with 102.22(b) until final site restoration can be completed.
| TUNNELTON LIQUIDS COMPANY
+
|-
| SALTSBURG
+
| 2069607
| PA
+
| Primary Facility
 +
| 2012-05-21
 +
| Site Restoration
 +
| No Violations Noted
 +
| At the time of inspection the well appears to drilled and equipped for production.  The well apparatus, brine tank, brine tank containment, and pump jack located onsite appear to be in sound working condition.  The site has recently been regraded, seed and mulch.  The Department suggest the Operator continue to monitor the site to ensure the 70% uniform vegetative coverage criteria is met.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 13:24, 16 May 2020

Well Details

Well ID: 37-129-28593
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Lower Burrell City
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: SLUSS 7H
License Status:
Spud Date:
Permit Date: 2011-05-26
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.566833
Longitude: -79.706389

For data sources see[1][2][3]

Well History

Date Event
2011-05-26 New Permit Application
2011-06-27 Performed Spud Operation
2011-08-16 Drilling Completion
2011-09-06 Perforation
2012-02-23 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PENNECO OIL CO INC 1,583.00 92 2719.24 92 0.00 0
2012 PENNECO OIL CO INC 12,187.00 274 5167.15 274 0.00 0
2013 PENNECO OIL CO INC 9,237.00 365 2304.14 365 0.00 0
2014 PENNECO OIL CO INC 11,376.00 365 1528.95 365 0.00 0
2015 PENNECO OIL CO INC 8,927.32 365 1021.52 212 0.00 0
2016 PENNECO OIL CO INC 7,966.24 366 546.59 91 0.00 0
2017 PENNECO OIL CO INC 5,493.00 365 534.31 365 0.00 0
2018 PENNECO OIL CO INC 7,194.15 365 144.09 30 0.00 0
2019 PENNECO OIL CO INC 3,610.28 365 463.75 59 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Fracing Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Drilling Fluid Waste 770.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 PENNECO OIL CO INC Produced Fluid 438.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 1,335.19 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 1,335.19 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 249.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 249 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 731 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 731.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 58 Bbl CENT WASTE TRT FAC NPDES PA0095443
2016 PENNECO OIL CO INC Produced Fluid 58.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid 433.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 PENNECO OIL CO INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 104.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1986056 Primary Facility 2011-07-01 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 waiting on cement at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/OGI's D. Catalano and J. Branan.
1986084 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 waiting on bit at time of inspection. 17 1/2" hole at 447'. Cement basket on 13 3/8" mine string to be placed at 392'. Pit lined and freeboard maintained.
1989906 Primary Facility 2011-07-14 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 tripping out of hole at time of inspection. 7 7/8" hole TD=3175'. Pit lined and freeboard maintained.
1998543 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Drill pit located onsite and it had more than the required two feet of lined freeboard. All erosion controls appeared to be functioning properly and no accelerated erosion or sedimentation was observed in relation to the access road or well-site. At the time of the inspection the operator was pumping water up from Pucketa Creek for well stimulation activities. Operator should continue to monitor the site until all development activities are completed.
2031331 Primary Facility 2012-01-04 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Above ground tanks and pumpjack apparatus located onsite and all appeared to be in sound condition. Site had not as of yet been regraded. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should temporariluy stabilize the site in accordance with 102.22(b) until final site restoration can be completed.
2069607 Primary Facility 2012-05-21 Site Restoration No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, brine tank containment, and pump jack located onsite appear to be in sound working condition. The site has recently been regraded, seed and mulch. The Department suggest the Operator continue to monitor the site to ensure the 70% uniform vegetative coverage criteria is met.

For data sources see[7]

References