X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28593"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28593
 
| Well ID: 37-129-28593
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.566833, -79.706389 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.566833, -79.706389 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SLUSS 7H
 
| Farm/Lease Name: SLUSS 7H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2011-06-27
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-05-26
 
| Permit Date: 2011-05-26
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Deviated Well
 
| Configuration: Deviated Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.566833
 
| Latitude: 40.566833
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-05-26
 +
| New Permit Application
 +
|-
 +
| 2011-06-27
 +
| Performed Spud Operation
 +
|-
 +
| 2011-08-16
 +
| Drilling Completion
 +
|-
 +
| 2011-09-06
 +
| Perforation
 +
|-
 +
| 2012-02-23
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 89: Line 130:
 
| style="text-align: right;" | 1,583.00
 
| style="text-align: right;" | 1,583.00
 
| style="text-align: right;" | 92
 
| style="text-align: right;" | 92
| style="text-align: right;" | 2,719.24
+
| style="text-align: right;" | 2719.24
 
| style="text-align: right;" | 92
 
| style="text-align: right;" | 92
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 98: Line 139:
 
| style="text-align: right;" | 12,187.00
 
| style="text-align: right;" | 12,187.00
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 274
| style="text-align: right;" | 5,167.15
+
| style="text-align: right;" | 5167.15
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 107: Line 148:
 
| style="text-align: right;" | 9,237.00
 
| style="text-align: right;" | 9,237.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 2,304.14
+
| style="text-align: right;" | 2304.14
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 116: Line 157:
 
| style="text-align: right;" | 11,376.00
 
| style="text-align: right;" | 11,376.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 1,528.95
+
| style="text-align: right;" | 1528.95
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 125: Line 166:
 
| style="text-align: right;" | 8,927.32
 
| style="text-align: right;" | 8,927.32
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 1,021.52
+
| style="text-align: right;" | 1021.52
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 154: Line 195:
 
| style="text-align: right;" | 144.09
 
| style="text-align: right;" | 144.09
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,610.28
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 463.75
 +
| style="text-align: right;" | 59
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 175: Line 225:
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 160.00 Bbl
+
| style="text-align: right;" | 480.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
Line 182: Line 232:
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 240.00 Bbl
+
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
Line 189: Line 239:
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Drilling Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 770.00 Bbl
+
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0101508
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
Line 203: Line 253:
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 480.00 Bbl
+
| style="text-align: right;" | 770.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0101508
+
| PA0091472
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 438.00 Bbl
 
| style="text-align: right;" | 438.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 217: Line 267:
 
| 2013
 
| 2013
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 1,335.19 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,335.19 Bbl
 
| style="text-align: right;" | 1,335.19 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 224: Line 281:
 
| 2014
 
| 2014
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 249.00 Bbl
 
| style="text-align: right;" | 249.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 249 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 731 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 731.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095443
 
| PA0095443
Line 231: Line 309:
 
| 2016
 
| 2016
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 58 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 58.00 Bbl
 
| style="text-align: right;" | 58.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 238: Line 323:
 
| 2017
 
| 2017
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 433.00 Bbl
 
| style="text-align: right;" | 433.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 245: Line 330:
 
| 2017
 
| 2017
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 104.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3177
 
|-
 
|-
 
|}
 
|}

Latest revision as of 13:24, 16 May 2020

Well Details

Well ID: 37-129-28593
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Lower Burrell City
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: SLUSS 7H
License Status:
Spud Date:
Permit Date: 2011-05-26
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.566833
Longitude: -79.706389

For data sources see[1][2][3]

Well History

Date Event
2011-05-26 New Permit Application
2011-06-27 Performed Spud Operation
2011-08-16 Drilling Completion
2011-09-06 Perforation
2012-02-23 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PENNECO OIL CO INC 1,583.00 92 2719.24 92 0.00 0
2012 PENNECO OIL CO INC 12,187.00 274 5167.15 274 0.00 0
2013 PENNECO OIL CO INC 9,237.00 365 2304.14 365 0.00 0
2014 PENNECO OIL CO INC 11,376.00 365 1528.95 365 0.00 0
2015 PENNECO OIL CO INC 8,927.32 365 1021.52 212 0.00 0
2016 PENNECO OIL CO INC 7,966.24 366 546.59 91 0.00 0
2017 PENNECO OIL CO INC 5,493.00 365 534.31 365 0.00 0
2018 PENNECO OIL CO INC 7,194.15 365 144.09 30 0.00 0
2019 PENNECO OIL CO INC 3,610.28 365 463.75 59 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Fracing Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Drilling Fluid Waste 770.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 PENNECO OIL CO INC Produced Fluid 438.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 1,335.19 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 1,335.19 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 249.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 249 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 731 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 731.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 58 Bbl CENT WASTE TRT FAC NPDES PA0095443
2016 PENNECO OIL CO INC Produced Fluid 58.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2017 PENNECO OIL CO INC Produced Fluid 433.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 PENNECO OIL CO INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 104.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1986056 Primary Facility 2011-07-01 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 waiting on cement at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/OGI's D. Catalano and J. Branan.
1986084 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 waiting on bit at time of inspection. 17 1/2" hole at 447'. Cement basket on 13 3/8" mine string to be placed at 392'. Pit lined and freeboard maintained.
1989906 Primary Facility 2011-07-14 Drilling/Alteration No Violations Noted US Energy Rig #4 RD20 tripping out of hole at time of inspection. 7 7/8" hole TD=3175'. Pit lined and freeboard maintained.
1998543 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Drill pit located onsite and it had more than the required two feet of lined freeboard. All erosion controls appeared to be functioning properly and no accelerated erosion or sedimentation was observed in relation to the access road or well-site. At the time of the inspection the operator was pumping water up from Pucketa Creek for well stimulation activities. Operator should continue to monitor the site until all development activities are completed.
2031331 Primary Facility 2012-01-04 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Above ground tanks and pumpjack apparatus located onsite and all appeared to be in sound condition. Site had not as of yet been regraded. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should temporariluy stabilize the site in accordance with 102.22(b) until final site restoration can be completed.
2069607 Primary Facility 2012-05-21 Site Restoration No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, brine tank containment, and pump jack located onsite appear to be in sound working condition. The site has recently been regraded, seed and mulch. The Department suggest the Operator continue to monitor the site to ensure the 70% uniform vegetative coverage criteria is met.

For data sources see[7]

References